HomeMy WebLinkAboutPN_Project Narrative_170403_v1Project narrative
BOEING COMMERCIAL AIRPLANE GROUP
RENTON WASHINGTON
Repair air leak, Apron A
737 Logan avenue north Renton WA 98055
Adjacent to the shoreline of the Cedar River
Adjacent to Boeing Renton Apron A and Renton municipal Airport
Master use permit, Environmental Checklist, Substantial Shoreline development
permit is the land use permits for the proposed projects.
Zoning designation is Urban Center north 2
Boeing Commercial Airplane plant in Renton to the Renton Airport
The Cedar River & Lake Washington are the Special site features
Sandy silt loam is the soil type. The work is within 200 ft. of the ordinary high
water mark of the Cedar River
The North area of the Cedar River has abundant variety of fish and wildlife
No trees will be removed. No vegetation to be disturbed along the bank
.
No views will be obstructed by the proposed project
The project is 100% impervious surface
Cost of the task is approx.. $20,000.00
The project consists of one task at the Renton Municipal airport Boeing
Apron D
Repair Air Leak in 4” buried pipe
Replace leaking valve and flanges with a welded straight section of 4” pipe.
Location of work is just East of Apron A North entrance gate on East Perimeter
Road along of the Cedar River.
Description of Work: Repair air leak near Apron A North
Entrance
Scope of Work
The scope of work for this task involves removal of an existing 4”
compressed air isolation valve and the flanges on either side. The flange is
leaking. The valve is leaking at the flanges. As it was used a construction
isolation valve and is no longer needed, the valve and flanges will be
removed. They will be replaced by a new approximately 3’ long section of
4” steel pipe. The connection method will be welding. The pipe is to be
corrosion coated and then wrapped for protection as it is buried.
A 5’ X 5’ area will be excavated, the repair will take place, fill will be added
and then covered with new asphalt. Impervious surface disturbance is
approx. 10 sq. ft.
The project will replace 10 sq. ft. of existing Asphalt pavement.