ENERGY SERVICES AUTHORIZATION NO.2017-299 A(1)
Detailed Investment Grade Energy Audit& Energy Services Proposal
City of Renton
April 26, 2017
MASTER ENERGY SERVICES AGREEMENT NO. 2015-181 J(10)
The Owner and the Energy Services Company(ESCO)named below do hereby enter into this
Authorization under terms described in the following sections:
Authorization to Proceed Project Conditions
Compensation for Energy Services
I. AUTHORIZATION TO PROCEED:
Energy Services Company: Owner:
Sunset Air, Inc. City of Renton
5210 Lacey Blvd. SE acting through the
Lacey, WA 98503 Department of Enterprise Services
Telephone No. (360) 456-4956 Engineering and Architectural Services
Fax No. (360) 455-4005 PO Box 41476
E-Mail 'asunsetair.cora Olympia,WA 98504
J R
By By
: pt
Name / _ , ��'. J W. 6 Name oger A. W. field,P.E.
Title : - .- ,. Title Energy Pram Manager
Date Date J/'/'M
State of Washington Contractor's License No. SUNSETA*220CM
State of Washington Revenue Registration No. 600 240 865
Federal Tax Identification No. 91-0997053
MWBE Certification No.
H. COMPENSATION FOR ENERGY SERVICES:
Basic Services COMPENSATION
Energy Audit and Energy Services Proposal $ 7,500.00
Design $ 0.00
Construction Management $ 0.00
Overhead and Profit $ 0.00
Grand Total(plus WSST as applicable) $ 7,500.00
Authorization No. 2017-299 A(1) Page 1 of 2
III. PROJECT CONDITIONS:
1i
The Project Conditions contained in the Master Energy Services Agreement will be used
unless specifically changed herein. The cost effectiveness criteria for this project are per
Sunset Air,Inc. proposal dated April 17,2017.
IV. SCOPE OF WORK:
Per the ESCO proposal dated April 17,2017 conduct a Detailed Investment Grade Energy
Audit of City of Renton, Renton Senior Center, to identify cost effective energy n`
conservation measures and present a written Energy Services Proposal, including all energy
audit documentation. The ESCO shall prepare the final Energy Services Proposal, detailing
the actual energy services and ESCO equipment to be provided, energy savings and cost
guarantees, measurement and verification plans, and commissioning plans for the proposed
measures. Measures will include items that save energy,water and other resources. The
Cost Effectiveness Criteria for this project shall be as established in the Master Energy
Services Agreement or as modified in Section III above.
V. SCHEDULE FOR COMPLETION
Final completion of the Energy Audit and Energy Services Proposal within 125 calendar days
after Authorization to Proceed.