Loading...
HomeMy WebLinkAboutCline SME ExhibitsNEIGHBORHOOD DETAIL MAP SCALE 1" = 200' 0 500 FT SITE LAKE WASHINGTON PROJECT SITE: LAT: 47.53116° N LON: -122.20510° W NW 1/4 S:32 T:24N R:5E PROJECT INFORMATION VICINITY MAPC L I N E S H O R E L I N E R E P A I R OWNER: SHERRY & ROBERT CLINE SITE ADDRESS: 4267 WILLIAMS AVE N RENTON, WA 98056 PARCEL NUMBER: 0518500230 BODY OF WATER: LAKE WASHINGTON LEGAL DESCRIPTION: BARBEE MILL TGW UND INT IN TRS A,B,C,D,E,F,G, H,I,J,L,M,N,O & P PLAT LOT: 23 PROJECT DESCRIPTION: RE-ANCHOR THREE EXISTING LOGS WITH MANTA RAY SOIL ANCHORS AND BRADED STEEL CABLES. ONE LOG HAS BROKEN LOOSE AND WILL BE REPLACED WITH A LOG OF A SIMILAR SIZE IF IT IS NOT STURDY ENOUGH TO BE RE-ANCHORED. 10 CUBIC YARDS OF BEACH GRAVEL MIX WILL BE ADDED LAND OF THE LOG. A1.0 REVISIONS: DATE:6/26/2017 CLINE SHORELINE REPAIR4267 WILLIAMS AVE NRENTON, WA 98056PROJECT INFO SITE PLAN SECTION Architecture & Design 203 N 36th Street, Ste. 201 Seattle, WA 98103 SHERRY & ROBERT CLINE 4267 WILLIAMS AVE N LAKE WASHINGTON QUENDAL TERMINALS PARCEL # 292405-9002 ROBERT JORGENSEN & ROSEMARY RUSSO 4261 WILLIAMS AVE N S I T E P L A N SCALE 1" = 20'-0" PROP. LINE PROP. LINERE-ANCHOR EXISTING LOGS ALONG SHORELINE ADD 10 CUBIC YARDS OF BEACH GRAVEL ALONG SHORELINE OHWM 21.85' OHWM 21.85' EXISTING ADJACENT LOG (NO WORK) LOG HAS BROKEN LOOSE AND WILL BE REPLACED IF NOT STURDY ENOUGH TO BE RE-ANCHORED 193.17' 193.31'44.31'44.31'SECTION DETAIL SCALE 3/4" = 1'-0" OHW 21.85' INSTALL MANTA RAY SOIL ANCHOR LOG (APPROX 2' IN DIAMETER) INSTALL BRADED STEEL CABLE ADD 10 CUBIC YARDS OF SPAWNING GRAVEL LANDWARD OF LOG Project Narrative Cline Shoreline Repair The proposed project is to re-anchor three existing logs with manta ray soil anchors and braded steel cables and place 10 cubic yards of beach gravel mix landward of one of the logs. The property is located at 4267 Williams Avenue North in Renton Washington. A shoreline exemption is required from the City of Renton. The project site is zoned as Residential 10du/ac (R-10). Adjacent properties are zoned as Residential 10du/ac (R-10) and Commercial Office/Residential (COR). The project site is on the shoreline of Lake Washington and is approximately 0.2 miles from May Creek. Sherry and Robert Cline are the owners of the property. The property is a single family residential lot with an existing single family house. The existing shoreline consists of beach and anchored longs approximately two feet in diameter. The tide downs securing the logs have come loose on one of the logs and loosening on the other two logs. The logs will be re-anchored with manta ray soil anchors and braded steel cables. The condition of the one log that has come loose is questionable and it may be replaced if it is not able to be securely re- anchored or it comes loose and floats away. Ten cubic yards of beach gravel will be placed landward of the log that has broken loose. The purpose of adding the beach gravel is to restore the beach area to its original condition. Some of the beach gravel landward of the log has washed away due to no longer being protected by the log. The existing soil type is norma sandy loam. The work will be done during the in water work window opening between July 16th and December 31st. A floating silt curtain will be placed around the work area to contain turbidity to the work area. The estimated fair market value of the project is $4,000. The work is exempt from the requirement of a shoreline substantial development permit because it is repair of an existing structure in like kind (WAC 173-27-040). The work will take place during the summer or fall of 2017. Authorization from the Army Corps of Engineers and the Washington Department of Fish and Wildlife is required for the project.