HomeMy WebLinkAboutCM_CUPConstMitigationDescript_BuffaloDesign_170803_v1 1520 fourth avenue suite 400 seattle wa 98101 | 206 467-6306 | buffalodesign.com | page 1 of 2 buffalodesign architecture | interiors August 3, 2017 Conditional Use Permit Application Construction Mitigation Description Project Name and Location King County AFIS Laboratory Replacement Black River Building (existing King County office building) 900 Oakesdale Avenue SW Renton, WA 98057 1. Proposed Construction Dates Construction begins on site: February 1, 2018 Construction complete: October 1, 2018 2. Hours and Days of Operation Primary: 7:00 AM - 5:00 PM, Monday – Friday Occasional: Saturday 7:00 AM - 5:00 PM, to minimize specific construction impacts on other Black River Building tenants for certain activities such as parking lot paving, utility shutdowns, etc. 3. Proposed Hauling/Transportation Routes Construction material transportation will enter the site through a specified existing access from Seventh Street, and will be transported through the existing site. No materials or equipment of significant size or weight will be required by this project. 4. Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise and other noxious characteristics Excavation and construction of an augur-cast piling system will be required for the 3,056 square foot Vehicle Inspection Facility. The Contractor will be required to comply with all State, King County and City dust and noise control requirements through the project specifications and regular oversight by the County construction manager and the project architect. Dust control measures: a. Use of water mist and other suitable methods to limit spread of dust and dirt. b. Use of street sweeping equipment to limit dirt tracking from construction equipment. c. Prohibition of visible emissions of dust from the construction site, including sprinklering. d. Covering truckloads to prevent the escape of dust-bearing materials. e. Control of silica dust generation during concrete work. Traffic and transportation impacts: a. This is a relatively small project. No significant volume of truck traffic is anticipated. b. Whenever possible, material deliveries will be scheduled during hours before or after normal business hours in this commercial occupancy neighborhood. c. The contractor will be required to provide flaggers for materials and equipment deliveries when appropriate. King County AFIS Lab 900 Oakesdale Avenue SW Construction Mitigation Description 1520 fourth avenue suite 400 seattle wa 98101 | 206 467-6306 | buffalodesign.com | page 2 of 2 Erosion and Mud: a. Because of the small scope and location of the proposed building addition, there is a relatively small risk of erosion. A temporary erosion control plan and details are included in this submittal for City approval and the contractor will be required to comply with all applicable requirements. Noise: a. The project site is surrounded by office and business uses that are generally not occupied on the weekend. Activities that produce significant noise such as pavement demolition and excavation will be scheduled for daytime hours on weekends. b. Night time exterior work activities are not anticipated to be necessary to meet the project schedule. A preliminary traffic control plan is included in this submittal. No tower cranes will be used for this project. Hoisting mechanical equipment to the roof of the existing building will require a day use mobile crane for a period of three or four days. This construction activity will be scheduled in coordination with the City.