HomeMy WebLinkAboutCM_Construction_Mitigation_Description_170817_v1 (2)Moorman Short Plat
Construction Mitigation Description
Short Plat Application Page 1 of 1
Proposed Construction Dates
Grading and road construction will start upon approval of construction plans in 2018.
Hours of Operation for Single Family Construction Site
Per City of Renton:
Monday – Friday: 7am – 8pm
Saturday: 9am – 8pm
Sunday: None
Proposed Hauling/Transportation Routes
All equipment materials and laborers will enter the site off N 40th Street. A detailed haul route will be
provided by the contractor selected to construct the improvements. It is anticipated that the haul route
would be via I-405 to Exit 2B SR 515 (Talbot Road) then south from the off ramp to South 15th Street,
then turning west to Shattuck Avenue South.
Measures to be implemented to minimize dust, traffic and transportation impacts, mud, noise, and
other noxious characteristics
Dust: Best management practices will be used to minimize dust on the construction site. Water trucks
or metered fire hoses will be used as needed to wet down the areas used by construction equipment.
Disturbed slopes will be hydroseeded per the Erosion/Sedimentation Control Plan to control dust.
Traffic: During road and building construction, the traffic entering and leaving the site will consist of
subcontractors and deliveries. When arriving for work, the subcontractors will be travelling opposite
the majority of traffic leaving the Talbot Neighborhood, and materials are primarily delivered at off
peak hours during the day. None of these operations are anticipated to have a significant impact on the
peak or non-peak hour traffic in the area.
Any special hours proposed for construction or hauling
There are no special hours proposed for construction or hauling without prior approval from the City of
Renton.
Preliminary Traffic Control Plan
General access to the property will be from Shattuck Avenue South. It is anticipated that the existing
roadway will remain open during construction and access to the properties along Shattuck Avenue
South will be maintained. Traffic Control is anticipated to consist of occasional single lane closures
along Shattuck Avenue South. A standard one-lane, two-way traffic control with flaggers may be used
similar to WSDOT Plan TC1.