Loading...
HomeMy WebLinkAboutAdden 2 CAG-18-072,Adden#2-18 ENERGY SERVICES AUTHORIZATION AMENDMENT NO. 2 Project Title Renton Senior Center Energy Efficiency Imp. Authorization No. 2017-299 A(1) K' Facility City of Renton Date October 24,2017 This Amendment,when properly signed, shall be the basis on which the Subject Authorization shall be modified. er Authorization(this sheet) Project Completion and Compensation Scope of Work Options: Modify Basic Services Approvals Energy Services Company: Owner: Sunset Air, Inc. City of Renton 5210 Lacey Blvd. SE acting through the Lacey,WA 98503 Department of Enterprise Services !.4,1,-ring and Architectural Services 11 — By: 111I Name: f� , - �+ . �, : Dou a as ilp trick,P.E.. .t: T Title: / P — _ Energy Engineer Date: /O/ c//3- ///713-l/7 Compensation for Energy Services COMPENSATION Basic Services Current _ New Previous Energy Audit and Energy Services Proposal $ 7,500.00 $ 0.00 $ 7,500.00 Design $ 13,848.36 $ 8,805.97 $ 5,042.39 Construction Management $ 9,232.24 $ 5,870.65 $ 3,361.59 Overhead and Profit $ 27,696.72 $ 17,611.95 $ 10,084.77 Grand Total(Plus WSST as applicable) $ 58,277.32 $ 32,288.57 $ 25,988.75 Value of this Amendment=$32,288.57 (Plus Washington State Sales Tax) Authorization No.2017-299 A(1) Page 1 of 2 S: Scope of Work I This Amendment to the Authorization is related to professional services provided for Change Order No. 1 on Contract No. 2017-299 G(1-1). Professional services include design, construction management and overhead and profit for the work performed under Change Order No. 1. Schedule For Completion Final completion scheduled for December 8, 2017. 2017299Aamd2ko fi sr: Authorization No.2017-299 A(1) Page 2 of 2 fk DES Energy Program COP-FA Coversheet Client Name City of Renton Project Number 2017-299 G Project Title Renton Senior Center Construction Added kitchen scope $ 117,413.00 Subcontractor 2 Subcontractor 3 Subcontractor 4 Subcontractor 5 Other 1 Other 2 Other 3 Bond a z% $ 2,34826 Subtotal $ 119,761.26 Sales Tax 10.00% $ 11,976.13 Construction Subtotal $ 131,737.39 Professional Services Percent Design _ _ 7.5% $ 8,805.97 CM 5% $ 5,870.85 OH&P 15% $ 17,611.95. Subtotal $ 32,288.57 Sales Tax 10.00% $ 3,228.86 PS Subtotal $ 35,517.43 l use a d r 6�t otvrtt f 5 Total Cost of Change I $ 167,254.82 Acknowledgement of Total Cost of Change Date .e� oZz Client Agency ,,,� j� �r 7 ESCO 1/47/1...„ 10/70 f 17 Energy Project Manager / Atif4A0 14,40/zoll