Loading...
HomeMy WebLinkAboutWAIVER FORM_PSE POLE REPLACEMENT SME AND CARDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalreqs.docx Rev: 08/2015 WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE APPLICATIONS Planning Division 1055 South Grady Way-Renton, WA 98057 Phone: 425-430-7200 | www.rentonwa.gov LAND USE PERMIT SUBMITTAL REQUIREMENTS: WAIVED BY: MODIFIED BY: COMMENTS: Arborist Report 4 Biological Assessment 4 Calculations 1 Colored Maps for Display 4 Construction Mitigation Description 2 AND 4 Deed of Right-of-Way Dedication 1 Density Worksheet 4 Drainage Control Plan 2 Drainage Report 2 Elevations, Architectural 3 AND 4 Environmental Checklist 4 Existing Covenants (Recorded Copy) 1 AND 4 Existing Easements (Recorded Copy) 1 AND 4 Flood Hazard Data 4 Floor Plans 3 AND 4 Geotechnical Report 2 AND 3 Grading Elevations & Plan, Conceptual 2 Grading Elevations & Plan, Detailed 2 Habitat Data Report 4 Improvement Deferral 2 Irrigation Plan 4 PROJECT NAME: DATE: PSE POLE REPLACEMENT SME AND CAR FEBRUARY 26, 2018 Waived provided stream study indicates no impact to criticalhabitat. Waived provided no tree removal or significant tree trimming is proposed. If tree trimming is propossed, the applicant shall identify on the tree retention plan which trees are proposed to be trimmed and how much, for review and approval by city arborist. 2 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalreqs.docx Rev: 08/2015 LAND USE PERMIT SUBMITTAL REQUIREMENTS: WAIVED BY: MODIFIED BY: COMMENTS: King County Assessor's Map Indicating Site 4 Landscape Plan, Conceptual 4 Landscape Plan, Detailed 4 Legal Description 4 Letter of Understanding of Geological Risk 4 Map of Existing Site Conditions 4 Master Application Form 4 Monument Cards (one per monument) 1 Neighborhood Detail Map 4 Overall Plat Plan 4 Parking, Lot Coverage & Landscaping Analysis 4 Plan Reductions (PMTs) 4 Post Office Approval 2 Plat Name Reservation 4 Plat Plan 4 Preapplication Meeting Summary 4 Public Works Approval Letter 2 Rehabilitation Plan 4 Screening Detail 4 Shoreline Tracking Worksheet 4 Site Plan 2 AND 4 Stream or Lake Study, Standard 4 Stream or Lake Study, Supplemental 4 Stream or Lake Mitigation Plan 4 Street Profiles 2 Title Report or Plat Certificate 1 AND 4 Topography Map 3 Traffic Study 2 Tree Cutting/Land Clearing Plan 4 Urban Design Regulations Analysis 4 Utilities Plan, Generalized 2 Wetlands Mitigation Plan, Final 4 Wetlands Mitigation Plan, Preliminary 4 Show trees within 20 feet of replacement poles and trees that will be pruned by more than 40% tree canopy. Show tree species, caliper inches, and drip-lines of trees ontree retention plan/site plan. topography map shown in geotechnical report satisfies thisrequirement. 3 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalreqs.docx Rev: 08/2015 LAND USE PERMIT SUBMITTAL REQUIREMENTS: WAIVED BY: MODIFIED BY: COMMENTS: Wetlands Report/Delineation 4 Wireless: Applicant Agreement Statement 2 AND 3 Inventory of Existing Sites 2 AND 3 Lease Agreement, Draft 2 AND 3 Map of Existing Site Conditions 2 AND 3 Map of View Area 2 AND 3 Photosimulations 2 AND 3 This Requirement may be waived by: 1. Property Services 2 Development Engineering Plan Review 3 Building 4 Planning