GEOTECHNICAL ENGINEERING STUDY
PROPOSED SHORT PLAT
3810 PARK AVENUE NORTH
RENTON,WASHINGTON
ES-5134
RECEIVED
07/26/2017 aweihs
PLANNING DIVISION
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutions
NW LLC and Environmental Sciences
Vicinity Map
Matveyev Short Plat
Renton,Washington
MRS
CGH
04/28/2017
April 2017
5134
1
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
Reference:
King County,Washington
Map 626
By The Thomas Guide
Rand McNally
32nd Edition
SITE
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutions
NW LLC and Environmental Sciences
NORTH
0 2 0 4 0 8 0
Sc ale in Feet1"=4 0 '
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
NOTE:The graphics shown on this plate are not intended for design
purposes or precise scale measurements,but only to illustrate the
approximate test locations relative to the approximate locations of
existing and /or proposed site features.The information illustrated
is largely based on data provided by the client at the time of our
study.ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
LEGEND
Approximate Location of
ESNW Test Pit,Proj.No.
ES-5134,Mar.2017
Subject Site
Existing Building
Test Pit Location Plan
Matveyev Short Plat
Renton,Washington
MRS
CGH
05/01/2017
May 2017
5134
2
TP-1
TP-2
TP-4
TP-3
House
Garage
Shed
Landscaping
Pond
TP-1
Asphalt Driveway
PARK AVENUE N.130 140
130
140
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
and Environmental Sciences
EarthSolutionsNWLLC
EarthSolutions
NW LLC
RETAINING WALL DRAINAGE DETAIL
Matveyev Short Plat
Renton,Washington
MRS
CGH
05/01/2017
May 2017
5134
3
NOTES:
Free Draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing #4 should be 25 to
75 percent.
Sheet Drain may be feasible in lieu
of Free Draining Backfill,per ESNW
recommendations.
Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1"
Drain Rock.
LEGEND:
Free Draining Structural Backfill
1 inch Drain Rock
18"Min.
Structural
Fill
Perforated Drain Pipe
(Surround In Drain Rock)
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
and Environmental Sciences
EarthSolutionsNWLLC
EarthSolutions
NW LLC
FOOTING DRAIN DETAIL
Slope
Perforated Rigid Drain Pipe
(Surround with 1"Rock)
18"(Min.)
NOTES:
Do NOT tie roof downspouts
to Footing Drain.
Surface Seal to consist of
12"of less permeable,suitable
soil.Slope away from building.
LEGEND:
Surface Seal;native soil or
other low permeability material.
1"Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAW ING
Matveyev Short Plat
Renton,Washington
MRS
CGH
05/01/2017
May 2017
5134
4