Loading...
HomeMy WebLinkAboutAdden 1 �. ` CAG-18-072,Adden#1-18 ENERGY SERVICES AUTHORIZATION AMENDMENT NO. 1 i Project Title Renton Senior Center Energy Efficiency Imp. Authorization No.2017-299 A (1) Facility City of Renton Date August 4,2017 z. This Amendment,when properly signed, shall be the basis on which the Subject Authorization shall be modified. s Authorization(this sheet) Project Completion and Compensation [ Scope of Work Options: Modify Basic Services ` E Approvals Energy Services Company: Owner: Sunset Air, Inc. City of Renton 5210 Lacey Blvd. SE acting through the Lacey,WA 98503 Department of Enterprise Services AL Engin ring and Architectural Services By: /, //de/ Name: ,r . ! �► ," ,,, Douglas Kilpatrick,P.E., 1' Title: 't "- ►`r -; . r E L". Energy Engineer Date: 8J4(f(�- # ,823 fit? t Compensation for Energy Services COMPENSATION Basic Services Current New Previous Energy Audit and Energy Services Proposal $ 7,500.00 $ 0.00 $ 7,500.00 Design $ 5,042.39 $ 5,042.39 $ 0.00 ¢' Construction Management $ 3,361.59 $ 3,361.59 $ 0.00 Overhead and Profit $ 10,084.77 $ 10,084.77 $ 0.00 Grand Total(Plus WSST as applicable) _ $ 25,988.75 $ 18,488.75 $ 7,500.00 Value of this Amendment-$18,488.75 (Plus Washington State Sales Tax) is k i t Authorization No.2017-299 A(1) Page 1 of 2 } Scope of Work Energy efficiency measures under Contract No. 2017-299 G(1-1) will include energy efficiency improvements to replace interior lighting,including any and all necessary ancillary equipment. The ESCO will perform a detailed engineering design as needed to obtain Owner review and approval of the proposed systems and to obtain bids as required. The ESCO will provide construction management, as-built drawings, and O&M manuals. All work is per the City of Renton Energy Services Proposal dated July 18, 2017. Schedule For Completion Final completion 90 days from execution of this Amendment. 2017299Aamdlko } , . 1 , Authorization No.2017-299 A(1) Page 2 of 2 i