Loading...
HomeMy WebLinkAboutConstruction Observation Report 2-14-17 Conduit InspectionCLIENT: City of Renton PROJECT: Highlands Generator Replacement and Radio Equipment Relocation ENGINEER: RH2 Engineering CONTRACTOR: Colvico FOREMAN: Ethan Giles   CREW SIZE EQUIPMENT ON SITE     (3) Contractors Ground compaction equipment and excavator     WORK IN PROGRESS: Excavation of generator pad and trench work. WORK COMPLETED: Control Conduits Installed: C2, C3, C4, C5 installed in trench between HH-1 and base of elevated reservoir. HH-1 installed in ground and awaiting backfill and conduit installation. Demolition of sidewalk and existing generator building/pad completed. Tree removal completed. DISCREPIENCES NOTED: None DISCUSSIONS WITH CONTRACTOR: Contractor requested clarification on how far above the final grade the generator slab should be installed. ITEMS FOR OFFICE ACTION: Notify contactor that the generator slab should be 2” above the finished grade surrounding the generator pad. CAUSE FOR DISPUTE, CHANGE ORDERS, OR DELAYS: EXTRA WORK IN PROGRESS, EQUIPMENT, AND MATERIALS: Handholes are staged on site. OBSERVATIONS BY: Isaac Oquist TIME AT SITE: 9:00 AM – 9:45 PM  WEATHER: Overcast TEMPERATURE: 50 deg F