Loading...
HomeMy WebLinkAboutSHORELINE EXEMPTION FORMDEPARTMENT OF COMMUNITYI T'' °F AND ECONOMIC DEVELOPMENT —Renton ' SHORELINE TRACKING WORKSHEET Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 1 www.rentonwa.eov The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site? ❑ Yes ❑x No; If yes, fill out table below. If no, see "Site Conditions" Section 2 below. What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials: NA NA Linear Feet of Soft Materials: NA Examples of Types of Bulkheads: Hard (e.g. rocks, wood); Soft (e.g. sand, plants); Combination -soft materials at the water with hard materials further inland, or a combination of hard and soft materials at the water. SITE CONDITIONS List the size (in square feet) and type of all structures (151 floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). Manufacturing facility 178,200 sq ft. Purpose of Shoreline Exemption is for tree removal located on the east side of the Trojan Lithograph building, damaging the building. 3. List distance (in feet) from the water to the closest point of each structure. List each building separately (e.g. shed, dock, carport). idGl 4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway, patio). 1 C:\Users\Sandy.burns\Desktop\Shoreline Tracking Worksheet.docx Rev:08/2016 385,506 sq ft — building & parking lot 5. List distance (in feet) from the water to the closest point of each impervious surface (hard surface). 6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. Proposed tree removal is on Trojan Lithograph property, which is maintained vegetation. There is natural vegetation on the easement to the east of Trojan property next to the shoreline. The purpose of the Shoreline Exemption is for tree removal for maintenance of existing structure. No other vegetation is proposed for removal. 7. Will the project require any added fill? If so, how many cubic yards will be added: M IN WATER AND OVER WATER STRUCTURES 8. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)? Dyes ❑X No; If yes, fill out the table below. Describe the in- and over -water structures on your site C:\Users\Sandy.burns\Desktop\Shoreline Tracking Worksheet.docx Rev: 08/2016 C:\Users\Sandy.burns\Desktop\Shoreline Tracking Worksheet.dou Rev:08/2016 Type Surface Area Light Penetrating Materials (e.g. dock, float, bridge, (in square feet, if (the percentage of the surface mooring pile, boat lift, etc.) applicable) area that is made of material that allows light to reach the water) Existing NA NA NA structures to remain Existing NA NA NA structures that will be removed Proposed NA NA NA structures C:\Users\Sandy.burns\Desktop\Shoreline Tracking Worksheet.dou Rev:08/2016