HomeMy WebLinkAboutERC_Mitigation_Measures_171103
DETERMINATION OF NON-SIGNIFICANCE – MITIGATED
(DNS-M) MITIGATION MEASURES AND ADVISORY NOTES
PROJECT NUMBER: LUA17-000632, ECF, CU-H, SA-A, MOD
APPLICANT: Michael Kirk, City of Renton Director of Facilities, 1055 S Grady
Way, Renton, WA 98057
PROJECT NAME: Fire Station 15
PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review,
Hearing Examiner Conditional Use Permit, State Environmental Policy Act (SEPA) Review, and a street
modification request for the construction of a new fire station (Fire Station 15) in the Kennydale
Neighborhood. The 1.09-acre site is located at 1404 N 30th St. The vacant parcel is currently a split zoned
parcel. Approximately the first 120 feet of the property from N 30th St is located within the Commercial
Neighborhood (CN) zoning classification and Residential High Density (RHD) land use designation. The
north portion of the property is located within the Residential-6 (R-6) zoning classification and
Residential Medium Density (RMD) land use designation. Improvements to property include a new 7,497
square foot fire station at the south part of the lot and a new water reservoir at the northern portion of
the lot. The two projects are proposing to share an access drive along the west side of the property and
a second driveway would be located closer to the east property line for fire truck exiting. The site slopes
from north to south from approximately 226 feet to 208 f eet (18 feet). The site is located within the
Wellhead Protection Area Zone 2. The two projects would be constructed in two phases. Construction
of the fire station would begin in February 2018 and end on December 2018. Exterior improvements
include parking, driveways, landscaping, pedestrian sidewalks, a nd stormwater improvements. The
applicant has identified 21 significant trees onsite and proposes to retain one (1) tree along the west
side of the property.
The following reports have been submitted with the land use application: Preliminary Technical
Information Report, Arborist Tree Assessment, Trip Generation Assessment, and Geotechnical Report.
PROJECT LOCATION: 1404 N 30th St, Renton, WA 98056
LEAD AGENCY: The City of Renton
Department of Community & Economic Development
Planning Division
MITIGATION MEASURES:
1. The applicant shall comply with the recommendations included in the Kennydale Fire Station 15
Geotechnical Engineering Report, prepared by HWA GeoSciences, Inc. (dated August 31, 2017), or an
updated report submitted at a later date.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 2 LUA17-000632
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for
the land use action.
Planning:
(Contact: Clark H. Close, 425-430-7289, cclose@rentonwa.gov)
1. RMC section 4-4-030C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless
otherwise approved by the Development Services Division.
2. Commercial and other nonresidential construction activities shall be restricted to the hours between
seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays
shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work
shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an
appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where
no further construction work will occur within ninety (90) days. Alternative measures such as mulch,
sodding, or plastic covering as specified in the current King County Surface Water Management Design
Manual as adopted by the City of Renton may be proposed between the dates of November 1st and
March 31st of each year. The Development Services Division’s approval of this work is required prior
to final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre
is being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies
or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within
the area defined by the drip line of any tree to be retained.
6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing
around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards
shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected
Trees” or on each side of the fencing if less than fifty feet (5 0'). Site access to individually protected
trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides.
In addition, the applicant shall provide supervision whenever equipment or trucks are moving near
trees.
7. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible
for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007)
and /or your U.S. Fish and Wildlife Service permit.
Development Engineering:
(Contact: Ian Fitz-James, 425-430-7288, IFitz-James@rentonwa.gov)
1. See Attached Development Engineering Memo dated October 23, 2017.
Fire Authority:
(Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov)
1. Preliminary fire flow is 1,750 gpm. Two fire hydrants are required. One within 150-feet and one within
300-feet. One hydrant exists across the street. One new hydrant shall be provided and be within 50-
feet of the fire department connection for the fire sprinkler system.
ADVISORY NOTES TO APPLICANT
Page 2 of 2 LUA17-000632
2. Approved fire sprinkler and fire alarm systems are required throughout all the buildings. Direct outside
access is required to the fire sprinkler riser room. Fire alarm system is required to be fully addressable
and full detection is required. Separate plans and permits required by the fire department.
3. Fire department apparatus access roadways are required within 150 -feet of all points on the building.
Fire lane signage required for the on-site roadway. Required turning radius are 25-feet inside and 45-
feet outside. Roadways shall be a minimum of 20-feet wide. Roadways shall support a minimum of a
30-ton vehicle and 75-psi point loading.
4. Separate plans and permits are required for any proposed fuel tanks for on -site generators.
Technical Services:
(Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov)
1. Reviewed, no comment.
Community Services:
(Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov)
1. Reviewed, no comment.
Police:
(Contact: Sandra Havlik, 425-430-7520, shavlik@rentonwa.gov)
1. Reviewed, no comment.
Building:
(Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov)
1. Recommendations of the geotechnical report must be followed as a condition of building permits.
2. Update geotechnical report to reflect 2015 International Code criteria.
K:\Projects\2017\PR17000490_FIRE STATION 15\LUA17-000632\08.Review Comments - Drafts\C_Civil Advisory Notes
LU17000632_171023_v1.docx
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: October 23, 2017
TO: Clark Close, Senior Planner
FROM: Ian Fitz-James, Civil Engineer III
SUBJECT: Utility and Transportation Comments for Fire Station 15
LUA17-000632
I have reviewed the application for Fire Station 15 located at 1404 N. 30th Street (KC Parcel
Number 3342103245): and have the following comments:
EXISTING CONDITIONS
The site is approximately 1.09 acres in size and is rectangular in shape. The southern 0.71 acres
of the site is the location of the proposed Fire Station 15. The northern 0.38 acres of the site is
the location of the proposed Kennydale Reservoir. The site is currently vacant with large grassy
areas and some trees. The existing conditions below apply to the whole parcel.
WATER: Water service is provided by the City of Renton. The site is in the Highlands service
area in the 435’ hydraulic pressure zone. The approximate static water pressure is 98 psi at a
ground elevation of 210’.
There is an existing 12” water main south of the site in N. 30th Street that can deliver 2,800
gallons per minute (gpm). Reference project file WTR2700456 in COR Maps for record drawings.
The site is served by an existing 3/4” domestic water service.
There are two existing fire hydrants in the vicinity of the site. One is located across N. 30th
Street from the site’s southwest corner (COR Facility ID HYD-N-00001). The other is located at
the southwest corner of N. 30th Street and Interstate 405 ramp approximately 215’ from the
site’s southeast corner.
SEWER: Sewer service is provided by the City of Renton. There is an existing 8” concrete sewer
flowing from east to west south of the site in N. 30th Street. There is also an existing 8” concrete
sewer flowing from north to south along the eastern boundary of the site. The sewer begins at
a manhole (COR Facility ID MH3489) approximately 130’ feet north of the site’s southeast corner
and connects to the sewer main in N. 30th Street mentioned above. Reference Project File
WWP2700179 in COR Maps for record drawings of both sewer mains.
STORM DRAINAGE: The project site is currently vacant. The site consists of grassy areas with
some trees scattered throughout. The site slopes gently from the northeast to the southwest.
There is no existing on-site conveyance system. There is an existing 12” piped conveyance
system that flows from east to west along N. 30th Street frontage. There are two type 1 catch
basins along the project frontage that drain to this conveyance system. One is near the site’s
Fire Station 15 – LUA17-00632
Page 2 of 8
October 23, 2017
K:\Projects\2017\PR17000490_FIRE STATION 15\LUA17-000632\08.Review Comments - Drafts\C_Civil Advisory Notes
LU17000632_171023_v1.docx
southeast corner (COR Facility ID 134250). The other is located near the site’s southwest corner
(COR Facility ID 134231). The City does not have record drawings for this system.
STREETS: N. 30th Street south of the site is classified as a minor arterial street. The N. 30th
Street existing street section consists of a pavement width of approximately 42’ with a 13’ travel
lane in each direction and an 8’ parking lane on both sides of the street. A 0.5’ curb and a 5’
concrete sidewalk directly behind the curb exist along each side of the pavement. The existing
right of way width for N. 30th Street is approximately 60’ for the majority of the frontage per the
King County Assessor’s Map. The existing right of width for N. 30th Street adjacent to a portion
of the eastern frontage is 72’ per the King County Assessor’s Map.
WATER COMMENTS
1. The utility plan shows one new fire hydrant on private property. The hydrant is served
off of the new 16” water main that will be installed in the shared driveway to serve the
new Kennydale Reservoir north of the Fire Station. All fire hydrants on private property
shall be located in a public utility easement.
2. A fire sprinkler stub with a double detector check valve assembly (DDCVA) in an exterior
underground vault within private property per COR Std. Plan 360.2 is required. The
DDCVA may be installed in the building if it meets the conditions as shown on COR Std.
Plan 360.5 for the installation of a DDCVA inside a building.
The utility plan shows a 4” fire line connected to the new 16” water main that will serve
the new Kennydale Reservoir. The DDCVA is shown in a sprinkler riser room in the rear
of the building in the submitted architectural plans. A post indicator valve (PIV) per City
standards is required on the fire line. The fire sprinkler stub and appurtenance shall be
sized by a registered fire sprinkler designer / contractor. A Fire Department Connection
(FDC) is provided at the corner of the shared driveway and rear parking lot. The FDC is
within 50’ from the proposed fire hydrant.
Per COR Std. Plan 360.5, the DDCVA shall be within 50’ of the public water main
easement boundary or right of way line. The DDCVA as shown is 96’ from the water
main. This is not in compliance with COR Std. Plan 360.5. The plans submitted for
construction permit review shall be revised to show compliance.
3. The utility plan shows a 2” domestic water service and meter for domestic water use.
The service is connected to the new 16” water main that will serve the new Kennydale
Reservoir. The plan shows the meter on private property. The meter shall be located in
a public utility easement. A reduced pressure backflow assembly (RPBA) shall be
installed behind the meter within private property. The RPBA shall be installed in an
above ground heated enclosure per COR Std. Plan 350.2. The RPBA may be located
inside the building if a drainage outlet for the relief valve is provided and the location is
approved by the City Plan Reviewer and City Water Utility Department. The submitted
architectural plans do not show a location for the RPBA in the building.
Fire Station 15 – LUA17-00632
Page 3 of 8
October 23, 2017
K:\Projects\2017\PR17000490_FIRE STATION 15\LUA17-000632\08.Review Comments - Drafts\C_Civil Advisory Notes
LU17000632_171023_v1.docx
4. The utility plan shows the existing 3/4” water meter being relocated and reused for
irrigation service. The plan shows the meter located on private property in the garage
drive aisle. This meter should be located outside of the drive aisle and contained in a
public utility easement if on private property. A double check valve assembly (DCVA) on
private property is required behind the meter per COR Std. Plan 340.8.
5. Water system improvements shall be designed in accordance with Appendix J of the
City’s 2012 Water System Plan. Adequate horizontal and vertical separation between
new water mains and other existing and proposed utilities (sewer lines, storm drains,
gas lines, power and communication ducts) shall be provided for the operation and
maintenance of the water main. Retaining walls, rockeries, or similar structures cannot
be installed over the water main unless the water main is installed inside of a steel
casing.
6. The site is located within Zone 2 of the City’s Aquifer Protection Area.
7. Per RMC 4-1-180B-2b, City-owned properties are exempt from all system development
charges.
SEWER COMMENTS
1. The utility plan shows a new 6” side sewer connecting to the existing 8” sewer main
along the eastern property frontage. The new side sewer shall run at a slope of at least
2% from the building to the main.
2. The utility plan shows a new oil/water separator located outside of the building in the
garage drive aisle. All wastewater from the garage area shall be routed through this
oil/water separator. A specification for the oil/water separator should be included with
the construction plans. The oil/water separator shall be approved by the City Plan
Reviewer and City Wastewater Utility Department prior to construction permit issuance.
3. A 10’ utility easement will be required for the existing sewer main along the eastern
property line.
4. Per RMC 4-1-180B-2b, City-owned properties are exempt from all system development
charges.
STORM DRAINAGE COMMENTS
1. A drainage plan and Technical Information Report (TIR) prepared by LPD Engineering
dated September 22, 2017 were submitted to the City as part of the site plan submittal.
The site is located in the City’s Peak Rate Flow Control Standard (Existing Site
Conditions). The site is located in the East Lake Washington drainage basin. The TIR
was completed in accordance with the standards found in the 2017 Renton Surface
Water Design Manual (RSWDM). All nine core and six special requirements were
addressed.
Fire Station 15 – LUA17-00632
Page 4 of 8
October 23, 2017
K:\Projects\2017\PR17000490_FIRE STATION 15\LUA17-000632\08.Review Comments - Drafts\C_Civil Advisory Notes
LU17000632_171023_v1.docx
The project proposes to route the majority of the on-site impervious surfaces to a
Brentwood Stormtank Detention system located between the Fire Station and N. 30th
Street to meet Core Requirement #3 – Flow Control Facilities. A flow control riser tee is
located downstream of the detention system. The TIR shows that the 2-yr and 100-year
peak runoff rates are matched but the 10-year runoff rate is not matched. Per Section
1.2.3.1 of the 2017 RSWDM, the developed peak discharge rates must match the
existing peak discharge rates for the 2-yr, 10-yr, and 100-yr return periods. The project
will be required to show compliance with this requirement at the time of construction
permit review to satisfy Core Requirement #3. The Stormtank system, Stormfilter or
other water quality treatment facility, bioretention facility, pervious pavement, catch
basin, and stormwater conveyance on the site will be private maintained. A recorded
stormwater covenant for maintenance of the stormwater facilities and on-site BMPs will
be required.
The Stormtank system as proposed does not meet the requirements for a detention
tank per Section 5.1.2 or a detention vault per Section 5.1.3. The revised TIR and
construction plans shall clearly show how the Stormtank system meets all of the
requirements of either a detention tank or detention vault. If not all of the
requirements can be met, a stormwater adjustment per Section 1.4 would have to be
submitted and approved prior to issuance of the construction permit. City staff would
not support an adjustment to omit requirements related to access, maintenance,
height, sediment storage, or ventilation.
A simple conveyance calculation was submitted in the TIR. The engineer shows that the
pipe segment that discharges stormwater from the site to the City’s piped stormwater
conveyance system can convey the 25-year flow from the entire site if it were
impervious. This conveyance calculation is shown to demonstrate compliance with Core
Requirement #4 – Conveyance System.
As the Fire Station will require a commercial building permit, Enhanced Basic Water
Quality treatment is required unless such treatment is waived or reduced by the area-
specific exceptions found in Section 1.2.8.1 to satisfy Core Requirement #8 – Water
Quality Facilities.
According to the TIR, the project proposes approximately 8,965 square feet of pollution
generating impervious surface (PGIS). The project proposes to treat the PGIS from the
shared driveway and the driveway from the Fire Station to N. 30th Street using a
Stormfilter system. A Stormfilter system is an acceptable treatment option for Basic
Water Quality treatment however it is not acceptable as a standalone option for
Enhanced Basic Water Quality treatment. The plans and TIR should be updated to show
compliance the Enhanced Basic Water Quality treatment standard by providing an
Enhanced Basic Water Treatment facility per Section 6.1.2 unless exempted per Section
1.2.8.1 for all PGIS on the site. PGIS with permeable pavement may be exempted for
the water quality standards if the Soil Treatment Exemption found in Section 1.2.8 is
met for the soils underneath the pavement. If this exemption is pursued a letter from a
Fire Station 15 – LUA17-00632
Page 5 of 8
October 23, 2017
K:\Projects\2017\PR17000490_FIRE STATION 15\LUA17-000632\08.Review Comments - Drafts\C_Civil Advisory Notes
LU17000632_171023_v1.docx
geotechnical engineer will be required stating that all of the criteria are met. Permeable
pavement alone is not a water quality treatment facility.
The TIR and plans do not show treatment of the drive apron on the north side of the
building. This area needs to be treated by an acceptable water quality facility. The
areas on the southern end of the shared driveway and the driveway between the Fire
Station and N. 30th Street that are not being treated by a water quality treatment facility
are less than 5,000 square feet in area.
The project is required to implement on-site BMPs per Section 1.2.9 to satisfy Core
Requirement #9 – On-Site BMPs. On-site BMPs need to be evaluated in order of
preference as required per Section 1.2.9.2.2. This evaluation should be included in the
updated TIR that is submitted for construction permit review. The TIR did not have
infiltration testing results from the geotechnical engineer when designing the on-site
BMPs proposed on the plan.
The TIR determined that full dispersion and full infiltration are infeasible. The updated
TIR should clearly explain how full infiltration is infeasible per Section 5.2. The TIR and
plans propose to use bioretention and permeable pavement for on-site BMPs. The
updated TIR and plans must clearly show how each of these BMPs are implemented to
the maximum extent feasible. After implementation of those BMPs to the maximum
extent feasible, the project must ensure that the minimum BMP implementation per
Section 1.2.9.2.2 #5 is met. For projects that will result in an impervious surface
coverage greater than 65% of the buildable portion of the site / lot, on-site BMPs must
be applied to 20% of the target impervious surfaces or to an impervious area equal to at
least 10% of the site/lot, whichever is less.
The updated TIR and plans should show compliance with all biorentenion design
standards per Section 2.6 and permeable pavement design standards per Section 2.7.
Bioretention with underdrains is not allowed for Core Requirement #9 unless approved
by a stormwater adjustment.
2. The drainage plan shows that the existing N. 30th Street flowline adjacent to the site will
remain in the same location. The storm drainage from the project will tie into the
existing 12” piped conveyance system along this flowline.
3. A geotechnical report evaluating site soil conditions was prepared by HWA Geosciences
dated August 31, 2017. Per the geotechnical report, the site is underlain by recessional
outwash soils. The outwash soils were classified as loose to medium dense. The report
notes that there is about 5-7’ of sandy silt soils with a high percentage of fines were
encountered. The report recommends that these soils are over-excavated and
backfilled with free-draining granular material such as pea gravel where pervious
pavement and the bioretention pond are proposed.
A pilot infiltration test (PIT) was performed on the site in the location of the proposed
bioretention pond. The PIT was performed at a depth of 7’. The report notes that
Fire Station 15 – LUA17-00632
Page 6 of 8
October 23, 2017
K:\Projects\2017\PR17000490_FIRE STATION 15\LUA17-000632\08.Review Comments - Drafts\C_Civil Advisory Notes
LU17000632_171023_v1.docx
cleaner sands are encountered at approximately 7’ below the surface. The two areas
were excavated to a depth of approximately 3’ below grade. Based on the test results,
the geotechnical engineer concluded that a long-term infiltration rate of 1.1 in/hour be
used for design assuming the upper 7 feet of soil (silty material) was removed.
5. Per RMC 4-1-180B-2b, City-owned properties are exempt from all system development
charges.
TRANSPORTATION/STREET COMMENTS
1. Transportation impact fees do not apply to this project.
2. N. 30th Street is classified as a minor arterial. Per RMC 4-6-060, the minimum right of
way width for a minor arterial with four lanes is 91’. The paved roadway section is 54’
consisting of 4 – 11’ travel lanes and 2 – 5’ bike lanes. A 0.5’ curb, 8’ planter, 8’
sidewalk, and 2’ clear from the back of sidewalk are required along each side of the
roadway. The King County Assessor’s Map shows a current right of way width of
approximately 60’ to 72’ for N. 30th Street adjacent to the site. A right of way dedication
of approximately 15.5’ would be required along the project frontage.
3. The applicant submitted a street modification request dated September 28, 2017 with
the land use application. The street modification request is to modify the minor arterial
street section per RMC 4-6-060 to a modified minor arterial street section. Specifically
the applicant requests a street section that keeps the current curb line in its existing
location along the northern frontage of N. 30th Street adjacent to the site with an 8’
planter, 8’ sidewalk, and 2’ clear from back of sidewalk. The applicant proposes a right
of way dedication of approximately 11’ along the project’s N. 30th Street frontage to
accommodate the modified minor arterial street section improvements. The applicant
also requested a waiver of installation of the frontage improvements. The applicant
proposes to keep the existing sidewalk in its current location.
City staff is recommending approval of the applicant’s street modification request.
Please see the Street and Driveway Modification Criteria and Analysis for a complete
summary of the request, staff analysis, and staff recommendation. City staff is not
recommending approval of the waiver of installation of frontage improvements. City
staff recommends that approximately 11’ of right of way be dedicated along the
project’s N. 30th Street frontage and frontage improvements in accordance with the
modified minor arterial street section be installed. The construction plans submitted for
construction permit review should be updated to show these improvements.
The applicant also proposes to modify the maximum driveway width from 30’ to 36’ for
the driveway from the Fire Station garage to N. 30th Street.
City staff is recommending approval of the applicant’s driveway modification request.
Please see the Street and Driveway Modification Criteria and Analysis for a complete
summary of the request, staff analysis, and staff recommendation.
Fire Station 15 – LUA17-00632
Page 7 of 8
October 23, 2017
K:\Projects\2017\PR17000490_FIRE STATION 15\LUA17-000632\08.Review Comments - Drafts\C_Civil Advisory Notes
LU17000632_171023_v1.docx
4. A shared driveway is proposed along the western property frontage to provide access to
the rear of the Fire Station and to the Kennydale Reservoir. The proposed shared
driveway meets all design standards found in RMC 4-6-060. The shared driveway is
approximately 197’ in length (before right of way dedication), has a pavement width of
16’ – 24’, and a grade of less than 15%. Where feasible, drainage from the shared
driveway will be captured by the site’s conveyance system and routed to the onsite
stormwater detention system.
5. The proposed driveway curb cut for the shared driveway is 20’ in width and is located 5’
from the adjacent property line. This meets the driveway width standards found in RMC
4-4-080. City staff recommends approval of a modification to the maximum driveway
width to 36’ for the driveway from the Fire Station garage to N. 30th Street. Please see
the Street and Driveway Modification Criteria and Analysis for a complete summary of
the request, staff analysis, and staff recommendation.
6. A Trip Generation Memo prepared by Transpo Group dated July 11, 2017 was submitted
to the City as part of the site plan submittal. The Institute of Transportation Engineers
(ITE) Trip Generation Manual 9th Edition does not publish trip generation rates for a fire
station. The memo looked at trip generation based upon staffing information from the
Renton Regional Fire Authority (RRFA), estimates on visitors and miscellaneous trips to
the site, and emergency call information from the RRFA.
The memo notes that the Fire Station will have the capacity for 3 employees. The
employees will work 24-hour shifts with shift change occurring daily at 8:00 AM per the
RRFA. Thus the memo assumes the Fire Station will generate a total of 6 trips per day
(one inbound and one outbound) for the employees in the peak AM hours (6:00 – 9:00).
The memo estimates visitors and miscellaneous trips to the Fire Station. There is
assumed to be 20 non-employee trips to the site (10 entering and 10 existing). 20
percent of these trips are expected to occur in the AM and PM peak hours. Thus, 4 total
trips are expected in each the AM and PM peak hours.
The memo also estimates that 20 emergency vehicle trips are expected to occur on an
average weekday. This is based on information provided by the RRFA regarding the
anticipated response calls that will be fielded by this station. 20 percent of these trips
are expected to occur in the AM and PM peak hours. Thus 4 total trips are expected in
each of the AM and PM peak hours.
The memo concludes that Fire Station 15 will generate 14 trips in the AM peak hours
(6:00 – 9:00) and 8 trips in the PM peak hours (3:00 – 6:00). The City requires a Traffic
Impact Analysis if new vehicular traffic exceeding 20 vehicles per hour in either the AM
or PM peak hours is generated by a development. As this project does not meet that
threshold, no further review is needed.
City staff is in agreement with the findings of this memo and will not require any further
studies.
Fire Station 15 – LUA17-00632
Page 8 of 8
October 23, 2017
K:\Projects\2017\PR17000490_FIRE STATION 15\LUA17-000632\08.Review Comments - Drafts\C_Civil Advisory Notes
LU17000632_171023_v1.docx
7. Street lighting per City standards is required along the N. 30th Street frontage. A street
lighting analysis and plan shall be submitted with the construction permit.
8. Advanced warning signs for the Fire Station along N. 30th Street per MUTCD standards
are required.
9. Paving and trench restoration within the City of Renton right of way shall comply with
the City’s Restoration and Overlay requirements.
GENERAL COMMENTS
1. All new utility lines (i.e. electrical, phone, and cable services, etc.) within the site must
be underground. The construction of these franchise utilities must be inspected and
approved by a City of Renton inspector.
2. Retaining walls that are 4’ or taller from bottom of footing and stormwater detention
vaults will require a separate building permit. Structural calculations and plans
prepared by a licensed engineer will be required as part of the building permit review.
3. All civil plans shall conform to the current City of Renton survey and drafting standards.
Current drafting standards can be found on the City of Renton website.
4. A separate plan submittal will be required for a construction permit for utility work and
street improvements. All plans shall be prepared by a licensed Civil Engineer in the
State of Washington.
5. Please see the City of Renton Development Engineering website for the Construction
Permit Application and Construction Permit Process and Submittal Requirements.
Please contact the City to schedule a construction permit intake meeting.
6. All plan review for the City is now paperless. Please see http://rentonwa.gov/paperless/