HomeMy WebLinkAboutERC_Report_Exhibits_Cherie_Lane_180423DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
ERC Report_Cherie Lane_180419
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DATE: April 23, 2018
PART ONE: PROJECT BACKGROUND
Project Name: Cherie Lane Short Plat
Project Number: PR17-000016
Land Use Permit Number: LUA16-000964, ECF, SHPL-A
Project Manager: Jill Ding, Senior Planner
Owner/Applicant: Newfourth, LLC, 19244 39th Ave S, SeaTac, WA 98188
Contact: Tom Redding, Encompass Engineering & Surveying, 165 NE
Juniper St, Suite 201, Issaquah, WA 98027
Project Location: 34XX Talbot Road S (Parcel No. 3023059108)
Project Summary: The applicant is requesting Administrative Short Plat approval,
Environmental (SEPA) Review, and Modification approval for the
subdivision of an existing 114,798 square foot (2.64 acre) vacant lot
zoned R-8 into 2 lots and 1 tract for the construction of new single
family residences. Proposed Lot 1 would have an area of 10,665 square
feet, Lot 2 would have an area of 40,190 square feet and Tract A, a
Native Growth Protection Area, would have an area of 63,951 square
feet. Access to Lot 1 would be provided via driveway access off of S 34th
Place and access to Lot 2 would be provided via driveway access off of
Talbot Road S. High and moderate coal mine hazard areas, a 30,445
square foot Category 4 wetland with a standard 50-foot buffer, and
sensitive slopes have been identified on the project site.
Exist. Bldg. Area SF: N/A Proposed New Bldg. Area: N/A
Site Area: 114,806 SF (2.64 ac)
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review
Committee issue a Determination of Non-Significance
(DNS).
City of Renton Department of Community & Economic Development Environmental Review Committee Report
CHERIE LANE SHORT PLAT LUA16-000964, ECF, SHPL-A
Report of April 23, 2018 Page 2 of 4
ERC Report_Cherie Lane_180419
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those
project impacts that are not adequately addressed under existing development standards and
environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a DNS with a 14-day Appeal Period.
B. Mitigation Measures
1. None recommended.
C. Exhibits
Exhibit 1 Environmental Review Committee Report
Exhibit 2 Preliminary Shot Plat Map
Exhibit 3 Wetland Delineation Report, prepared by Altman Oliver Associates, LLC, dated
November 30, 2016
Exhibit 4 Otak Memo dated May 12, 2017
Exhibit 5 Revised Wetland Delineation and Classification report, prepared by Altman
Oliver Associates, LLC, dated December 14, 2017
Exhibit 6 Advisory Notes to Applicant
Exhibit 7 Coal Mine Hazard Assessment, prepared by Icicle Creek Engineers, Inc., dated
December 27, 2016
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine
whether the applicant has adequately identified and addressed environmental impacts anticipated to
occur in conjunction with the proposed development. Staff reviewers have identified that the proposal
is likely to have the following probable impacts:
1. Earth:
Impacts: Coal mine hazard areas are mapped on the project site. The applicant submitted a Coal
Mine Hazard Assessment, prepared by Icicle Creek Engineers, Inc., dated December 27, 2016
(Exhibit 7) that evaluated and rated the onsite coal mine hazard areas and provided
recommendations for development on and around the coal mine hazard areas. The report
identified four abandoned underground coal mines underneath the project site. All the mines were
developed by opening a “slope” down the coal seam that served as the main haulageway for coal
to the surface. From the main haulageway, “chutes” (or tunnels) were driven up the coal seam
toward the ground surface. These chutes were then connected by a series of “cross-cuts” (tunnels
that connect the chutes). This type of mining is referred to as “room-and-pillar” mining. Upon
retreat from the mine, the support pillars of coal between the chutes and cross-cuts were removed
(called “pillar-robbing”) to maximize the removal of coal from the mine. The effect of pillar-robbing
City of Renton Department of Community & Economic Development Environmental Review Committee Report
CHERIE LANE SHORT PLAT LUA16-000964, ECF, SHPL-A
Report of April 23, 2018 Page 3 of 4
ERC Report_Cherie Lane_180419
was to dramatically destabilize the mined-out area, therefore, natural collapse (“room caving”) of
the mine usually occurred within a few weeks or years.
Subsurface conditions of the project site were explored by drilling 19, three-inch diameter borings
(B-1 through B-19) to depths ranging from 35 to 95 feet below ground surface. Three high coal
mine hazard areas have been identified within proposed Lot 2. No development is recommended
over these high coal mine hazard areas, unless the area is “bridged” (structurally spanned) or
additional subsurface exploration is completed in order to develop alternative mitigation, as the
risk of sink hole occurrence in these areas is high.
Moderate coal mine hazard areas have been identified on the central portion of proposed Lot 2
traversing the site from northwest to southeast. In these areas, the risk of sinkhole occurrence is
low to moderate. Roads, driveways, outbuildings (sheds), yard and passive use should be allowed
in the moderate coal mine hazard areas.
Low coal mine hazard areas have been identified on the southwest corner of proposed Lot 2. The
development of structures, with mitigation, may be allowed in the low coal mine hazard areas.
Recommended mitigation for development in low coal mine hazard areas includes: Small, square or
nearly square-shaped building pads should be favored over large, irregularly-shaped building pads;
use of rigid foundations (conventional reinforced-concrete spread footings) supporting a flexible
superstructure (wood-frame), foundations should extend across the inside of the building footprint
rather than using individual column footings; crawl-space construction rather than slab-on-grade
(slab-on-grade may be used in garage areas); no brick or basement construction; underground
utilities should be designed with flexible and/or telescopic couplings or fittings; ICE should be
contacted immediately should house distortion or a ground surface sag/sinkhole be observed; and
prospective owners that may occupy structures within Lower Risk High Coal Mine Hazard areas
should be made aware that an abandoned underground coal mine exists at a depth of 50+ feet
although subsurface exploration suggests that the abandoned mine working have filled with coal
and rock fragments or have otherwise collapsed.
Staff will be recommending that compliance with the geotechnical report be a condition of
preliminary short plat approval. It is anticipated that compliance with the City’s critical areas
regulations and building codes will adequately mitigation for impacts to the construction of
structures on this site; therefore no further mitigation is recommended at this time.
Mitigation Measure: None recommended.
Nexus: Not Applicable.
2. Water
a. Wetland
Impacts: The applicant submitted a Wetland Delineation Report, prepared by Altman Oliver
Associates, LLC, dated November 30, 2016 (Exhibit 3) with the project application. The submitted
wetland report identified one onsite wetland (Wetland A) and one off-site wetland to the southeast
of the project site (Wetland B). The wetland report concluded that Wetlands A and B met the
criteria for Category IV wetlands requiring a standard 50-foot buffer. Secondary review of the
submitted wetland report was conducted by Otak in a memo dated May 12, 2017 (Exhibit 4). The
City of Renton Department of Community & Economic Development Environmental Review Committee Report
CHERIE LANE SHORT PLAT LUA16-000964, ECF, SHPL-A
Report of April 23, 2018 Page 4 of 4
ERC Report_Cherie Lane_180419
Otak memo identified an off-site wetland to the north, which likely had a buffer that overlapped
with the buffer of Wetland A and also identified a seep along the north project boundary that
drained into the ditch along Talbot Road S. The report also concluded that Wetlands A and B should
be rated as Category III wetlands with 75-foot buffers. Based on the results of the secondary
review, the applicant requested an onsite meeting with Otak and the City, the meeting was held on
July 10, 2017, as a result of the onsite meeting Otak changed one of their recommendations
regarding the classification of Wetland A and concurred with the applicant that Wetland A should
be categorized as a Category IV wetland with a 50-foot standard buffer. As a result of the meeting,
the applicant submitted a revised Wetland Delineation and Classification report, prepared by
Altman Oliver Associates, LLC, dated December 14, 2017 (Exhibit 5). The revised report identified
an off-site wetland to the northeast and concluded that this wetland met the criteria for a Category
IV wetland with a standard 50-foot buffer, Wetland A remained categorized as a Category IV
wetland with a standard 50-foot buffer, the categorization of Wetland B was revised to a Category
III wetland with a standard 75-foot buffer, and the onsite seep along the north property boundary
was determined to be an artificial surface water drainage that would not be regulated as a critical
area by the City. The project proposal is not proposing any impacts to the on or offsite wetlands or
buffer areas. Any impacts to the wetland or buffer areas would be adequately mitigated by the
City’s adopted Critical Areas Regulations; therefore no further mitigation is recommended.
Mitigation Measure: None recommended.
Nexus: Not Applicable.
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
Copies of all Review Comments are contained in the Official File and may be attached to this
report.
The Environmental Determination decision will become final if the decision is not appealed within the
14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be
filed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady
Way, Renton, WA 98057, on or before 5:00 p.m. on May 11, 2018. RMC 4-8-110 governs appeals to the
Hearing Examiner and additional information regarding the appeal process may be obtained from the City
Clerk’s Office, Renton City Hall – 7th Floor, (425) 430-6510.
November 30, 2016
AOA-1773
Steve Beck
Newfourth LLC
19244 39th Ave. S.
SeaTac, WA 98188-5316
SUBJECT: Wetland Delineation for Cherie Lane
Parcel 302305-9108, Renton, WA
Dear Steve:
On January 20, 2016 I conducted a wetland delineation on the western portion of the
undeveloped subject property utilizing the methodology outlined in the May 2010
Regional Supplement to the Corps of Engineers Wetland Delineation Manual:
Western Mountains, Valleys, and Coast Region (Version 2.0). Additional field
investigations were conducted on September 14 and November 1, 2016.
1.0 EXISTING WETLANDS
One wetland (Wetland A) was identified as a mosaic throughout the central portion
of the property. The wetland boundary was subsequently surveyed and is depicted
on Figure 1. A second wetland (Wetland B) is located off-site to the southeast. The
approximate location of this wetland was taken from a map prepared by the Jay
Group in 2010 (Attachment A) and the approximate location confirmed during the
November 1, 2016 field review.
1.1 Wetland A Mosaic
Vegetation within the wetland mosaic includes hydrophytic trees such as black
cottonwood (Populus trichocarpa), Pacific willow (Salix lasiandra), and Oregon ash
(Fraxinus latifolia). Understory vegetation was dominated by a mix of hydrophytic
and mesic species including dense Himalayan blackberry (Rubus armeniacus),
snowberry (Symphoricarpos albus), black twinberry (Lonicera involucrata), and
sword fern (Polystichum munitum).
Soils throughout the wetland generally consisted of a low chroma clay loam mixed
with charcoal. Soil profiles were highly variable and have likely been disturbed by
historic mining activities. Hydrology within the wetland consists of a seasonal high
Technical Memorandum
11241Willows Road NE
Suite 200
Redmond, WA 98052
Phone (425) 822-4446
Fax (425) 827-9577
Otak, Inc. (Otak) conducted a review of the wetland delineation report and mitigation plan dated
November 30, 2016 and prepared by Altmann Oliver Associates (AOA), LLC, for the proposed
preliminary short plat of Parcel #3023059108 in the City of Renton (City). The project applicant is
proposing a 5-lot short plat with access from a new road (Cherie Lane), and proposed wetland and
wetland buffer enhancement for impacts to wetland buffers.
The City requested Otak to complete a secondary review of the delineation report and mitigation
plan per Renton Municipal Code (RMC) Chapter 4-3-050 (Critical Areas Regulations), and conduct a
site visit to verify the wetland delineation and classifications. Following the review of the submitted
materials, a site visit was completed on April 27, 2017.
The following materials were submitted by the project proponent and reviewed by Otak:
Wetland Delineation for Cherie Lane, prepared by Altmann Oliver Associates, LLC (dated
November 30, 2016)
Preliminary Cherie Lane Site Plan, prepared by Encompass Engineering & Surveying (dated
December 21, 2016)
The following resources were also reviewed:
Critical Areas Report for Parcel 3023059022, prepared by Sewall Wetland Consulting, Inc.
(dated October 20, 2016).
King County iMap (http://gismaps.kingcounty.gov/iMap/), accessed May 1, 2017.
To: Jill Ding, Senior Planner
Community and Economic Development
City of Renton
From: Jeff Gray, Senior Wetland Biologist
Stephanie Modjeski, Wetland Biologist
Copies: File
Date: May 12, 2017
Subject: Wetland Delineation and Classification Review
Proposed Preliminary Short Plat of
Parcel: #3023059108
Project No.: 32847
Jill Ding, Senior Planner, City of Renton Page 2
Cherie Lane– Wetland Delineation and Classification Review May 12, 2017
2
Google Earth Pro, accessed May 1, 2017.
King County Public Health sewage plans search system
(http://www.kingcounty.gov/depts/health/environmental-health/piping/onsite-sewage-
systems/records/as-built-drawings.aspx), accessed May 1, 2017.
Wetland Boundary Delineation, Wetland Classifications, and Buffer
Widths Review
The wetland boundary delineation onsite is consistent with the 1987 Corps Wetland Delineation
Manual and the 2010 Western Mountains, Valleys, and Coast Regional Supplement as required by
RMC 4-3-050(G)9-b, but it does not appear adequate for the proposed short plat as not all wetland
boundaries were delineated on site.
It is unclear if offsite flags AA1 to AA3 are intended to delineate a separate wetland, or if these flags
represent a continuation of the boundaries of Wetland A. Flag AA3 is approximately 100 feet away
from flag A5, which is the last flag hung for Wetland A. Flags AA1 to AA3 delineate the
northwestern edge of a groundwater seep emanating from the coal mine hazard area, and appeared
to be a separate wetland. If Wetland flags AA1 to AA3 are intended to delineate a separate wetland,
then that wetland also needs to be rated and classified, and the rating form included with the report.
If Wetland flags AA1 to AA3 are a continuation of Wetland A, then the applicant needs to delineate
the connection in the field as it may affect the proposed buffer averaging plan. The applicant should
provide additional wetland data forms to substantiate any revisions to wetland boundaries.
Surface water was observed emanating from a seep along the northern property boundary and
flowing into the roadside ditch along Talbot Road South (see Figure 1). Wetland vegetation was also
present. The applicant should document the presence or absence of wetlands at this location, and
provide wetland data forms.
The offsite wetland on Parcel #3023059022 north of the proposed short plat likely has a 40 to 50-
foot buffer depending on the proposed land use intensity. The buffer from this offsite wetland
overlaps with the existing Wetland A buffer onsite.
The northern boundary of offsite Wetland B portrayed on Figure 1 of the AOA report appears
generally accurate. No flags were observed in the field from the delineation by the Jay Group in
2010. But it is reasonable to suspect that the boundary flagged in 2010 and shown on Figure 1 has
not changed due to the abrupt topographic break and distinct wetland/upland boundary observed in
the field.
Jill Ding, Senior Planner, City of Renton Page 3
Cherie Lane– Wetland Delineation and Classification Review May 12, 2017
3
Figure 1. Groundwater seep area with wetland vegetation shown in the blue circle.
On- and off-site wetlands have been rated using the Washington State Wetland Rating System for
Western Washington (2014 Update) as required by RMC 4-3-050(G)9-c. Wetland A and Wetland B
are rated as Category IV wetlands in the report by AOA, but it is our opinion that these wetlands
should be rated as Category III with a 75-foot buffer. The comments listed below pertain to the
questions in the rating form.
Wetland A
D1.1: No intermittently flowing stream or highly constricted permanently flowing outlet was
observed. Wetland A appeared to be a depression with no surface water outlet. Question
D1.1 should be 3 points unless the seep at flags AA-1 to AA-3 is found to be part of the
Wetland. However, the adjustment of the score from 2 to 3 points for this question does not
change the rating for this function.
D2.3: Septic systems occur on parcel number 3023059071 within 250 feet of Wetland A.
Although Question D2.3 should be revised from 0 to 1 point, the rating remains the same.
D4.1: No intermittently flowing stream or highly constricted permanently flowing outlet was
observed in the field or described in the AOA report. Wetland A appeared to be a
depression or flat depression with no surface water outlet. Question D4.1 should be revised
to 4 points. The adjustment of the score from 2 to 4 points changes the rating from low to
medium, and gives the wetland a score of 5 for overall hydrologic functions.
Jill Ding, Senior Planner, City of Renton Page 4
Cherie Lane– Wetland Delineation and Classification Review May 12, 2017
4
H3.1: Snags and downed logs that meet the definition of WDFW listed priority habitats
were observed within 100 meters of Wetland A. Question H3.1 should be 1 point. An
increase from 0 to 1 point changes the rating from low to medium, and gives the wetland a
rating of 4 for overall habitat functions.
Adjustments to hydrologic and habitat ratings changes the overall score of Wetland A to 16,
resulting in Wetland A being classified as Category III. Category III wetlands with a habitat
score of 4 require a buffer of 75 feet with a 15-foot structure setback for other than low impact
land uses per RMC 4-3-050(G)2. The wetland rating forms and buffers should be revised
accordingly.
Wetland B
H3.1: Snags and downed logs that meet the definition of WDFW listed priority habitats
were observed within 100 meters of Wetland B. Question H3.1 should be 1 point. An
increase from 0 to 1 point changes the rating from low to medium, and gives the wetland a
rating of 4 for overall habitat functions.
Adjustments to the habitat rating changes the overall score of Wetland B to 17, resulting in
Wetland B being classified as Category III. Category III wetlands with a habitat score of 4 for all
land use require a buffer of 75 feet with a 15-foot structure setback for other than low impact
land uses per RMC 4-3-050(G)2. The wetland rating forms and buffers should be revised
accordingly.
Additional figures are needed for both wetland rating forms. The following figures should be
submitted with the revised wetland rating forms.
Map of hydroperiods and location of outlet(s) with 150’ buffer shown
Map of contributing basin
Screen capture of TMDLS for WRIA in which unit is found
Wetland and Wetland Buffer Enhancement Plan Review
The proposed wetland and wetland buffer enhancement plan is based on 50-foot wetland buffers. It
is our professional evaluation that Wetlands A and B should be revised to Category III wetlands
with 75-foot buffers. Changes to the buffer widths affect the buffer impact, averaging, and
enhancement area totals provided in the plan.
Per RMC 4-3-050(I)1, wetland buffer widths shall be reduced by no more than 25% of the required
buffer. A 75-foot buffer cannot be reduced to less than 56.25 feet. Further reductions require review
as a variance pursuant to RMC 4-9-250. Information needs to be provided by the applicant to
demonstrate how the reduced buffer around Wetland A will function at a higher level than the
Jill Ding, Senior Planner, City of Renton Page 5
Cherie Lane– Wetland Delineation and Classification Review May 12, 2017
5
standard buffer, and how the general mitigation process has been followed as required by RMC 4-3-
050(H)2.
The proposed buffer impacts do not appear to meet the criteria listed at RMC 4-3-050(I)3a/b for
reduction of buffer width with enhancement or buffer averaging. The applicant proposes to enhance
19,682 SF of wetland and buffer areas, and add 4,997 SF of additional buffer to Wetland A, to
compensate for impacts to 9,727 SF of buffer. The RMC does not allow for enhancing wetlands to
offset wetland buffer impacts. The proposed mitigation plan does not appear meet the individual
requirements for either buffer reduction with enhancement or buffer averaging. In addition, the
existing buffer areas proposed for enhancement are already forested, and it is not evident that the
proposed enhancement plan would increase buffer functioning to achieve a no-net-loss of function
as required per RMC 4-3-050(J)4a.
Please feel free to contact me if you have any questions or concerns.
Sincerely,
Jeff Gray | Otak, Inc.
c: 609.532.4620
jeff.gray@otak.com
December 14, 2017
AOA-1773
Steve Beck
Newfourth LLC
19244 39th Ave. S.
SeaTac, WA 98188-5316
SUBJECT: Wetland Delineation and Classification for Cherie Lane (Revised)
Parcel 302305-9108, Renton, WA
Dear Steve:
We have updated this critical areas report to incorporate the results of a site review
meeting that was conducted on July 10, 2017 with Jill Ding, Senior Planner with the
City of Renton and Jeff Gray, Senior Wetland Scientist with Otak, the City’s peer
review consultant.
Background
On January 20, 2016 I conducted a wetland delineation on the undeveloped subject
property utilizing the methodology outlined in the May 2010 Regional Supplement to
the Corps of Engineers Wetland Delineation Manual: Western Mountains, Valleys,
and Coast Region (Version 2.0). Additional field investigations were conducted on
September 14 and November 1, 2016. Wetland Flags AA-4 through AA-8 were
added during the July 10, 2017 site review meeting. These flags are intended to
show the connection between Wetland Areas A and AA.
1.0 EXISTING WETLANDS
One wetland (Wetland A) was identified as a mosaic throughout the central portion
of the property. The wetland boundary (including the newer AA flags) was surveyed
by Encompass Engineering & Surveying. A second wetland (Wetland B) is located
off-site to the southeast. The approximate location of this wetland was taken from a
map prepared by the Jay Group in 2010 (Attachment A) and the approximate
location confirmed during the November 1, 2016 field review.
It is my understanding that a third wetland has been identified by Sewall Wetland
Consulting, Inc. off-site to the northeast. This wetland has also been added to the
Encompass plans.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 2 LUA16-000964
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for
the land use action.
Planning:
(Contact: Jill Ding, 425-430-6598, jding@rentonwa.gov)
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless
otherwise approved by the Development Services Division.
2. Commercial, multi-family, new single family and other nonresidential construction activities shall be
restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through
Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight
o’clock (8:00) p.m. No work shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an
appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where
no further construction work will occur within ninety (90) days. Alternative measures such as mulch,
sodding, or plastic covering as specified in the current King County Surface Water Management Design
Manual as adopted by the City of Renton may be proposed between the dates of November 1st and
March 31st of each year. The Development Services Division’s approval of this work is required prior to
final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is
being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or
fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the
area defined by the drip line of any tree to be retained.
6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around
the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be
placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on
each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups
of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the
applicant shall provide supervision whenever equipment or trucks are moving near trees.
7. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible
for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and
/or your U.S. Fish and Wildlife Service permit.
Development Engineering:
(Contact: Justin Johnson, 425-430-7291, jtjohnson@rentonwa.gov)
1. See Attached Development Engineering Memo dated April 16, 2018
Fire Authority:
(Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov)
1. The fire flow requirement for a single family home is 1,000 gpm minimum for dwellings up to 3,600
square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum
of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is required within 300-feet
ADVISORY NOTES TO APPLICANT
Page 2 of 2 LUA**-000***
of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. Additional fire
hydrants and water mains are required to be added in order to meet minimum requirements.
2. Fire department apparatus access roadways are required to be a minimum of 20-feet wide fully paved,
with 25-feet inside and 45-feet outside turning radius. Fire access roadways shall be constructed to
support a 30-ton vehicle with 75-psi point loading. Access is required within 150-feet of all points on
the buildings. Maximum grade of road shall not exceed 15 percent.
3. Both of the new proposed homes require the installation of an approved fire sprinkler system. Lot 1
requires sprinklers per city street ordinance for all homes on dead end streets over 500-feet long. Lot
2 requires sprinklers as they have asked for a variance on the proposed access roadway width from 20-
feet down to 16-feet.
Technical Services:
(Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov)
1. No comments at this time.
Community Services:
(Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov)
1. Parks Impact fee applies.
Police:
(Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov)
1. No comments at this time.
Building:
(Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov)
1. Recommendations of the geotechnical report must be followed as a condition of building permits.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:April 16, 2018
TO:Jill Ding, Senior Planner
FROM:Justin Johnson, Civil Plan Reviewer
SUBJECT:Cherie Lane Short Plat
LUA16-000964
I have reviewed the application for Cherrie Short Plat located at 3400 Block Talbot Road South and have
the following comments:
EXISTING CONDITIONS
The site is approximately 115,870 square feet in size and is rectangular in shape with a pan handle along
the North West corner. The site is a vacant lot and is mostly forested with a wetland located along the
east side of the lot. The site is fronted by Talbot Road South on the west side of the parcel and S 34th St
along the east side of the parcel.
WATER: The proposed development is within the City’s water service area and in the Talbot Hill 350-
hydraulic zone. There is an existing 12-inch water main (see City water project plan no. W-0599) in
Talbot Rd S. which can deliver a maximum flowrate of 3,700 gallons per minute. The static water
pressure is about 109 psi at ground elevation of 96 feet.
SEWER: The site is in the Soos Creek Water and Sewer District service area.
STORM DRAINGE: The site currently contains is a vacant lot and there is no on-site stormwater
conveyance system. There is an existing 18” piped conveyance system (R-22880E) on the north side of
the lot that flows from east to west.
STREETS: At this location Talbot Road South is a Collector Arterial with existing right of way width of 60
feet.
Cherrie Lane Short Plat– LUA16-000964
Page 2 of 4
April 16, 2018
WATER COMMENTS
The following improvements are required to be provided by the developer for the proposed project to
provide water service to each lot.
1. The site is located within the City of Renton Hospital & South Talbot Hill Water Special assessment
district.
2. A new 1-inch water service and meter will be required for each of the new lots. The
meter will be installed by the City at a cost of $3,310.00. The water system
development fee for the 1-inch meter is $3,486.00.
3. Per Renton Regional Authority’s review comments, a new hydrant will be required.
If a fire sprinkler system is a required, a double check valve assembly shall be
installed on the water supply line to a fire sprinkler system.
4. Applicant will need to extend an 8 inch water main within the driveway to service
the proposed location of the new hydrant.
5. Civil plans for the water main improvements will be required and must be prepared by a
professional engineer registered in the State of Washington. Please refer to City of Renton
General Design and Construction Standards for Water Main Extensions as shown in Appendix J of
the City’s 2012 Water System Plan. Adequate horizontal and vertical separations between the
new water main and other existing and new utilities (storm sewer pipes and vaults, sanitary
sewer, power, gas, electrical) shall be provided for the operation and maintenance of the water
main
6. Applicant is required to provide and easement to the City of Renton for the installation of the new
water main and the new hydrant as shown within lot 2.
SEWER COMMENTS
1. Please contact Soos Creek water and Sewer district for Sewer Requirements.
STORM DRAINAGE COMMENTS
1. A preliminary drainage plan and Technical Information Report (TIR) prepared by Encompass
Engineering dated March 27, 2018 was submitted to the City as part of the site plan submittal.
The site is located in the City’s Flow Control Duration Standard (Forested Site Conditions). The
site is located in the Black River drainage basin. The TIR was completed in accordance with the
standards found in the 2016 City of Renton Surface Water Design Manual.
2. Applicant has shown within the TIR that they will fall under the exemption for the flow control
requirements to satisfy Core Requirement #3, Flow Control Facilities. Any additional revision to
impervious surfaces may require re-evaluation of the exemption to core requirement 3.
3. Conveyance calculations were not provided in the preliminary TIR. Conveyance calculations
shall be included in the final TIR to satisfy Core Requirement #4, Conveyance System.
4. The preliminary drainage plan shows a piped stormwater conveyance system in the Talbot Road
that conforms to the City’s street standards. New storm drain shall be designed and sized in
Cherrie Lane Short Plat– LUA16-000964
Page 3 of 4
April 16, 2018
accordance with the standards found in Chapter 4 of the 2017 RSWDM. Storm drain with a
minimum diameter of 12” is required in the public right of way.
5. Applicant shall provide an easement to the City of Renton for the area within the driveway to
allow the City of Renton to maintain all of their utilities.
6. Each new lot is subject to a stormwater system development charge. The 2017 SDC for
stormwater is $1,718.00 per lot. Stormwater SDC fees are due at construction permit issuance.
TRANSPORTATION/STREET COMMENTS
1. The 2017 transportation impact fee is $5,430.85 per single family home. The current property
contains one mobile home dwelling, the developer will receive a credit of $3,215.64 for the
existing mobile home and will be required to pay the remaining $2,215.21. Fees are payable at
the time of building permit issuance for each individual home.
2. Talbot Road South is classified as a Collector Arterial with existing right of way width of 60 feet.
As per RMC 4-6-060 the minimum ROW width required on a minor arterial is 83 feet for 2 lanes
(94 feet for 3 lanes) with street improvements as per RMC 4-6-060. As per RMC 4-6-060, the half
street frontage improvements will be required to be built Talbot Road frontage by the
developer.
3. Right of way dedication of 11.5 feet is required. The applicant may submit a street modification,
with the request to reduced cross section for Talbot Road.
4. Per RMC 4-4-080, the maximum width of a single loaded garage driveway is 9’ and the maximum
width of a double loaded garage driveway is 16’. If a garage is not present, the maximum
driveway width is 16’. Driveways shall not be closer than 5’ to any property line. Maximum
slopes for driveways shall not exceed 15% provided that driveways exceeding 8% provide
slotted drains at the lower end with positive drainage discharge to restrict runoff from entering
the garage.
5. Per RMC 4-6-060, street lighting is not required since the project is less than four residential
units.
6. The project does not require a Traffic Impact Analysis as the project produces less than 20
vehicles per hour in both the AM and PM peak periods.
7. Paving and trench restoration within the City of Renton right of way shall comply with the City’s
Restoration and Overlay requirements.
Cherrie Lane Short Plat– LUA16-000964
Page 4 of 4
April 16, 2018
GENERAL COMMENTS
1. The fees listed are for 2018. The fees that are current at the time of the respective permit issuance
will be levied. Please see the City of Renton website for the current fee schedule.
2. Retaining walls that are 4’ or taller from bottom of footing and stormwater detention vaults will
require a separate building permit. Structural calculations and plans prepared by a licensed
engineer will be required as part of the building permit review.
3. All civil plans shall conform to the current City of Renton survey and drafting standards. Current
drafting standards can be found on the City of Renton website.
4. A separate plan submittal will be required for a construction permit for utility work and street
improvements. All plans shall be prepared by a licensed Civil Engineer in the State of Washington.
5. Please see the City of Renton Development Engineering website for the Construction Permit
Application and Construction Permit Process and Submittal Requirements. Please contact the City
to schedule a construction permit intake meeting.
Report of Geological Engineering Services
Proposed Property Development
Coal Mine Hazard Assessment and
Ground Proofing Program
Newfourth LLC Property
King County Parcel No. 302305-9108
Renton, Washington
December 27, 2016
ICE File No. 1096-001
Prepared For:
Newfourth LLC
Prepared By:
Icicle Creek Engineers, Inc.