HomeMy WebLinkAboutW_Waiver-of-Greenwood-Traffic-Study_170615_v1Jonathan Brandt
From: Brianne Bannwarth <BBannwarth@Rentonwa.gov>
Sent: Friday, June 2, 2017 3:01 PM
To: 'Jonathan Brandt'
Cc: Michael Porter; Kelsey Diller, 'Steve Clark'; Angelea Weihs; Chip Vincent; Ian Fitz -James
Subject: RE: Greenwood traffic study
Hello Jonathan,
Based on the change of use of 6,928 SF light industrial use to office space use, the proposed project is estimated to
increase your net new peak hour vehicular trips are less than 20 trips, therefore a Traffic Impact Analysis is not required.
Please let me know if you have any additional questions.
Take Care,
Brianne Bannwarth, P.E.
Development Engineering Manager
BBannwarth@Rentonwa.gov I Phone: (425) 430-7299
ELECTRONIC PLAN SUBMITTAL AND REVIEW STARTED ON APRIL 3RD!
For more information on Electronic Plan Review, please click here
From: Jonathan Brandt [mailto:jb@ibarch.net]
Sent: Friday, May 26, 2017 3:35 PM
To: Brianne Bannwarth
Cc: Michael Porter; Kelsey Diller; 'Steve Clark; ib@ibarch.net; Angelea Weihs; Chip Vincent
Subject: Greenwood traffic study
Hello Brianne,
We would like you to help us with the Traffic Study for the Greenwood project on 43rd Street
NE/Jones Avenue. Attached is the Site Plan with the square footages and uses for the
building. Let me know if you need anything else.
Thank you kindly,
Jonathan Brandt AM, LEEDAP
Architect & Principal
JB Architecture
206.526.1122 (direct)
206.601.8637 (mobile)
jbQb-a� rch.net
www.jbarch.net