Loading...
HomeMy WebLinkAboutW_Waiver-of-Submittal-Rqmts_170615_v17 Ire] ig DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT C€TY OF - ---"-w�'Renton K. WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE APPLICATIONS Planning Division 1055 South Grady Way -Renton, WA 98057 Phone; 425-430-7200 1 www.rentonwa.go_v LAND USE PERMIT SUBMITTAL REQUIREMENTS: Arborist Report 4 WAIVED BY: MODIFIED BY: COMMENTS: + 1I6 tree re,,-n6v, 0 Biological Assessment 4 Calculations, i t Colored Maps for Display 4 Construction Mitigation Description 2AND4 Deed of Right -of -Way Dedication 1 Density Worksheet 4 Drainage Control Plan 2 Drainage Report 2 vy Elevations, Architectural 3 AND 4 Environmental Checklist 4 Existing Covenants (Recorded Copy)�AND4 Existing Easements (Recorded Copy) 1AN11 Flood Hazard Data 4 Floor Plans 3AND 4 Geotechnical Report2AND3 6�Ly Grading Elevations & Plan, Conceptual 2 Grading Elevations & Plan, Detailed 2 Habitat Data Report 4 Improvement Deferral 2 Irrigation Plano PROJECT NAME:2 DATE;�s' 1 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubnmittalregs.docx Rev: 08/2015 LAND USE PERMIT SUSMMAL REQUIREMENTS: WAIVED BY: King County Assessor's Map Indicating Site 4 MODIFIED BY: COMMENTS: Landscape Plan, Conceptual Landscape Plan, Detailed4 Legal Description 4 Letter of Understanding of Geological Risk 4 Map of Existing Site Conditions4 Master Application Form 4 Monument Cards (one per monument) 1 Neighborhood Detail Map 4 Overall Plat Plan 4 Parking, Lot Coverage & Landscaping Analysis 4 Plan Reductions (PMTS) 4 Post Office Approval z Plat Name Reservation 4 Plat Plan 4 Preapplication Meeting Summary 4 Public Works Approval Lettere Rehabilitation Plan 4 Screening Detail 4 Shoreline Tracking Worksheet 4 Site Plan 2AND4 Stream or Lake Study, Standard i i1 Stream or Lake Study, Supplemental Stream or Lake Mitigation Plan 4 Street Profiles z Title Report or Plat Certificate 1AND4 Topography Map Traffic Study 2 - Tree Cutting/Land Clearing Plan 4'r av r0 ��" ' I'2.e /'�.M i Urban Design Regulations Analysis4 Utilities Plan, Generalized z Wetlands Mitigation Plan, rinal 4 Wetlands Mitigation Plan, Preliminary 4 This Requirement may be waived by: 1. Property Services 2 Development Engineering Plan Review 3 Building 4 Planning