Loading...
HomeMy WebLinkAboutPreliminary_TIR_17.02.21 Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd., Cle Elum, WA 98922 Phone: (425) 392-0250 Fax: (425) 391-3055 Phone: (509) 674-7433 Fax: (509) 674-7419 www.EncompassES.net PRELIMINARY TECHNICAL INFORMATION REPORT for the 28Hundred Unit Lot Subdivision February 20, 2017 Encompass Engineering & Surveying Job No. 16663 Prepared For: Yves Tang Greystoke LLC 720 North 10th Street #A282 Renton, WA 98057 28Hundred Preliminary Technical Information Report February 20, 2017 Page i TABLE OF CONTENTS I. PROJECT OVERVIEW ................................................................................................................. 1 II. CONDITIONS AND REQUIREMENTS SUMMARY ....................................................................... 3 III. OFF-SITE ANALYSIS ................................................................................................................... 5 IV. FLOW CONTROL, LOW IMPACT DESIGN (LID) AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ..................................................................................................................................... 8 VI. SPECIAL REPORTS AND STUDIES ............................................................................................ 20 VII. OTHER PERMITS ..................................................................................................................... 20 VIII. CSWPPP ANALYSIS AND DESIGN ............................................................................................ 20 IX. BOND QUANTITIES, FACILITY SUMMARIES, & DECLARATION OF COVENANT ...................... 20 X. OPERATIONS AND MAINTENANCE MANUAL ......................................................................... 20 28Hundred Preliminary Technical Information Report February 20, 2017 Page 1 I. PROJECT OVERVIEW Project: 28Hundred Unit Lot Subdivision Tax Parcel #: 722780-1690 & 722780-1695 Site Addresses: 2800 NE 12th St & 2801 NE 13th ST Zoning: R-14 Site Area: The project area is 0.66 Acres Site Location: The site is on the east side of Harrington Avenue NE between NE 12th Street and NE 13th Street Project Description: This project involves developing a 0.66-acre parcel into a 12-unit, Unit Lot Subdivision. Site Plan 28Hundred Preliminary Technical Information Report February 20, 2017 Page 2 Existing Adjacent Development: Existing development adjacent to the subject site includes the following: North – Single Family Residences and NE 13th Street East – Single Family Residences South – Single Family Residences & NE 12th Street West – McKnight Middle School & Harrington Avenue NE Pre-developed Site Conditions: The project site presently consists of two parcels totaling 0.66 acres with existing houses/garages with sidewalks and driveways—the remaining area is covered with sparse mature trees with lawn. The site generally slopes down from the north to south at approximately 1%. Critical Areas: No onsite critical areas. Soils: Per the SCS soil maps, the site is underlain with Arents, Alderwood, gravelly sandy loam (AmC) soil. Per Geotech report prepared for this project, “Infiltration Evaluation Proposed Harrington Glade Townhomes 2800 Northeast 12th Street Renton, Washington”, dated August 1, 2014, and prepared by Earth Solutions NW, the site is underlain with at least 8’ – 14’ of silty sand, infiltratable soil. Post-developed Site Conditions: The proposal incorporates the construction of frontage improvements along NE 13th Street together with water/sewer/storm for a 12-unit Unit Lot Subdivision. The existing single family residences will be removed. 28Hundred Preliminary Technical Information Report February 20, 2017 Page 3 Vicinity Map II. CONDITIONS AND REQUIREMENTS SUMMARY Core Requirement #1: Discharge at the Natural Location 28Hundred Preliminary Technical Information Report February 20, 2017 Page 4 The proposed on-site drainage patterns emulate those of the existing site conditions. Infiltration will provide the required flow control for the impervious surfaces. The access/parking lot will drain to a bioswale prior to infiltrating into the soil. There will be an overflow from the bioswale/infiltration into the public storm system. Core Requirement #2: Off-site Analysis See Section III. Core Requirement #3: Flow Control Flow control will be provided for the development with infiltration pipes/tanks. See Section IV for a conceptual design using KCRTS. Core Requirement #4: Conveyance System Conveyance and capacity analysis of the new proposed system will be presented with the final drainage report. Core Requirement #5: Erosion & Sediment Control An erosion and sediment control plan, which will serve to minimize soil erosion/sedimentation during the proposed site construction, will be prepared for the final engineering plans. Core Requirement #6: Maintenance & Operations The on-site storm water system will be maintained by the Unit Lot Subdivision HOA. Core Requirement #7: Financial Guarantees & Liability The owner will arrange for any financial guarantees and liabilities required by the pe rmit. Core Requirement #8: Water Quality Because there will be greater than 5,000 sq-ft of new PGIS, water quality measures will be provided with a bioswale. Core Requirement #9: Flow Control BMPs Flow control BMPs will be provided with infiltration pipes/tanks. See Section IV for a conceptual design using KCRTS. Special Requirement #1: Other Adopted Area-Specific Requirements None Special Requirement #2: Floodplain/Floodway Delineation None Special Requirement #3: Flood Protection Facilities None Special Requirement #4: Source Control Source control is not required for this project. Special Requirement #5: Oil Control Oil control is not required for a residential subdivision, it doesn’t qualify as a high-use site. 28Hundred Preliminary Technical Information Report February 20, 2017 Page 5 III. OFF-SITE ANALYSIS Location: Tax Parcel #: 722780-1690 & 722780-1695 Site Addresses: 2800 NE 12th St & 2801 NE 13th ST Site Location: The site is on the east side of Harrington Avenue NE between NE 12th Street and NE 13th Street Project Description: This project involves developing a 0.66-acre parcel into a 12-unit, Unit Lot Subdivision. The project site presently consists of two parcels totaling 0.66 acres with existing houses/garages with sidewalks and driveways—the remaining area is covered with several mature trees with lawn. The site generally slopes down from the north to south at approximately 1%. Soils: Per the SCS soil maps, the site is underlain with Arents, Alderwood, gravelly sandy loam (AmC) soil. Per Geotech report prepared for this project, “Infiltration Evaluation Proposed Harrington Glade Townhomes 2800 Northeast 12th Street Renton, Washington”, dated August 1, 2014, and prepared by Earth Solutions NW, the site is underlain with at least 8’ – 14’ of silty sand, infiltratable soil. Existing Upstream Drainage Little if any upstream areas drain to this site. Existing Downstream Drainage Any runoff from the site sheet flows southwest and enters into street gutter which drains into public storm drainage system—a CB at point (A) which is located in the intersection of NE 12th St and Harrington Ave NE. From there flow drains southwest through a 6-inch Conc. pipe into a CB type II- MH per survey field and per city of Renton (GIS) records at point (B). From point (B) flow also drains southwest through a 24-inch CMP pipe into another CB type II-MH at point (C). From there flow drains west along the NE 12th St through a 36 -inch pipe to another CB type II-MH at point (D) for a total of 120-feet downstream from the site. From point (D) flow continues west through a 36-inch pipe to another CB at point (E) per city of Renton records. Form there flow drains through a 36 -inch pipe to another CB type II-MH at point (F) for a total of approximately 470-feet down stream. From there flow drains through a 36-inch pipe to another CB type II-MH at point (G). From there flow drains through a pipe to another CB type II-MH at point (H) located on intersection of NE 12th St and Edmonds Ave NE for a total of approximately 800-feet from the site. From point (H) flow continues south along Edmonds Ave NE through an 18-inch pipe to another CB type II-MH at point (I). From there flow continues south through an 18 -inch pipe to another CB at point (J). From Point (J) flow drains through another 18-inch pipe to another CB at point (K) for a total of appro ximately 1100-feet downstream from the site. From there pipe continues south (L) to ¼ mile downstream from the site and enters into public storm drainage system along the NE Sunset Blvd. Eventually the runoff discharges into Lake Washington. There were no obvious downstream drainage problems. 28Hundred Preliminary Technical Information Report February 20, 2017 Page 6 Photo 1: Looking South from Harrington Ave NE/NE 13th St.—Subject property on the left Photo 2: Intersection of Harrington Ave NE & NE 12th St.—CB at point (A) 28Hundred Preliminary Technical Information Report February 20, 2017 Page 7 Photo 3: looking west from NE 12th St. towards intersection of Edmonds Ave NE 28Hundred Preliminary Technical Information Report February 20, 2017 Page 8 IV. FLOW CONTROL, LOW IMPACT DESIGN (LID) AND WATER QUALITY FACILITY ANALYSIS AND DESIGN Performance Standards For conceptual purposes, the site was analyzed using the KCRTS software. Because the underlying soil is silty sand and is suitable for providing for infiltration, infiltration pipes/tanks were used to provide the required flow control. For the concept, the infiltration was designed for the 100 -year rainfall conditions. During the final design, other approved drainage design software will be used as outlined in the 2016 City of Renton Surface Water Design Manual. Separate infiltration and water quality designs were made for roofs and pavement. Infiltration Design for Runoff from Roofs  Roof Area = 8,510 sq-ft = 0.20 acres.  Design Infiltration Rate = IDesign = 1.0 inch/hr => 60min/inch  Use 24” infiltration tank in 4’ wide trench  Design for 100-year storm  Using KCRTS (see below), 268LF tank required for buildings only 28Hundred Preliminary Technical Information Report February 20, 2017 Page 9 Existing Conditions Map 28Hundred Preliminary Technical Information Report February 20, 2017 Page 10 Developed Conditions Map 28Hundred Preliminary Technical Information Report February 20, 2017 Page 11 KCRTS Input File for Roof Infiltration KCRTS Program...File Directory: C:\KC_SWDM\KC_DATA\ [C] CREATE a new Time Series ST 0.00 0.00 0.000000 Till Forest 0.00 0.00 0.000000 Till Pasture 0.00 0.00 0.000000 Till Grass 0.00 0.00 0.000000 Outwash Forest 0.00 0.00 0.000000 Outwash Pasture 0.00 0.00 0.000000 Outwash Grass 0.00 0.00 0.000000 Wetland 0.20 0.00 0.000000 Impervious Bldgs.tsf T 1.00000 T [T] Enter the Analysis TOOLS Module [P] Compute PEAKS and Flow Frequencies Bldgs.tsf Bldgs.pks [R] RETURN to Previous Menu KCRTS Output File for Roof Infiltration KCRTS 1 hour Time Step Peaks for Flow Control – 0.20-acre Buildings Only Flow Frequency Analysis Time Series File:bldgs.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.048 7 2/09/01 2:00 0.095 1 100.00 0.990 100year 0.043 8 1/05/02 16:00 0.073 2 25.00 0.960 0.059 3 12/08/02 18:00 0.059 3 10.00 0.900 0.050 6 8/26/04 2:00 0.059 4 5.00 0.800 0.059 4 10/28/04 16:00 0.052 5 3.00 0.667 0.052 5 1/18/06 16:00 0.050 6 2.00 0.500 0.073 2 10/26/06 0:00 0.048 7 1.30 0.231 0.095 1 1/09/08 6:00 0.043 8 1.10 0.091 Computed Peaks 0.087 50.00 0.980 KCRTS Infiltration Design Output for Roof Infiltration KCRTS Flow Control Design for Buildings Only – 24” Infiltration Tank Retention/Detention Facility 28Hundred Preliminary Technical Information Report February 20, 2017 Page 12 Type of Facility: Infiltration Tank Tank Diameter: 2.00 ft Trench Width: 4.00 ft Tank Length: 268.00 ft Effective Storage Depth: 2.00 ft Stage 0 Elevation: 0.00 ft Storage Volume: 1233. cu. ft Vertical Permeability: 60.00 min/in Permeable Surfaces: Bottom Riser Head: 2.00 ft Riser Diameter: 8.00 inches Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) 0.00 0.00 0. 0.000 0.000 0.00 0.10 0.10 43. 0.001 0.000 0.02 0.20 0.20 95. 0.002 0.000 0.02 0.30 0.30 152. 0.003 0.000 0.02 0.40 0.40 213. 0.005 0.000 0.02 0.50 0.50 276. 0.006 0.000 0.02 0.60 0.60 342. 0.008 0.000 0.02 0.70 0.70 409. 0.009 0.000 0.02 0.80 0.80 477. 0.011 0.000 0.02 0.90 0.90 547. 0.013 0.000 0.02 1.00 1.00 616. 0.014 0.000 0.02 1.10 1.10 686. 0.016 0.000 0.02 1.20 1.20 755. 0.017 0.000 0.02 1.30 1.30 824. 0.019 0.000 0.02 1.40 1.40 891. 0.020 0.000 0.02 1.50 1.50 957. 0.022 0.000 0.02 1.60 1.60 1020. 0.023 0.000 0.02 1.70 1.70 1081. 0.025 0.000 0.02 1.80 1.80 1138. 0.026 0.000 0.02 1.90 1.90 1189. 0.027 0.000 0.02 2.00 2.00 1233. 0.028 0.000 0.02 2.10 2.10 1233. 0.028 0.205 0.02 2.20 2.20 1233. 0.028 0.581 0.02 2.30 2.30 1233. 0.028 0.921 0.02 2.40 2.40 1233. 0.028 1.060 0.02 2.50 2.50 1233. 0.028 1.190 0.02 2.60 2.60 1233. 0.028 1.300 0.02 2.70 2.70 1233. 0.028 1.410 0.02 2.80 2.80 1233. 0.028 1.500 0.02 2.90 2.90 1233. 0.028 1.590 0.02 3.00 3.00 1233. 0.028 1.680 0.02 3.10 3.10 1233. 0.028 1.760 0.02 3.20 3.20 1233. 0.028 1.840 0.02 3.30 3.30 1233. 0.028 1.920 0.02 3.40 3.40 1233. 0.028 1.990 0.02 28Hundred Preliminary Technical Information Report February 20, 2017 Page 13 3.50 3.50 1233. 0.028 2.060 0.02 3.60 3.60 1233. 0.028 2.130 0.02 3.70 3.70 1233. 0.028 2.190 0.02 3.80 3.80 1233. 0.028 2.260 0.02 3.90 3.90 1233. 0.028 2.320 0.02 4.00 4.00 1233. 0.028 2.380 0.02 Hyd Inflow Outflow Peak Storage Target Calc Stage Elev (Cu-Ft) (Ac-Ft) 1 0.09 0.00 0.00 1.95 1.95 1212. 0.028 2 0.05 0.00 0.00 1.03 1.03 641. 0.015 3 0.05 0.00 0.00 0.84 0.84 506. 0.012 4 0.06 0.00 0.00 0.75 0.75 441. 0.010 5 0.05 0.00 0.00 0.73 0.73 431. 0.010 6 0.06 0.00 0.00 0.61 0.61 349. 0.008 7 0.05 0.00 0.00 0.27 0.27 133. 0.003 8 0.04 ******* 0.00 0.22 0.22 109. 0.002 100-year stage is 0.05’ below top of 24” infiltration pipe => No Overflow in 100yr storm ---------------------------------- Route Time Series through Facility Inflow Time Series File:bldgs.tsf Outflow Time Series File:rdout Inflow/Outflow Analysis Peak Inflow Discharge: 0.095 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.000 CFS at 11:00 on Jan 9 in Year 8 Peak Reservoir Stage: 1.95 Ft Peak Reservoir Elev: 1.95 Ft Peak Reservoir Storage: 1212. Cu-Ft : 0.028 Ac-Ft Flow Frequency Analysis Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) (ft) Period 0.000 5 2/09/01 19:00 0.000 1.95 1 100.00 0.990 0.000 8 1/05/02 17:00 0.000 1.03 2 25.00 0.960 0.000 4 2/27/03 10:00 0.000 0.84 3 10.00 0.900 0.000 7 8/26/04 3:00 0.000 0.75 4 5.00 0.800 0.000 6 10/28/04 19:00 0.000 0.73 5 3.00 0.667 0.000 2 1/18/06 22:00 0.000 0.61 6 2.00 0.500 0.000 3 11/24/06 6:00 0.000 0.27 7 1.30 0.231 0.000 1 1/09/08 11:00 0.000 0.22 8 1.10 0.091 Computed Peaks 0.000 1.65 50.00 0.980 28Hundred Preliminary Technical Information Report February 20, 2017 Page 14 Infiltration Design for Runoff from Paving  Paving Area = 7,200 sq-ft = 0.17 acres.  Design Infiltration Rate = IDesign = 1.0 inch/hr => 60min/inch  Use 3.75’ wide by 6.42’ wide infiltration chamber in 8.42’ wide trench  Design for 100-year storm  Using KCRTS (see below), 56LF tank required for paving only KCRTS Input File for Paving Infiltration KCRTS Program...File Directory: C:\KC_SWDM\KC_DATA\ [C] CREATE a new Time Series ST 0.00 0.00 0.000000 Till Forest 0.00 0.00 0.000000 Till Pasture 0.00 0.00 0.000000 Till Grass 0.00 0.00 0.000000 Outwash Forest 0.00 0.00 0.000000 Outwash Pasture 0.00 0.00 0.000000 Outwash Grass 0.00 0.00 0.000000 Wetland 0.17 0.00 0.000000 Impervious P-Lot.tsf T 1.00000 T [T] Enter the Analysis TOOLS Module [P] Compute PEAKS and Flow Frequencies P-Lot.tsf P-Lot.pks [R] RETURN to Previous Menu KCRTS Output for Paving Infiltration KCRTS 1 hour Time Step Peaks for Flow Control – 0.17-acre Parking Lot Only Flow Frequency Analysis Time Series File:p-lot.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.041 7 2/09/01 2:00 0.080 1 100.00 0.990 100yr 0.036 8 1/05/02 16:00 0.061 2 25.00 0.960 0.050 3 12/08/02 18:00 0.050 3 10.00 0.900 0.043 6 8/26/04 2:00 0.050 4 5.00 0.800 0.050 4 10/28/04 16:00 0.044 5 3.00 0.667 0.044 5 1/18/06 16:00 0.043 6 2.00 0.500 28Hundred Preliminary Technical Information Report February 20, 2017 Page 15 0.061 2 10/26/06 0:00 0.041 7 1.30 0.231 0.080 1 1/09/08 6:00 0.036 8 1.10 0.091 Computed Peaks 0.074 50.00 0.980 KCRTS Infiltration Design Output for Paving Infiltration KCRTS Flow Control Design for Parking Lot Only – 3.75”X6.42” Infiltration Chamber Retention/Detention Facility Type of Facility: Infiltration Arch Tank Tank Rise: 3.75 ft Tank Span: 6.42 ft Trench Width: 8.42 ft Tank Length: 56.00 ft Effective Storage Depth: 4.25 ft Stage 0 Elevation: 0.00 ft Storage Volume: 1345. cu. ft Vertical Permeability: 60.00 min/in Permeable Surfaces: Bottom Riser Head: 4.25 ft Riser Diameter: 8.00 inches Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) 0.00 0.00 0. 0.000 0.000 0.00 0.10 0.10 31. 0.001 0.000 0.01 0.20 0.20 61. 0.001 0.000 0.01 0.30 0.30 92. 0.002 0.000 0.01 0.40 0.40 123. 0.003 0.000 0.01 0.50 0.50 159. 0.004 0.000 0.01 0.60 0.60 197. 0.005 0.000 0.01 0.70 0.70 197. 0.005 0.000 0.01 0.80 0.80 274. 0.006 0.000 0.01 0.90 0.90 313. 0.007 0.000 0.01 1.00 1.00 353. 0.008 0.000 0.01 1.10 1.10 392. 0.009 0.000 0.01 1.20 1.20 431. 0.010 0.000 0.01 1.30 1.30 471. 0.011 0.000 0.01 1.40 1.40 509. 0.012 0.000 0.01 1.50 1.50 548. 0.013 0.000 0.01 1.60 1.60 587. 0.013 0.000 0.01 1.70 1.70 625. 0.014 0.000 0.01 1.80 1.80 662. 0.015 0.000 0.01 1.90 1.90 700. 0.016 0.000 0.01 2.00 2.00 738. 0.017 0.000 0.01 2.10 2.10 775. 0.018 0.000 0.01 2.20 2.20 811. 0.019 0.000 0.01 2.30 2.30 847. 0.019 0.000 0.01 2.40 2.40 883. 0.020 0.000 0.01 28Hundred Preliminary Technical Information Report February 20, 2017 Page 16 2.50 2.50 917. 0.021 0.000 0.01 2.60 2.60 963. 0.022 0.000 0.01 2.70 2.70 986. 0.023 0.000 0.01 2.80 2.80 1019. 0.023 0.000 0.01 2.90 2.90 1051. 0.024 0.000 0.01 3.00 3.00 1082. 0.025 0.000 0.01 3.10 3.10 1112. 0.026 0.000 0.01 3.20 3.20 1142. 0.026 0.000 0.01 3.30 3.30 1170. 0.027 0.000 0.01 3.40 3.40 1197. 0.027 0.000 0.01 3.50 3.50 1222. 0.028 0.000 0.01 3.60 3.60 1245. 0.029 0.000 0.01 3.70 3.70 1266. 0.029 0.000 0.01 3.80 3.80 1281. 0.029 0.000 0.01 3.90 3.90 1295. 0.030 0.000 0.01 4.00 4.00 1310. 0.030 0.000 0.01 4.10 4.10 1324. 0.030 0.000 0.01 4.20 4.20 1338. 0.031 0.000 0.01 4.25 4.25 1345. 0.031 0.000 0.01 4.35 4.35 1345. 0.031 0.205 0.01 4.45 4.45 1345. 0.031 0.581 0.01 4.55 4.55 1345. 0.031 0.921 0.01 4.65 4.65 1345. 0.031 1.060 0.01 4.75 4.75 1345. 0.031 1.190 0.01 4.85 4.85 1345. 0.031 1.300 0.01 4.95 4.95 1345. 0.031 1.410 0.01 5.05 5.05 1345. 0.031 1.500 0.01 5.15 5.15 1345. 0.031 1.590 0.01 5.25 5.25 1345. 0.031 1.680 0.01 5.35 5.35 1345. 0.031 1.760 0.01 5.45 5.45 1345. 0.031 1.840 0.01 5.55 5.55 1345. 0.031 1.920 0.01 5.65 5.65 1345. 0.031 1.990 0.01 5.75 5.75 1345. 0.031 2.060 0.01 5.85 5.85 1345. 0.031 2.130 0.01 5.95 5.95 1345. 0.031 2.190 0.01 6.05 6.05 1345. 0.031 2.260 0.01 6.15 6.15 1345. 0.031 2.320 0.01 6.25 6.25 1345. 0.031 2.380 0.01 Hyd Inflow Outflow Peak Storage Target Calc Stage Elev (Cu-Ft) (Ac-Ft) 1 0.08 0.00 0.00 4.25 4.25 1345. 0.031 2 0.04 0.00 0.00 3.52 3.52 1226. 0.028 3 0.06 0.00 0.00 3.39 3.39 1194. 0.027 4 0.04 0.00 0.00 2.92 2.92 1056. 0.024 5 0.05 0.00 0.00 2.15 2.15 794. 0.018 6 0.05 0.00 0.00 1.39 1.39 504. 0.012 7 0.04 0.00 0.00 0.91 0.91 318. 0.007 8 0.04 0.00 0.00 0.79 0.79 268. 0.006 100-year stage is at top of 3.75”X6.42” Infiltration Chamber (3.75” Chamber + 0.5’ under-gravel = 4.25’) => No Overflow in 100yr storm ---------------------------------- 28Hundred Preliminary Technical Information Report February 20, 2017 Page 17 Route Time Series through Facility Inflow Time Series File:p-lot.tsf Outflow Time Series File:rdout Inflow/Outflow Analysis Peak Inflow Discharge: 0.080 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.005 CFS at 12:00 on Jan 9 in Year 8 Peak Reservoir Stage: 4.25 Ft Peak Reservoir Elev: 4.25 Ft Peak Reservoir Storage: 1345. Cu-Ft : 0.031 Ac-Ft Flow Frequency Analysis Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) (ft) Period 0.000 2 2/09/01 20:00 0.005 4.25 1 100.00 0.990 0.000 8 1/05/02 18:00 0.000 3.52 2 25.00 0.960 0.000 5 3/06/03 21:00 0.000 3.39 3 10.00 0.900 0.000 7 8/24/04 0:00 0.000 2.92 4 5.00 0.800 0.000 6 10/28/04 20:00 0.000 2.15 5 3.00 0.667 0.000 4 1/18/06 22:00 0.000 1.39 6 2.00 0.500 0.000 3 11/24/06 7:00 0.000 0.91 7 1.30 0.231 0.005 1 1/09/08 12:00 0.000 0.79 8 1.10 0.091 Computed Peaks 0.003 4.25 50.00 0.980 Flow Duration from Time Series File:rdout.tsf Cutoff Count Frequency CDF Exceedence_Probability CFS % % % 0.000 61320 100.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 99999.99 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 99999.99 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 8264.31 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 28Hundred Preliminary Technical Information Report February 20, 2017 Page 18 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 99999.99 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 8264.31 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 99999.99 0 0.000 100.000 0.000 0.000E+00 0.000 0 0.000 100.000 0.000 0.000E+00 99999.99 0 0.000 100.000 0.000 0.000E+00 Discharge Volume Discharge Volume from Time Series rdout.tsf between 10/01/00 00:00 and 10/30/00 23:59 0. Cu-Ft or 0.000 Ac-Ft in 30.0 days Water Quality System For conceptual purposes, the method in the 2009 KCSWDM will be used for bioswale design, using KCRTS During the final design, other approved drainage design software will be used as outlined in the 2016 City of Renton Surface Water Design Manual. Paving Area = 7,200 sq-ft = 0.17 acres, greater than 5,000 sq-ft of PGIS => Water Quality Control Required Water Quality design storm = QWQ = 60% of KCRTS 15 minute timestep—see below, Q15min = 0.081cfs Bioswale Design 1. Design Flow: QWQ = 60% * 0.081cfs = 0.049cfs 2. Swale Bottom Width: b = (QWQ*nWQ)/(1.49*y1.67*s0.5) with nWQ = 0.20, y=0.17’ & s=0.005 =>b=1.79’ Use min. b=2.0’ With b=2.0’ =>y=0.16’ flow depth 3. Flow Velocity: VWQ = QWQ/AWQ , AWQ =0.16(2+0.16*3)=0.80ft2 => VWQ =0.61ft/sec 4. Swale Length: Required Length = 540* VWQ = 32.9’ => use 50’ length bioswale KCRTS Output for Paving Infiltration KCRTS 15 min. Time Step Peaks for Water Quality – 0.17-acre Parking Lot Only 28Hundred Preliminary Technical Information Report February 20, 2017 Page 19 Flow Frequency Analysis Time Series File:wq.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.081 6 8/27/01 18:00 0.200 1 100.00 0.990 0.056 8 9/17/02 17:45 0.153 2 25.00 0.960 0.153 2 12/08/02 17:15 0.110 3 10.00 0.900 0.065 7 8/23/04 14:30 0.091 4 5.00 0.800 0.086 5 10/28/04 16:00 0.086 5 3.00 0.667 0.091 4 10/27/05 10:45 0.081 6 2.00 0.500 2- year 0.110 3 10/25/06 22:45 0.065 7 1.30 0.231 0.200 1 1/09/08 6:30 0.056 8 1.10 0.091 Computed Peaks 0.185 50.00 0.980 Water Quality Flow = 60% Q2 = 0.6*.081 = 0.049 cfs 28Hundred Preliminary Technical Information Report February 20, 2017 Page 20 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN Conveyance calculations will be provided as part of the final engineering documents. VI. SPECIAL REPORTS AND STUDIES “Infiltration Evaluation Proposed Harrington Glade Townhomes 2800 Northeast 12th Street Renton, Washington”, dated August 1, 2014, and prepared by Earth Solutions NW. See Appendix A. VII. OTHER PERMITS N/A VIII. CSWPPP ANALYSIS AND DESIGN This Stormwater Pollution Prevention Plan (SWPPP)/TESC will be prepared as part permit requirements for this project in City of SeaTac, Washington during final engineering. IX. BOND QUANTITIES, FACILITY SUMMARIES, & DECLARATION OF COVENANT The documents will be prepared and submitted as part of the final engineering documents. X. OPERATIONS AND MAINTENANCE MANUAL Operation and maintenance of the site and all proposed stormwater facilities on this project will be required after the construction completion and throughout the life of this development. Details will be provided during final engineering. 28Hundred Preliminary Technical Information Report February 20, 2017 Page 21 Appendix A Infiltration Evaluation Proposed Harrington Glade Townhomes 2800 Northeast 12th Street Renton, Washington