Loading...
HomeMy WebLinkAboutAdden 1 CAG-18-048,Adden#1-18 "R qt AMENDMENT NO. _1_ TO AGREEMENT FOR FS 15 BACKFILL AND TESTING THIS AMENDMENT, dated rlfi 9 �q. , X ( , is by and between the City of Renton (the "City"), a Washington municipal corporation, and HWA GEOSCIENCES INC. ("Consultant"), a Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties,this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-18-048, dated March 15, 2018, to provide necessary services for the FS 15 Project (referred to herein as the "Agreement"); Whereas,the Parties wish to amend the Agreement to change the scope of work, and to change the compensation in order to add additional services. NOW THEREFORE, It is mutually agreed upon that CAG-18-048 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-1, which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-1. All Work shall be performed by no later than January 2, 2019. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased from $16,561.00 to $27,081.00, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actual performed according to the rate(s) or amounts specified in Exhibit A-1,which is attached and incorporated herein . 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT Or By: ' % i By: '�' --- '�e Kelly Beyme 7 Sandy Brodahl Administrator Principal ç/ q/ g 5 /a11 /i2 Date Date Attest Aip . ) Jaso A.Se 40 ,City i ler A.*roved as to Legal Form Shane Moloney Renton City Attorney Contract Template Updated 12/29/2017 0 PAGE 20F2 Project Cost Estimate Exhibit A-1 HWA Ref: 2016-136-21 Construction Inspection Services n"1111 HWAGEOSCIENCES INC. Task Order: 300 Renton Fire Statin 15Date: 21-May-18 Renton,Washington Prepared By: SB Prepared For: Robert Ebert with City of Renton I. �' ' �� �1 .r � li a ��1: `M�,�! ��; a �„�i� „i I;i �, i, ,,I� I i PROPOSED WORK SCOPE: This cost estimate is based on review of bid tabs and discussion with the client and client representative. Design utilized 2018 WSDOT Standard Specifications. The Scope of Services include: 1. Inspection of excavation and subgrade preparation for footings, retaining walls and confirmation of removal of any organic/soft/loose soils. 2. Verify placement and compaction of structural backfill. 3. Prepare a final summary letter of recharged bed material condition after construction.. 4. Written field reports will be prepared for all inspections and reviewed for QC. o-5, is I' I. 'li 1� .�.� 1 a � Ti 7.�� �, �� I. �� i ,., .. ;�; ..�i 1a.. .i �lji ,i ,I.,.,C. � ,,� ..I, h .. I Irs.,i, i � i. I i", I ., ., Supplement Request-ESTIMATED HWA LABOR: 2018 PERSONNEL&HOURLY RATES Scope of Services Principal Proj Mgr Inspector Clerical TOTAL TOTAL $64.00 $46.00 $33.00 $23.00 HOURS AMOUNT Inspection and testing of backfill placement and compaction(8 site visits-6hrs/day) 48 48 $1,584 Sample pick up for infiltration test on recharged bed material(pervious pavement) 3 3 $99 Analyze Infiltration Test Results of recharged bed material 2 Prepare a final summary letter of recharged bed material condition after construction 2 _ 4 $312 Project Management,QC review and reporting 2 10 2 14 $654 TOTAL LABOR: 4 16 53 0 65 $2,741 Construction Inspection Renton Fire Station 15 1 of 2 HWA GeoSciences Inc. Material Testing-LABORATORY TESTING ESTIMATE: LABORATORY EXPENSE DESCRIPTION Est No. Unit Test TOTAL Grain Size for Infiltration Test 3 $115 $345 Falling Head for Infiltration Test 3 $250 $750 LABORATORY TOTAL: $1,095 EXPENSES: EXPENSE Total DESCRIPTION Cost Nuclear gauge rental($30/Day),assuming 8 days $240 Mileage to and from the job site:IRS rate $200 Mileage for aggregate sampling, 2 trips $0 EXPENSE TOTAL: $440 HWA LABOR COSTS Direct Salary Cost (DSC) $2,741 Overhead n 197.81%of DSC $5,422 Fixed Fee @ 30%of DSC $822 LABOR TOTAL $8,985 ESTIMATED PROJECT TOTALS AND SUMMARY: Labor Total $8,985 Laboratory Testing $1,095 Direct Expenses $440 ESTIMATED PROJECT TOTAL: I $10,520 Assumptions: 1.These estimates may require adjustment due to the Contractor's rate of construction,weather delays,night work and/or other factors beyond our control. 2.The HWA PM reserves the right to shift hours between the various subtasks as required. 3.The HWA work scope does not include safety assessment. 4.No night work well be required. Construction Inspection Renton Fire Station 15 2 of 2 HWA GeoSciences Inc.