HomeMy WebLinkAboutCM_Construction_Mitigation_Description_Southport_Banner_180503_v1.pdfConstruction Mitigation Description – Southport / Boeing Fence Banner
Proposed construction dates for the project are between the first two weeks of May. Construction
duration will be one day. There will be no adverse effects from noise, dust, or traffic. Access to the site
will be adjacent to the right of way at the corner of Park Ave and Lake Washington Boulevard.