Loading...
HomeMy WebLinkAboutContract CAG-18-072 ENERGY SERVICES AUTHORIZATION NO.2017-299 A(1) Detailed Investment Grade Energy Audit& Energy Services Proposal City of Renton April 26, 2017 MASTER ENERGY SERVICES AGREEMENT NO. 2015-181 J(10) The Owner and the Energy Services Company(ESCO)named below do hereby enter into this Authorization under terms described in the following sections: Authorization to Proceed Project Conditions Compensation for Energy Services I. AUTHORIZATION TO PROCEED: Energy Services Company: Owner: Sunset Air, Inc. City of Renton 5210 Lacey Blvd. SE acting through the Lacey, WA 98503 Department of Enterprise Services Telephone No. (360) 456-4956 Engineering and Architectural Services Fax No. (360) 455-4005 PO Box 41476 E-Mail 'asunsetair.cora Olympia,WA 98504 J R By By : pt Name / _ , ��'. J W. 6 Name oger A. W. field,P.E. Title : - .- ,. Title Energy Pram Manager Date Date J/'/'M State of Washington Contractor's License No. SUNSETA*220CM State of Washington Revenue Registration No. 600 240 865 Federal Tax Identification No. 91-0997053 MWBE Certification No. H. COMPENSATION FOR ENERGY SERVICES: Basic Services COMPENSATION Energy Audit and Energy Services Proposal $ 7,500.00 Design $ 0.00 Construction Management $ 0.00 Overhead and Profit $ 0.00 Grand Total(plus WSST as applicable) $ 7,500.00 Authorization No. 2017-299 A(1) Page 1 of 2 III. PROJECT CONDITIONS: 1i The Project Conditions contained in the Master Energy Services Agreement will be used unless specifically changed herein. The cost effectiveness criteria for this project are per Sunset Air,Inc. proposal dated April 17,2017. IV. SCOPE OF WORK: Per the ESCO proposal dated April 17,2017 conduct a Detailed Investment Grade Energy Audit of City of Renton, Renton Senior Center, to identify cost effective energy n` conservation measures and present a written Energy Services Proposal, including all energy audit documentation. The ESCO shall prepare the final Energy Services Proposal, detailing the actual energy services and ESCO equipment to be provided, energy savings and cost guarantees, measurement and verification plans, and commissioning plans for the proposed measures. Measures will include items that save energy,water and other resources. The Cost Effectiveness Criteria for this project shall be as established in the Master Energy Services Agreement or as modified in Section III above. V. SCHEDULE FOR COMPLETION Final completion of the Energy Audit and Energy Services Proposal within 125 calendar days after Authorization to Proceed. 2017299Aagrko 1 is Authorization No. 2017-299 A(1) Page 2 of 2