HomeMy WebLinkAboutDOE7_HEX_Report_coverpage.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map (see Exhibit 2 for more details)
HEX Report
A. REPORT TO THE HEARING EXAMINER
HEARING DATE: April 17, 2018
Project Name: I-405, Renton to Bellevue Project, Stage 1
Owner/Applicant: Linda J. Cooley, WSDOT / 600 108th Ave NE Suite 405, Bellevue, WA 98004
Contact: Kimberly Toal, I-405 Team / 600 108th Ave NE Suite 900, Bellevue, WA 98004
Project File Number: PR17-000278
Land Use File Number: LUA17-000808, SM, CAR, SMV
Project Manager: Clark H. Close, Senior Planner
Project Summary: The applicant, Washington State Department of Transportation (WSDOT) Northwest
Region, is requesting a Shoreline Substantial Development Permit, Critical Areas
Permit and Shoreline Variance for the I-405, Renton to Bellevue Project, Stage 1. The
Project includes roadway, bridge and trail work within the Urban Conservancy
shoreline environment at May Creek. Project improvements also include the
construction of a paved bicycle and pedestrian path along the Eastside Rail Corridor
from Ripley Lane in north Renton to the City of Renton’s northern boundary,
adjacent to Lake Washington, within the Shoreline Single Family Residential
environment. The request includes a shoreline variance from the design criteria for
public access sites under RMC 4-3-090D.4.d.i in order to deviate from trail width and
permeable material requirements.
Project Location: 4260 Lake Washington Blvd N, Renton, WA 98056. The project extends along I-405
for approximately 8 miles from mile post (MP) 3.8 in Renton to MP 11.9 in
Bellevue.
Site Area: 3,995 acres