AMENDMENT NO. _1_ TO AGREEMENT FOR FS 15 BACKFILL
AND TESTING
THIS AMENDMENT, dated rlfi 9 �q. , X ( , is by and between the City of Renton
(the "City"), a Washington municipal corporation, and HWA GEOSCIENCES INC. ("Consultant"), a
Washington Corporation. The City and the Consultant are referred to collectively in this
Amendment as the "Parties." Once fully executed by the Parties,this Amendment is effective as
of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-18-048, dated
March 15, 2018, to provide necessary services for the FS 15 Project (referred to herein as the
"Agreement");
Whereas,the Parties wish to amend the Agreement to change the scope of work, and to change
the compensation in order to add additional services.
NOW THEREFORE, It is mutually agreed upon that CAG-18-048 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-1, which is attached and incorporated herein.
2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit A-1. All Work shall be performed by no later than January
2, 2019.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased from $16,561.00 to $27,081.00, plus
any applicable state and local sales taxes. The additional compensation shall be paid
based upon Work actual performed according to the rate(s) or amounts specified in
Exhibit A-1,which is attached and incorporated herein .
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT
Or
By: ' % i By: '�'
--- '�e
Kelly Beyme 7 Sandy Brodahl
Administrator Principal
ç/ q/ g
5 /a11 /i2
Date Date
Attest
Aip
. )
Jaso A.Se
40 ,City i ler
A.*roved as to Legal Form
Shane Moloney
Renton City Attorney
Contract Template Updated 12/29/2017
0
PAGE 20F2
Project Cost Estimate Exhibit A-1 HWA Ref: 2016-136-21
Construction Inspection Services n"1111 HWAGEOSCIENCES INC. Task Order: 300
Renton Fire Statin 15Date: 21-May-18
Renton,Washington Prepared By: SB
Prepared For: Robert Ebert with City of Renton
I. �' ' ��
�1 .r � li a ��1: `M�,�! ��; a �„�i� „i I;i �, i, ,,I� I i
PROPOSED WORK SCOPE:
This cost estimate is based on review of bid tabs and discussion with the client and client representative. Design utilized 2018 WSDOT
Standard Specifications.
The Scope of Services include:
1. Inspection of excavation and subgrade preparation for footings, retaining walls and confirmation of removal of any organic/soft/loose soils.
2. Verify placement and compaction of structural backfill.
3. Prepare a final summary letter of recharged bed material condition after construction..
4. Written field reports will be prepared for all inspections and reviewed for QC.
o-5, is I' I. 'li 1� .�.� 1 a � Ti 7.�� �, �� I. �� i
,., .. ;�; ..�i 1a.. .i �lji ,i ,I.,.,C. � ,,� ..I, h .. I Irs.,i, i � i. I i", I ., .,
Supplement Request-ESTIMATED HWA LABOR:
2018 PERSONNEL&HOURLY RATES
Scope of Services Principal Proj Mgr Inspector Clerical TOTAL TOTAL
$64.00 $46.00 $33.00 $23.00 HOURS AMOUNT
Inspection and testing of backfill placement and compaction(8 site visits-6hrs/day) 48 48 $1,584
Sample pick up for infiltration test on recharged bed material(pervious pavement) 3 3 $99
Analyze Infiltration Test Results of recharged bed material 2
Prepare a final summary letter of recharged bed material condition after construction 2 _ 4 $312
Project Management,QC review and reporting 2 10 2 14 $654
TOTAL LABOR: 4 16 53 0 65 $2,741
Construction Inspection
Renton Fire Station 15 1 of 2 HWA GeoSciences Inc.
Material Testing-LABORATORY TESTING ESTIMATE:
LABORATORY EXPENSE DESCRIPTION Est No. Unit Test TOTAL
Grain Size for Infiltration Test 3 $115 $345
Falling Head for Infiltration Test 3 $250 $750
LABORATORY TOTAL: $1,095
EXPENSES:
EXPENSE Total
DESCRIPTION Cost
Nuclear gauge rental($30/Day),assuming 8 days $240
Mileage to and from the job site:IRS rate $200
Mileage for aggregate sampling, 2 trips $0
EXPENSE TOTAL: $440
HWA LABOR COSTS
Direct Salary Cost (DSC) $2,741
Overhead n 197.81%of DSC $5,422
Fixed Fee @ 30%of DSC $822
LABOR TOTAL $8,985
ESTIMATED PROJECT TOTALS AND SUMMARY:
Labor Total $8,985
Laboratory Testing $1,095
Direct Expenses $440
ESTIMATED PROJECT TOTAL: I $10,520
Assumptions:
1.These estimates may require adjustment due to the Contractor's rate of construction,weather delays,night work and/or other factors beyond our control.
2.The HWA PM reserves the right to shift hours between the various subtasks as required.
3.The HWA work scope does not include safety assessment.
4.No night work well be required.
Construction Inspection