Loading...
HomeMy WebLinkAboutFawcett LLA Principles of AcceptabilityDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Principles of Acceptability of Lot Line Adjustment M E M O R A N D U M DATE: November 27, 2017 TO: Official File / LUA17-000470 Fawcett Lot Line Adjustment FROM: Angelea Weihs, Associate Planner SUBJECT: Principles of Acceptability of a Lot Line Adjustment Section 4-7-060B, lists 4 principles of acceptability that the Administrator or designee considers, along with all other relevant information, when making a decision on a Lot Line Adjustment application. A lot line adjustment shall be consistent with the following principles of acceptability: Check the appropriate box and give analysis, if necessary: Correcting: Adjust lot lines including the elimination of a common lot line in order to correct property line or setback encroachments; Staff Analysis: Not applicable. Improving: Create better lot design, or improve access; Staff Analysis: The purpose of this Lot Line Adjustment is for the City to expand a parcel of land to increase the park along May Creek for the benefit of the City and for public use. The park north of May creek is presently called the May Creek Trail and is used by the public as a nature path along the creek. The Fawcett property, whi ch is south of May Creek, is currently vacant and consists of a variety of trees and blackberry bushes. The desired acquisition by the City will be approximately 5.1 acres for the expansion of the May Creek Trails. The applicant is requesting a Lot Line Adjustment to adjust the lot lines between parcels 3224059081 (Lot A), 3224059043 (Lot B), and 3224059109 (Lot C). The parcels are located along the east frontage of Lake Washington Blvd. N, between N 41st ST and N 43rd ST. All three lots are within the Residential-6 (R-6) zone. Lot A is currently vacant, Lot C is city property and is developed with a city trail, and Lot B is developed with a single family home. The properties were annexed into the City as part of the Kennydale Annexation via Ordinance #2341 on July 3, 1967. Lot A (future Lot 1) is decreasing from 241,086 square feet to 13,999 square feet, Lot C (future Lot 3) is increasing from 134,547 square feet to 357,673 square feet, and Lot B (future Lot 2) is increasing from 20,833 square feet to 24,794 square feet. The applicant Fawcett Lot Line Adjustment Page 2 of 3 November 27, 2017 Principles of Acceptability of Lot Line Adjustment proposes to adjust the parcels shared property line south approximately 240 feet. All three lots would meet minimum lot size, width, and depth requirements for the R-6 zone. The lot line adjustment creates a better lot design as it results in Lot C (future Lot 3) providing an appropriate amount of area for future Park expansion, and it creates further separation between developable lots and critical areas, including May Creek and associated wetlands. In addition, Lot B (future Lot 2) will acquire public street frontage for access. Approval Criteria: a. An additional lot, parcel or tract shall not be created; and b. The subject lots, parcels or tracts are within the same zoning district; and c. The proposed adjustments shall not cause the lots, parcels or tracts to increase the nonconformity with respect to applicable zoning (see RMC 4-2), subdivision and other code requirements pertaining to lot design, building location, and development standards; and d. The adjusted lot line(s) is shared by the subject lots. Staff Analysis: No additional lots or tracts were created as part of this lot line adjustment. The adjusted lot lines are shared by the subject lots. All three lots are located within same zoning designation and conform to the R-6 development standards of the R-6 zone. Non-Evasive: Lot line adjustments shall not serve to eliminate or circumvent any state or local requirements, including but not limited to frontage improvements, payment of fee-in-lieu, payment of latecomer fees or the installation of required infrastructure. a. Assessment of fees, right-of-way dedication and frontage improvements for the entire length of the property line(s) bordering rights-of-way may be required as a condition of approval for a lot line adjustment. b. Lots, parcels or tracts that are increased in area by lot line adjustments shall not be permitted to be subdivided for five (5) years following the date upon which the lot line adjustment is recorded or three (3) years following the approval of a lot line adjustment, whichever is longer, unless the following is met: I. The subdivision application includes all lots, parcels and tracts involved in the lot line adjustment in the overall subdivision; or Fawcett Lot Line Adjustment Page 3 of 3 November 27, 2017 Principles of Acceptability of Lot Line Adjustment II. All required infrastructure, including but not limited to frontage improvements, required infrastructure and utility lines are constructed along the frontage of all lots included in the lot line adjustment. (Ord. 5728, 10 -20- 2014) Staff Analysis: The proposed lot line adjustment would result in a reconfiguration of the three above-referenced lots that would add 223,126 square feet (5.1 acres) to Lot C (future Lot 3) for the purposes of expanding city park property. This decision to approve the proposed lot line adjustment did not include frontage improvements, right-of-way dedication, payment of fee in-lieu, or latecomer agreement. Applicant for all three lots would be subject to such requirements at such time building permits are submitted to the City. Existing Lot Configuration: