Loading...
HomeMy WebLinkAboutRS_Technical Information Report_170801_v17513 SF12335 SF7508 SF7552 SF7508 SF7505 SF1402 SF7612 SF7675 SF7505 SF7633 SF7588 SF8456 SF8460 SF8460 SF7503 SFSDSDSDSDSDSDSDSDSDSDDX XXXXXXXXXXXXXXXXXXXXX XXXXXXXXXX XXX XXXXXXXXXXXXXXXXRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDWDWDWDWDWDWDWDRDRDWDWDWDWDWDSD #7, TYPE II-48 CBw/ THROUGH CURB INLETSD #13, TYPE I CBSD #11, TYPE II-48 CBSD #12, TYPE I CBSD #10, TYPE II-48 CBSD #9, TYPE I CBSD #9A, TYPE I CBSD #16, TYPE I CBSD #15, TYPE I CBSD #14A, TYPE I CBSD #14, TYPE I CBSD #6, TYPE II-54 MHw/ SPILL CONTROLSD #8, TYPE I CBw/ THROUGH CURB INLETSD #4, TYPE I-54 MHSD #3, TYPE II-48 CBw/ SOLID LOCKING LIDSD #2A, TYPE I CBw/ SOLID LOCKING LIDSE 80TH STREET (UNIMPROVED ROW)112TH AVENUE NE(UNIMPROVED ROW)113TH AVENUE SESE 79TH ST. SE 80TH ST.0120802040SCALE: 1" = 40'SE 80TH ST.115253674910111213148TRACT C(ACCESS)TRACT B(ACCESS)TRACT E(CRITICAL AREA)TRACT A(LANDSCAPE)TRACT D(ACCESS)ROAD "A"RHODODENDRON RIDGEREV NO.DATEDESCRIPTIONMADE BYCHECKEDKING COUNTYERP PLAN SETPLOTTED:SHEETJOB NO. 14134iCAP RHODY RIDGE, LLCCITY OF NEWCASTLEWASHINGTONSE 1/4, SE 1/4 SECTION 29, TOWNSHIP 24 N, RANGE 5 E, W.M.CITY OF NEWCASTLE, KING COUNTY, WASHINGTONDRAWN:APPROVED:DESIGNED:BPF, SPKJGAPPROVED FOR CONSTRUCTIONDATE:BY:CITY OF NEWCASTLETHESE DRAWINGS ARE APPROVED FOR CONSTRUCTION FOR A PERIOD OF 12MONTHS FROM THE DATE SHOWN HEREON. THE CITY RESERVES THE RIGHTTO MAKE REVISIONS, ADDITIONS, DELETIONS, OR MODIFICATIONS SHOULDCONSTRUCTION BE DELAYED BEYOND THIS TIME LIMITATION. THE CITY, BYAPPROVING THESE DRAWINGS, ASSUMES NO LIABILITY IN REGARDS TOTHEIR ACCURACY OR OMISSIONS.M:\ACAD\PLATS\14\14134\Drainage Exhibits\14134E01.dwg6/22/17 11:10SpasztorSPKnow what'sbelow.before you dig.CallR6/7/17STORM CONVEYANCESUBBASIN PLANLEGENDPROJECT BOUNDARYPROJECT BOUNDARY (TYP)9OFF-SITE OUTFALL TO CITY OFRENTON STORM SYSTEMSD #7SD #14SD #16SD #9SD #12SD #9ASD #13SD #8SD #14ASD #15SD #4SD #4ASD #4SD #4A, 12"AREA DRAINSD #5, 8'x11' PEAKDIVERSION STORMFILTER6/7/17SUBBASIN BOUNDARYSD #7SUBBASIN NAMESD #4B, 12"AREA DRAINSD #4B Rhododendron Ridge June 2017 Technical Information Report 14134-1 Chapter6 TIR 0617.doc 6-1 6. Special Reports and Studies Wetland and Stream Reconnaissance – 11230 113th Ave. SE Newcastle, by Altmann Oliver Associates, LLC; July 9, 2014 Geotechnical Engineering Study Rhododendron Ridge – Southeast 80th Street and 113th Ave. SE Newcastle, by Earth Solutions NW, LLC; January 29, 2015 Geologic Document Review and Site Reconnaissance – 11230 SE 80th St. Newcastle, by Associated Earth Sciences, Inc.; June 7, 2016 Wetland and Stream Reconnaissance – SE 80th Corridor Renton, by Altmann Oliver Associates, LLC; November 19, 2016 Rhododendron Ridge June 2017 Technical Information Report 14134-1 Chapter7 TIR 0617.doc 7-1 7. Other Permits Preliminary Plat File No.: SUB15-002, SEPA15-005 FPA (if required) NPDES (if required) City of Renton Critical Areas Exemption Engineering Review Permit (ERP) Building Permits -Residential Stormwater Vault Building Permit ROW Permits Appendix B Wetland and Stream Reconnaissance Appendix C Off-Site Stormwater Outfall Plan and Analysis