Loading...
HomeMy WebLinkAboutAdden 01 CAG-17-149,Adden#1-18 eWashington State Department of Transportation Supplemental Agreement Organization and Address Number 1 - KPG,PS, 3131 Elliott Avenue Suite 400 Seattle WA Original Agreement Number 98121 CAG-17-149 Phone: 253-627-0720 Project Number Execution Date Completion Date 10/24/2017 12/31/20 Project Title New Maximum Amount Payable Williams Ave S and Wells Ave S(Conversion) $381,919.18+$728,636.00=$1,110,550.18 Description of Work Develop Bid Ready Plans, Specifications, and Estimates for the Williams Ave S and Wells Ave S (Conversion) Project The Local Agency of City of Renton desires to supplement the agreement entered in to with KPG. P.S. and executed on 10/24/2017 and identified as Agreement No. CAG-17_149 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: The General Scope of Work of the Original Agreement is supplemented to include the attached Exhibit A. I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Remains unchanged - 12/31/20. III Section V, PAYMENT, shall be amended as follows: See attached Exhibits A, D, and E. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appr ,yeti Q� � spaces below and return to this office for final action. �� � OF RE',,, By: Jasot Frit I .w:' By: enis Law, Mayorp2,, --= tiA4. S S E A L Cons tant Signature A oving Authority Si.natub % Da o Attest: wr 4, / 2 '��A°RAr • siA• DOT Form 140-063 J%•n A. S.th, City 'ler. ""tine ``� Revised 09/2005 EXHIBIT A CITY OF RENTON WILLIAMS AVENUE S AND WELLS AVENUE S CONVERSION PROJECT FINAL DESIGN CAG 17-149 SCOPE OF WORK APRIL 26, 2018 A. PROJECT BACKGROUND/DESCRIPTION The City of Renton ("City") was recently successful in obtaining an STP Federal Grant for the Williams Avenue S and Wells Avenue S Conversion Project("Project")that will provide roadway, channelization, utility, and intersection improvements between S Grady Way and N 1st Street to support the two-way conversion of Wells Avenue S and Williams Avenue S. Primary components of this project will improve mobility and safety for all modes of travel and update urban design and streetscape amenities within the Downtown Core. This will encourage new economic development opportunities and transform Downtown Renton into a destination. The Project will construct the following improvements: • New concrete raised intersections at Wells Ave S/S 2nd St, Wells Ave S/S 3rd St, Williams Ave S/S 2nd St, and Williams Ave S/S 3rd St • New channelization on Wells Ave S and Williams Ave S from S Grady Way and N 1st St to accommodate the two-way conversion • New roadway illumination at the intersections of Wells Ave S/S 2nd St, Wells Ave S/S 3rd St, Williams Ave S/S 2nd St, and Williams Ave S/S 3rd St • New Bicycle Boulevard on Wells Avenue S between Houser Way S and the Cedar River Trail • New traffic signal systems at the intersections of Wells Ave S/S 2nd St,Wells Ave S/S 3rd St, Williams Ave S/S 2nd St, and Williams Ave S/S 3rd St, and revised traffic signal at the Williams Ave S/S Grady Way intersection • Asphalt overlay on S 2nd and S 3rd Streets from Wells Ave S to Williams Ave S and on Wells Ave S and Williams Ave S from S 2"d St to S 3rd • Support railroad crossing revisions on Wells Ave S and Williams Ave S at Houser Way S • New wayfinding and signage City of Renton Wells/Williams Conversion Project(CAG 17449) Final Design KPG Project Number: 16125 1 April,2018 • Removal of accessibility impediments at the intersections of Wells Ave S/S 2nd St, Wells Ave S/S 3rd St, Williams Ave S/S 2nd St, and Williams Ave S/S 3rd St • Water, Sewer, and Storm improvements at the following locations: o Storm —On S 3rd St from 150' east of Wells Ave S to Burnett Ave S, new 12" storm drain with laterals and mid-block catch basins. o Storm - New roadway drainage at each of the raised intersections o Water—On 3rd St, new 12" extensions and hydrants at each of the raised intersections except where existing 12" main extends past raised intersection. o Water - On 5 2nd St, new 12" main from Wells Ave S to Burnett Ave S. New 12" extensions and hydrants at each of the raised intersections except where existing 12" main extends past raised intersection. o Sewer—On S 2nd St, new 8" main extension to the north on Wells Ave S and new 12" main from Williams Ave S to Burnett Ave S. In March 2018,the preliminary design roll plot was delivered to the City and now the City has a desire to enter into a supplemental design agreement with the Consultant to complete the Final Design effort for the Project. The following services will be rendered that will result in delivering Bid Documents to the City: • Updated Topographic Survey and Basemapping • Environmental Permitting Support • Right of Way Acquisition Support • Final Geotechnical Reporting • Construction Phasing/Traffic Control • Public Involvement • Stormwater Documentation • Coordination with Utilities and Stakeholders • Preparing Plans, Specifications, and Estimates B. ASSUMPTIONS The following assumptions were identified to provide direction with design: u The project is funded through the Surface Transportation Program (STP) and other City funding sources. ❑ There is no design DBE Goal established for this project. u The Project will require NEPA Documentation (assumed Categorical Exclusion) and all permitting efforts and approvals will be led by the City. The Consultant shall support the permitting process with graphics where necessary. u The Project will require ROW Acquisition Services. The acquisition and certification of all ROW will be the led by the City. The Consultant shall support the ROW Acquisition process with graphics and plans where necessary. City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 2 Apri1,2018 u Design of kiosks,wayfinding signs, and parklets are not included in this scope of work. ❑ The City's Streetscape Design Guidelines and design elements from the Main Avenue Project will be utilized as a basis for urban design treatments. u WSDOT Channelization Plan Approval will not be required. ❑ BNSF coordination for the revised railroad signals on Wells Ave S and Williams Ave S at Houser Way S will be conducted by the City. It is assumed that BNSF will design and construct the signals prior to the City's Project advertising for contractors. C. KPG DELIVERABLES Deliverables prepared by the Consultant are identified at the end of each Work Element (WE). D. CITY OF RENTON PROVIDED ITEMS: The City of Renton will be responsible for the following: u Submittal reviews, comments, and approvals (1 to 2 sets of comments per submittal) ❑ Public notices, property owner mailings, postage, and host a project website u Meeting room arrangements ❑ Open House room arrangements u Right-of-entries for surveying, geotechnical review, and/or construction, if required u Wayfinding, Kiosk, and Parklet Designs u Environmental Permits u ROW Certification u Coordination of BNSF Design and Construction of revised railroad signals E. SCOPE OF WORK WORK ELEMENT 10—MANAGEMENT/COORDINATION/ADMINISTRATION The Estimated project duration is 10 months. 10.1 The Consultant will provide continuous project management for the project duration of the project through Preliminary Design (estimate 10 months). The Consultant will prepare monthly progress reports identifying work completed in the previous month, work in progress, upcoming work elements, and reporting of any delays, problems, or additional information needs. These reports will be submitted with the Consultant invoices. 10.2 Prepare for and attend bi-weekly design coordination meetings with City Staff and other project stakeholders. These meetings are to be held at Renton City Hall (estimate 12 meetings total). City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 3 Apri1,2018 10.3 The Consultant will update the project schedule. 10.4 The Consultant will conduct regular project team meetings (estimate 30 meetings total) with internal staff and subconsultants. 10.5 The Consultant will provide internal quality assurance/quality control (QA/QC) reviews of all major deliverables prior to submittal to the City. Work Element 10 Deliverables: • Monthly progress reports (10 months) • Project Schedule and Updates • Meeting notes • QA/QC Checklist(Signed and Initialed) WORK ELEMENT 11—ADDITIONAL SURVEY AND BASEMAPPING This Work Element includes additional survey, basemapping, and potholing not outlined in WE 2 of the Preliminary Design. As the City and Franchise utility designs become more defined, additional survey and potholing of areas not in the previously defined project limits may be required. 11.1 Re-establish horizontal and vertical control points along the corridor for field topographic survey. Basis of control will be City of Renton Datum. (Horizontal NAVD 83/91, Vertical NAVD 88). Control points will be established and will be made available for use during design/construction.The consultant will locate,field survey, and calculate positions for monuments and control points throughout the project limits, using the Washington State plane coordinate system. Conventional or GPS surveying methods will be used on this project. 11.2 Field survey will be conducted on any areas not defined in the Preliminary design WE 2. It is assumed for the purposes of this scope that two (2) additional days of field will be required for additional ground survey. • Field survey of planimetric features and utilities. Topographic mapping of the existing ground will be taken at approximately at 25-ft intervals (to 2-ft. contour intervals). • Included in this WE are locate overhead lines, signal loops, locate paint marks in WE 11.3 at 50-ft intervals, locate surface features (valves, manholes,catch basins, junction boxes, vaults, etc.). Irrigation systems will not be included. Perform observation and measure-downs of existing storm drain catch basins and manholes and sewer manholes within the two intersections. The approximate size, type (brick, concrete), and general condition of the structures to confirm City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 4 Apri1,2018 suitability for continued use, and approximate size and location of pipes will be documented. These observations will be made from the surface. 11.3 The Consultant shall coordinate utility locates, identification, survey, and other work, as necessary, to locate franchise underground and overhead utilities in order to identify any potential conflicts with the proposed improvements. Consultant shall subcontract with a utility locating company to paint all utility locations within the complete survey sections so that they can be surveyed in WE 11.2. 11.4 CADD mapping work to prepare 1"=20' topographic base map and digital terrain model (DTM) in AutoCAD format of the project within the limits. It is assumed for the purposes of this scope two (2) additional days of CADD mapping. 11.5 Potholing to identify potential utility conflicts will be completed as necessary for design (80 additional estimated). The locations of the potholes will be surveyed and added to the base map. Work Element 11 Deliverables: • Electronic copies of the updated base map will be delivered to the City. ❑ Additional Basemapping Delivered to 10 Months after NTP. WORK ELEMENT 12—FINAL STORM WATER ANALYSIS This Work Element includes the effort required to complete the project's stormwater documentation in accordance with the 2016 City of Renton Surface Water Design Manual. 12.1 Prepare a Draft Surface Water Technical Information Report (TIR)for the project. The Draft TIR will address comments from the City of Renton on the Draft Stormwater Technical Memorandum submitted as part of the preliminary design phase.The draft TIR will be submitted with the 60% plans. 12.2 Prepare a Final TIR that addresses City review comments and documents the final design. The final TIR will be submitted with the 100% plans. Work Element 12 Deliverables: • Draft Surface Water TIR, hard copy and Electronic PDF. • Final Surface Water TIR, hard copy and Electronic PDF. u Storm water Technical Memorandum Delivered to City with the 60%and 100% PS&E submittals. Work Element 12 Assumptions: City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 5 Apri1,2018 ■ The project will not be subject to flow control or water quality treatment requirements. As a result, the TIR will have a concise format similar to the previously-submitted Draft Storm water Technical Memorandum. WORK ELEMENT 13—TRAFFIC SIGNAL FOUNDATION DESIGN The following items are to be performed by the sub-consultant, Amec Foster Wheeler Environment & Infrastructure, Inc. (Amec Foster Wheeler), under this task. Amec Foster Wheeler will provide geotechnical and structural engineering services for design of traffic signal pole foundations. These services will include conducting engineering analyses and drafting plan notes and design details for the recommended traffic signal pole foundation types. 13.1 Administration, Coordination and Supervision • Supervision of Amec Foster Wheeler personnel and activities to ensure compliance with contract scope and schedule. 13.2 Project Meetings • Design coordination meeting with City and Consultant staff. It is estimated that Amec Foster Wheeler will attend one meeting at Renton City Hall. • Internal design coordination meetings—Amec Foster Wheeler will conduct regular internal design coordination meetings with key design team members. 13.3 Geotechnical Engineering Analysis: • Review subsurface information data obtained from the borings conducted during the field assessment. • Develop soil parameters to be used for the structural design of pole foundations. • Assist structural engineer with application of soil parameters and with selecting constructible options for the pole foundation design. 13.4 Structural Engineering Analysis: • Review draft geotechnical report and additional information relevant to traffic signal pole foundation design. • Provide structural engineering for up to 8 foundation types. These foundation types are based on two soil profile conditions and up to two different traffic signal pole loading criteria (a total of 8 structural evaluations). • Compile engineering analyses and prepare recommendations for up to four different signal pole foundation types. • Prepare general notes and draft modified traffic signal pole foundation details based on WSDOT and AASHTO criteria, to be done CAD. 13.5 Revised Geotechnical Engineering Report. The report will include: City of Renton Wells/Williams Conversion Project(CAG 17449) Final Design KPG Project Number: 16125 6 Apri1,2018 In addition to subsurface information and pavement design recommendations, revised geotechnical engineering report will include the following: • Description of the subsurface conditions and a summary table of soil parameters used for pole foundation design including lateral soil bearing pressure and torsional soil friction; A draft of the revised report will be provided to the Consultant for review by the Consultant and City. Once review comments are received,a final report will be submitted to the Consultant to deliver to the City. Work Element 13 Deliverables: • Traffic signal pole foundation design calculations; • General plans and construction details relevant to traffic signal pole foundations, stamped and signed by a Washington State professional engineer and provided as CAD files; ■ Draft of Revised the Geotechnical Engineering Report; and • Final Geotechnical Engineering Report that incorporates review comments, stamped and signed by a Washington State professional engineer. u Foundation design delivered to the Consultant 3 months after NTP ❑ Amended Geotechical Report Delivered to the City 10 months after NTP. Work Element 13 Assumptions: • The budget shown in Exhibit G assumes this task is less than three (3) months in duration. • Design plans showing location of traffic signals will be provided to Amec Foster Wheeler. • Demand structural loading will be provided to Amec Foster Wheeler. • Engineering for pole foundations will be based on WSDOT and AASHTO design methods. • A non-standard design of traffic signal pole foundation will be conducted based on "Very Soft"soil profile. ■ Where possible,Amec Foster Wheeler will modify and expand WSDOT standard details to accommodate signal pole foundation design based very soft soils. WORK ELEMENT 14-RIGHT OF WAY ACQUISITION SUPPORT SERVICES This WE covers the necessary effort to provide the City's selected ROW Acquisition Consultant with ROW Acquisition Support Services. 14.1 The Consultant will prepare up to 8 property owner exhibits and legals to be utilized during meetings/negotiations with the property owners. The purpose of these exhibits is to give each property owner a clear understanding of the ROW City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 7 Apri1,2018 impacts along their frontage. The exhibits will contain the following information: ❑ Existing parcel features, ROW lines, and Parcel Lines u Proposed Frontage Improvements and dimensions where necessary ❑ Proposed temporary easement lines o Parcel name and number o Scale, north arrow, and legend (in color) o Legal and Exhibits Work Element 14 Deliverables: • Up to 8 parcel exhibits in PDF and 11"x17"format. o Parcel Exhibits delivered to the City when requested. o Legal Exhibits o Updated Title Reports Work Element 14 Assumptions: • Only Temporary Construction Easements are assumed. • Existing and proposed ROW/Easement staking is not included in this scope of services. • Acquisition of all new ROW/Easements will be the responsibility of the City's selected ROW consultant. WORK ELEMENT 15—ENVIRONMENTAL SUPPORT SERVICES This WE covers the necessary effort to provide the City's selected Environmental Consultant with Environmental Support Services. 15.1 The Consultant shall provide documentation support to the City's selected environmental services consultant for the development of the environmental permitting documents. These include, but are not limited to technical reports, aerial maps, quantities, and figures. Work Element 15 Deliverables: • Electronic pdf copies of aerial maps, quantities, and figures ❑ Supporting permitting documents delivered to the City when requested. Work Element 15 Assumptions: • Preparation of all necessary environmental permits will be the responsibility of the City's selected permitting consultant. WORK ELEMENT 16—PUBLIC INVOLVEMENT FINAL DESIGN This WE covers the effort required to continue the public involvement process outlined City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number 16125 8 Apri1,2018 in the Preliminary Design Phase (WE 7). This WE will support one (1) additional Open House and supporting documents to be held at the completion of the 100%Design Phase. 16.1 The Consultant shall prepare for and attend one (1) Open House after the 100% Design Phase is complete. It is anticipated that the following items will be updated by the Consultant for the open house: open house flyer, sign in sheet, comment form, roll-plots, photos of existing conditions, before/after photo simulations, project schedule exhibit and other informational exhibits conveying general project information (i.e. project goals, project budget, etc.). 16.2 The Consultant will assist in the preparation of website graphics and up to two (2) project fliers to be distributed to the public. Work Element 16 Deliverables: • Draft Open House Materials, Electronic PDF • Final Open House Materials, Hard Copies and Electronic PDF • Website Graphics and Project Fliers (2), Electronic PDF and JPEG's ❑ Open House materials delivered to the City after the 100%Design Phase. Work Element 16 Assumptions: • General project information such as project goals, budgets, etc. shall be provided by the City to the Consultant to be incorporated in the Open Houses. • City will host and update the project website. WORK ELEMENT 17—UTILITY COORDINATION FINAL DESIGN The Consultant will continue to coordinate with private utilities affected by the proposed improvements. Efforts included under this WE are as follows: 17.1 Prepare letters with updated design plans to send to purveyors at each submittal phase. 17.2 Update Utility Conflict Plan: This plan will be submitted to all purveyors with utilities in the project limits to assess whether said utilities may be in conflict with the proposed improvements. 17.3 Prepare for and attend Final Design meetings (2 assumed) with franchise utilities to discuss utility conflicts and relocations. Work Element 17 Deliverables: • Letters to Purveyors • Utility Conflict Figure(11x17) • Franchise Utility Meeting Notes City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number; 16125 9 Apri1,2018 • Updated basemap showing utility potholes and actual utility locations ❑ Utility Coordination Efforts Under this WE will be complete 10 Months After NTP Work Element 17 Assumptions: • Survey required for utility relocations is not included. • Any franchise utility expansion which is required to be incorporated into the project is not included. WORK ELEMENT 18—FINAL DESIGN(60%, 100%) The Consultant shall prepare 60%and 100%Plans,Specifications and Estimates for review and approval by the City. Plans shall be formatted to provide sufficient detail for convenient field layout of all proposed facilities. City Standard Details and WSDOT standard plans will be supplemented with project specific details as required. All design plans and documents will be signed by a licensed professional engineer in the State of Washington. 18.1 The consultant shall prepare 60% plans for review and approval by the City. The 60% submittal will include all comments received from the Preliminary Design project meetings. 18.2 The consultant shall prepare 100% plans for review and approval by the City. The 100% submittal will include all comments received from the 60% review. 18.3 Consultant will calculate quantities and prepare construction cost estimates in support of the 60%and 100%submittals. 18.4 Consultant will prepare specifications based on 2018 WSDOT Standard Specifications, using contract boilerplate, federal funding requirements, and general special provisions provided by the City for the 60% and 100%submittals. 18.5 Consultant will prepare a preliminary construction sequencing and traffic routing exhibit. The exhibit will be in a roll plot format with aerial backdrop showing 1/4 and 1/2 intersection closures with associated traffic routing. Work Element 18 Deliverables: • One (1)%-size unbound,five(5)%-size bound of the 60%Design Plans ■ One (1)%-size unbound,five (5)%-size bound of the 100%Design Plans ■ One(1)hard copy,and two(2)electronic versions(PDF and Excel)of the 60%and 100% Engineer's Estimate • Five (5)hard copies, and electronic versions (PDF)of the 60%and 100%Specifications ❑ 60%PS&E will be complete 5 Months after NTP City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 10 Apri1,2018 ❑ 100%PS&E will be complete 9 Months After NTP • Roll plot of the construction sequencing and traffic routing WORK ELEMENT 19-WSDOT REVIEW AND BID DOCUMENTS The Consultant shall provide WSDOT Review Plans, Specifications and Estimates for review and approval by WSDOT. Bid Document Plans, Specifications and Estimates will be developed after addressing WSDOT review comments. WSDOT Review documents and Bid Documents will be stamped,signed and dated by a licensed professional engineer in the State of Washington. 19.1 The Consultant shall prepare a set of WSDOT concurrence submittal documents (Plans,Specifications and Cost Estimate)for WSDOT Northwest Region for review. The WSDOT review submittal will include all comments received from the City's 100% Design review and include the WSDOT Checklist. 19.2 Prepare and submit a Public Interest Finding (PIF)for all agency supplied and sole sourced materials and Maximum Extent Feasible (MEF) documentation in accordance with WSDOT requirements. 19.3 The Consultant shall prepare Bid Documents (Plans, Specifications and Cost Estimate) for advertisement by the City. The Bid Documents will include all comments received from the WSDOT review submittal. The estimated sheet count is the following: ❑ 1 Cover Sheet ❑ 2 Sheet Index, Alignment Plan, and Survey Control ❑ 1 Legend and Abbreviations u 2 Typical Sections u 3 Roadway Details u 1 Driveway Details ❑ 12 Site Preparation Plans and TESC Plans ❑ 12 Roadway and Drainage Plans ❑ 6 Drainage Profiles ❑ 4 Concrete Panel Plan o 8 Flowline and Sidewalk Layout Plan o 6 Water Plans and Profiles o 3 Water Details o 3 Sewer Plans and Profiles o 1 Sewer Details ❑ 4 Signalization Plans ❑ 4 Signalization Notes City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 11 Apri1,2018 u 4 Signal Pole Specifications ❑ 4 Wiring Diagram ❑ 4 Illumination Plans ❑ 1 Illumination Details ❑ 1 One Line Notes u 2 ITS Details ❑ 4 Urban Design Plans ❑ 2 Urban Design Details ❑ 4 Landscape Plans ❑ 1 Landscape Details ❑ 4 Irrigation Plans u 1 Irrigation Details ❑ 12 Channelization and Signing Plans ❑ 2 Right of Way Plans Total: 119 Sheets 19.4 Consultant will assist the City during the bidding process in answering questions by the Contractors, or in providing information for an addendum, as requested by the City. Assistance Work Element 19 Deliverables: • Two (2) hard copy 'z -size bound of the Plans, Specifications, & Estimate, delivered to WSDOT • Public Interest Finding for sole source and agency supplied materials • MEF Documentation • One (1)%-size unbound,five (5) " -size bound of the Bid Plans • One(1)hard copy, and two(2)electronic versions(PDF and Excel)of the Bid Engineer's Estimate • Five (5)hard copies, and electronic versions (PDF) of the Bid Specifications ❑ WSDOT PS&E Submittal will be complete 2 weeks after 100%review comments ❑ Bid PS&E Submittal will be complete 1 week after WSDOT review comments • Addenda and Answers to Questions During Bidding Work Element 19 Assumptions: • The City will provide the Consultant with copies of approved PIF documents from a recent similar project and will include Certificates of Materials Origin(CMO)for all sole sourced materials. • Only one (1)review by WSDOT will be required. ADDITIONAL SERVICES The City may require additional services of the Consultant. The scope of these services will be determined based on the unanticipated project needs or other considerations at City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 12 Apri1,2018 the sole discretion of the City. This work may include items identified in the current WE authorizations as well other items, which may include, but are not necessarily limited to the following: • Design of Wayfinding Signs, Kiosks, and Parklet's • Design of Art Features • Providing Construction Administration Services These services will be authorized under a future contract supplement if necessary. At the time these services are required, the Consultant shall provide a detailed scope of work and an estimate of costs. The Consultant shall not proceed with the work until the City has authorized the work and issued a notice to proceed. City of Renton Wells/Williams Conversion Project(CAG 17-149) Final Design KPG Project Number: 16125 13 Apri1,2018 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS Client City of Renton lEACP Project Williams Ave 5 and Wells Ave S Conversion Project-Final Design KPG PROJECT NUMBER:16125 Interdisciplinary Design rDATE: April,2018 I Labor Hour Estimate Total Noun and Labor Few 4 EnglneenngSr Engineer Construction Sr Trensp Project Design Architecture Survey Engineering Estimate by Task Principal Mgr Mgr Planner Engineer Engineer Technician II _Technician Technician Survey Crew I Survey Craw II Office Admin 1Lkban Design Project Resident CAD Architecture Construction Sr Covet Mg Aviation Mg Mgr Sr Architect Surveyor Enrpneer Project LA Technician Technician I Admin Architecture Construction Documentation Landscape Construction WE No. WE Description Survey MgrMgr CAO Mgr Office En0r Specialist Arctateci Technician 1 Sr inspector Sr.Admin Trensportaeon Technician Planner 4 j Inspector , $ 225.00 $ 202.00 $ 184.00 $ 163.00 f 16600 $ 14100 $ 129.00 $ 118.00 $ 112.00 0 104.00 $ 165.00 $ 215.00 $ 92.00 hours Fee WE 10-Management/Coordination/Admin 10.1 Project Manaoement and Administrative Services 20 I 10 30 0 4.00090 102 City Staff Coordination Meering$ 24 24 $ 4.41600 1 10 3 Update Project Schedule 6 8 $ 1.472 00 110 4 Internal Team Meetings 1301 12 45 12 12 12 6 0 105 $ 17.700 00 1 10$ OA+OC Reviews 24 32 16 24 96 S 16,728.00 Task Total 0 36 129 28 12 36 6 6 10 0 0 0 0 263 $ 45,116.00 tWE 11-Additional Survey and Basemapping ..- i11 1 Establish Horizontal and Vertical Control 4 4 $ 860 00 112 Field Survey and note reduction , 8 8 S 1,7720.00 11.3 Utility Locates 4 16 20 $ 4.004 00 114 Dewiest:Soo 16t6 $ 2256.00 115 Potholing 1660 76 S 15.15600 Task Total 0 0 0 0 0 36 0 0 0 0 0 68 0 124 $ 23,996.00 _ - WE 12-Final Stornswater Analysis - 12.1 daft T1R 5 j _ I 24 32 5 4.85600 122 Fm,N TIR 0 I_ 16 24 i'$ 3,;28.00 Task Total 0 0 16 1 0 0 40 0 0 0 0 _ 0 0 0 56 $ 8,68400 WE 13-Traffic Signal Foundation Design 13 1 i,AMEC Adrnin Coordination 0 $ 13 2 AMSC Project Meetings 44 S 736 00 161 AMEC Geotech Enyineatrg Noble _ 0 S 13 4 AMEC Structural Engineering Analyiis 4 4 $ 730 00 13 5 Revved Gealectnx4l Report 24 24 S 4.416.00 Task Total 0 0 32 0 0 0 0 0 0 0 0 0 0 32 0 5,1508.00 WE 14•ROW Acquisition Support Services 14 I IROW Erebus 16 32 - 20 - 88 5 11 93600 Task Total 0 0 16 0 0 32 0 0 40 0 0 0 0 88 5 11,936.00 WE 15-Environmental Support Services 15 7 'Environmental Oocumentalrcn Sopoarl 24 ! 0 32 S 5.248.00 Task Total 0 0 24 0 0 0 0 0 0 8 0 0 0 32 $ 5,248.00 WE 16-Public Involvement•Final Design 16I Open Nouse 1 l6 16 49 40 0 r20 6 15.05600 162 Website Graphics and Fliers 4 16 16 0 04 $ 5 024 00 Task Total 0 0 20 0 16 0 0 56 0 56 0 0 16 164 ,5 20.080,00 WE 17-Utility Coordination Final Design 121 iUkkty Letters 8 f 24 32 5 368030 17 2 Utility Conlbct Pian 32 i 32 5 5088 00 17 3 Utility Meetings 121 a B i, 16 S 2 600 00 Task Total 0 0 48 0 0 8 0 0 0 0 0 0 24 80 $ 12.168.00 FEE ESTIMATE 412672018 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS Client City of Renton Y'y/�^"'� Project Williams Ave Sand WeilsAve$Conversion Project•Final Design Interdisciplinary Design KPG PROJECT NUMBER:16125 P Y DATE: April,2018 Labor Hour Estimate _ Total Hours and labor Fee Enenng m Engineer Construction Sr Tnsp. ( Project Design Architecture Survey Engineering Estimate by Task Principal pneMg Sr. Mgr Planner Engineer Engine Technician II Technician Technician Survey Crew Survey Crew II Chloe Admin Sr Const Mgr Aviation Mgr Urban Design Sr Architect Project Resident Project LA CAD Architecture Construction Mgr Surveyor Engineer Technician Technician I Admin Architecture Construction Documentation Landscape Construction WE No. WE Description Survey Mgr Mgr CAO Mgr Office Eng Specialist Architect Technician Sr.inspect. Sr.Admin Traruanponerrtabon Technician P inspector $ 225.00 $ 202.00 $ 184.00 $ 183.00 S 156.00 $ 141.00 $ 128.00 $ 118.00 $ 112.00 S 104.00 0 16500 8 216.00 S 92.00 Hours Fee WE 18-Final Design(60%,100%) r a 1 Prepare 40%Piens 1 _ _ 1688 $ 227,372.00 Cover Suet _ 6 E S 896 00 Sheet Index Alignment Plan and Survey Control e _ 6 $ 506 00 1,0,,,,,i and Abbrsvubons ` 8 Le8 5 896.00 Typical Sections 16 24 2 42 0 624000 Roadway Denali 16 24 2 w 42 $ 624000 °noway Dermis a 16 2 Site Preparation Plans and TESC Plans 24 40 _ 40 2 26 S 3.744 00- yarn 106 '515.400 00 Roadway and°rootage Plans 24 40 40 Z e- ;Cil $$ 15.400 00 Drainage Profiles 24 40 2 66 S 1428000 er- Concrete Panel Plan _ 24 40 2 66 0 1028000 Fiowlrne and Sidewalk Layout Plan 24 45 2 66 S 1028000 Water Plans and Profiles 16 64 2 Water beak8 40 2 52 $ 17.33600 _ 50 $ 7,33600 Sevres Plans and Profiles 16 32 2 50 S 7.680 00 Sewer Details 8 16 2 26 S 3 952 00 Sigrakaabon Plans _ 16 f 60 2 20 98 S 13.10600 $I$n462090n Notes 16 1 40 2 20 78 $ 10.888.00 Sgal Poe Spoatonaona 16 40 _ 2 20 76 0 10 008 00 Wiring Diagram ' 0 0 illumination Plans 6 40 2 50 S 7.336 00 Illumination Details 6 16 2 14 42 $ 5.61000 One Line Notes 8 24 2 34 $ 5.08000 ITS OeraNa 8 24 _ 2 34 S 4.512,00 Urban Design Plans 6 60 _ 2 30 100 $ 11.728.00 Urban Desigt Oetado 0 60 2e 20 90 $ 10 688 00 Landscape Plans _ 24 24 2 50 5 406800 Landscape Debuts 8 18 S 2 472.00 !moo.Piens 40 2 42744 DO Irrigation Dennis _ to 2 IB $ 282200 ChannebOaaon and Shrimp Plans, _ 40 24 8 72 $ 1104000 Right of Way Ren 8 24 32 $ .16000 FEE ESTIMATE 4:262018 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS Client City of Renton K l"G Project Williams S and Wells Ave S Conversion Project-Final Design Interdisc, liner Design KPG PROJECT NUMBER:16125 P Y 9 DATE: Aprilt,2018 Labor Hour Estimate Total Hoon and Labor Fee Principal 1 Engineering Sr Engineer Construction Sr Trensp Project Dn Archrteclure Survey Engineering V Survey Crew Survey Crew II Office Admin Estimate by Task Mgr p laPlanner Engineer Engineer Technician II Technicsan Techniraan Urban Design Prosect Resitlent CAD Architecture Construction Sr Const Mgr Aviation Mgr Mgr Sr ArchitectProsect Engineer Project LA Technician Technician I Admin Architecture r Construction Documentation Landscape Construction WE No. WE Description Survey Mgr CAD Mgr Mgr I Office Engr Specialist Architect Technician Sr Inspector Sr.Admin T"'_'="°' Technician Planner Inspector $ 225.00 $ 202.00 $ 18400 $ 153.00 5 156.00 $ 141.00 $ 128.00 0 118.00 $ 112.00 $ 104.00 $ 165.00 $ 215.00 $ 92.00 Hours Fee 182 Prepare 100%Plans _ S 176.401.00 Cover Sheet 4 4 5 448.50 Sheet Index,Alignment Plan,and Survey Control 4 4 $ 448.00 Legend and ADbrenarrom 2 2 5 224.00 Typical Sections 8 12 I 21 $ 3.120.00 Roadway Decals a 12 I 21 $ 3.12000 Dnveway Debts e a • t 17 $ 2600E0 Site Preparation Plans and TESC Plans 24 40 16 911 $ 12.2116 00 Roadway and Drainage Plans 30 40 29 7 91 $ 1}2}2.073 Drainage Profile. 12 40 1 53 5 7.960.00 Concrete Panel Plan 12 _ 20 1 33 S 5.14000 Pleadew end S4ewalk Layout Plan 24 - 40 1 85 0 10,168 00 Water Plans and Profiles 840 I 40 S 722400 Water t1,1666 a 32 - 41. $ 6.096 00 Sewne Pans and PreNe. a _ 24 _ 33 0 4.968 00 Sewer Details B 8 17 $ 2 712.00 Sxpaklaticn Plans 32 40 24 90 5 14.13600 Srgnahzaken Notes 32 40 40 113 $ 15.900 00 Sorel Pok Specifications, 16 24 24 65 $ 8936 00 Wamg Diagram e16 16 16 41 $ 5.504 00 Illumination Plans 6 20 111na0en Delade 8 12 S 29 S 4104.00 1a1n 29 S 4.108,00 One Line Notes 6 122: $ 3 276 00 ITSDaads a 16 _ 25 5 3.67200 Urban Design Plans 4 30 24 59 $ 6 800 00 Urban Desion Details 4 S0 I 24 59 S 8.800.00 lan0scapa Pans _ 12 12 I 25 S 3.464 00 Landscape Details e6 1 17 $ 238000 ;rogation Plans , 20 , t 21 5 3,372.00 Irrigation Details a _ I 9 5 1,418.00 Channekraton and Signing Plans 24 24 49 S 791200 Right of Way Ptan 16 8 24 5 3 840 00 18.3 Ou400oes and Eaomatee(8014,10014) 40 16 40 32 24 112 $ 22 536.00 18.4 $pera4catlam 1605,100541 60 24 24 24 4 136 .00 18 5 Construction Oenuencing and Traffic Pouting a 40 16 64 $S 1 11 1064 504 00 Task Total 0 8 778 1 232 0 1172 244 280 151 286 0 0 4 3D91 $ 459,132,00 WE 19-WSDOT Review and Bid Docs 19 1 WSDOT POSE Review Set _ 16 1 0 i 16 16 16 72 S 10 344 00 _ 192 PIF and MEF Documents 32. 24 16 72 5 11.150011 19 3 B41 Documents PSAS 40 16 24 _ 12 24 i16 S 17.720.00 194 Bidding Assistance 24 24 24 - 72 5 11,7/2,00 Task Total 0 0 112 48 0 08 28 40 16 0 0 0 0 332 $ 50,936.00 Total Labor Hours and Fee 0 44 1,175 308 28 1,412 278 382 217 350 0 88 44 4,262 5 643,084.00 FEE ESTIMATE 4/26/2018 EXHIBIT D PRIME CONSULTANT COST COMPUTATIONS Client City of Rento Project WIIIfoo n Ave S and Wells Ave S Conversion Prosect-Final Designs KPG PROJECT NUMBER:16125 Interdisciplinary Design DATE: April,2015 Labor Hour Estimate Total Hours and tabor Fee Principal Engineering r,{ ( Conm0ucbwl Sr Tramp P0oiecd Oemgn Architecture Survey Engneera+g Estimate by Task tapr Mot Planner Engine Engineer Tedaucren n Techrouan TechnicianSurveySurvey Geer t Survey Crew tt Mee AMhEstimate t rat Asa f o 00 Myr )khan ' Sr.Architect �0' Resident A,od 0.A CAD AttiliieCarra Comlruc5dro Mgr Surveyor EngineerTechriaan Technrasn I Arpin WE No. 55E Description Survey Mgr ArchitectCAD Mot Corvsbucbne Docvmor loSon Lenthcape Construction MW Deka Ent5 Specialist Architect Technician Sr Inspector Sr.Mawr Tr Bare anneadon Te,-hMcian Inspector f 22500 1 202.00 $ 15400 5 163.00 $ 156,00-5 141.00 1 126,40 $ 11600 1 11200 1 104.00 f 10500 f 21500 f 62.00 Haan Pae Subconsuttanls a ny Locale Service S 2 000 00 Updated Tate Reports tA55500) S ',800 00 50/50015 460 ES60t) 5 40 000 00 AA1EC Soppieronnt t S 20.25200 Subtotal $ 03052.00 Total Suboenwttant Expense f 0700200 Reimbursable Direct Non-Salary Costs hultaire at Current IRS rate $ 1.500 50 Reproduchen Allowance S _ Total Reimbursable Expense f 2.500.00 Total Estimated Budget S 725.636.00 FEE ESTIMATE 402612016 EXHIBIT D AMOUNTS NOT TO EXCEED Client City of Renton K 13'G Project VlNFame Ave S and Wens Ave S Conversion Project-Final Design Interdisciplinary Design KPG PROJECT NUMBER,16125 DATE: April,2018 Labor Hour Estimate Total Hours and tabor Fee Principal Engineering Sr Etpineev Callstrtrcaon Sr.Tramp Protect Design Archite Lure Survey Engine er ng Survey Cray I Survey Crow 11 O}#co Admin Mgr MQr Planner Engineer Technician 11 Technician Technician A nl Estimate by Task Sr.Cram Mgr 4»6000 MOr lkbmn Design so A:ctvtert Protect Resident Protect Land. CAD Archriledura Coratruchan Survey Mgr Surveyor Er neer Arch Technician Technician I Adorn Assist:n§ Trak Architecture Conshucaon Dupanentafran Landed** GonahuctIon Cenittu Seo No. Tub Description Sauey MgrMgr CAD Mgr Office Eng" Specieke Technician Techrlaan Asnistare &minimsSrmp Iectof Sr Admin Transportation Technician Oftice Assistant MangerPlanner , inspector S 225.00 S 202.00 S 184.00 5 183.00 $ 156.00 5 141.00 9 128.00 5 118.00 5 112.00 1 104.00 $ t65.00 3 215..00 S 92,00 S 70.00 Hours Fee -- Low $ 92 28 S 67 60 S 64.73 5 58 64 S 53 25 5 49 92 $ 43 42 9 41 40 S 4607 S 35 33 1 man crew__ wan crew S 31.75 S 22.09 High 5 58.10 S 75 02 S 67.69 5 60 31 $ 57 25 5 53 00_9 4720 5 43.01 5 42.80 S 3938 including ,. including '5 35 865 30 41 Moltipiier(1 467 ICR 0 0.30 FF), 2 767 2 767 2 767 2.7672.767 2 767 _ 2.767 2 767 2.767 _ 2 767 equipment equipment 2 767 2 787 _ Minimum rate 5 227 67 $ 18760 8. 179.11 5 162 81�$ 147.34 5 138.13 S 120 14 $ 114 55+ 5 110 87 $ 97 76 S 6765 5 51 12 Maximum rale 5 243 77 5 207 58 $ 167.30 $ 166 88 $ 159 41 $ 146 65 S 530.00.S 120.67:5 118 43 5 108.96 $ ;19.22 S 64 14 Negotiated Rate $ 225.00 $ 202.00 0 184.00 $ 163.00 § 156.00 $ 141.00 $ 128.00 $ 118.00 S 112.00 5 104.00 $ 165.00 $ 21500 $ 92.00 $ 70.00 FEE ESTIMATE 4/26/2018 Exhibit D ANL Washington State Transportation Building Department of Transportation 310 Maple Park Avenue S.E. Transportation P.O.Box 47300 Olympia,WA 98504-7300 360-705-7000 TN:1-800-833-6388 www.wsdotwa.gov April 19, 2018 KPG, P.S. 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 Subject: Acceptance FYE 2017 ICR—Risk Assessment Review Dear Ms. Suzy Rowe: Based on Washington State Department of Transportation's (WSDOT) Risk Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed FYE 2017 ICR of 146.70%. These rates are applicable to Washington Local Agency Contracts only.These rates may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360)705-7019 or via email consultantrates @wsdot.wa,gay. Regards; Jonson, Erik Apr 20 2018 8:02 AM cosign ERIK K. JONSON Manager, Consultant Services Office EKJ:kms Acceptance ICR Audit Office Review Exhibit D Project Name: Wells and Williams Ave Conversion Project Consultant: KPG,Inc. Consultant fee calculation worksheet Appendix 31.77 Rate Weight Value Degree of Risk The degree of risk for this project is: above average 25 0.32 8.00 Weight from 0.17 to 0.35,0.35 being riskiest Relative Difficulty of Work The difficulty of work for this project is: above average 20 0.32 6.40 Weight from 0.17 to 0.35,0.35 being most difficult Size of Job $ 600,000.00 <100,000=0.35 15 0.32 4.80 100,000-5,000,000 proportionate from 0.34 to 0.21 5,000,000 -10,000,000-proportionate from 0.21 to 0.17 Period of Performance >24 months=0.35 12 months 2-24 months proportionate from 0.17 to 0.35 15 0.25 3.75 <2 months=0.17 Assistance by the Agency The amount of assistance from the agency is: Few items provided 15 0.35 5.25 rate from 0.17 to 0.35,0.35 being few items provided Sub-Consulting 10 0.22 2.20 10% of cost >40%=0.35 0-40%proportionate from 0.17 to 0.35 0%=0.17 Total 30.40 Fraction,rounded to two digits 0.3 April 26,2018 Keith Woolley City of Renton Public Works—5th Floor 1055 S Grady Way Renton, WA 98057 Re: KPG Project Team Commitment—Wells Ave S and Williams Ave S Conversion Dear Mr. Woolley: KPG is committing for the duration of the project the discipline leads listed below. These professionals will not be replaced without advance notification and subsequent authorization from the City. Employees Title Sessyle Asato QA/QC Manager Paul Fuesel LA Manager Nelson Davis Principal Jason Fritzler Project Manager Olivia Paraschiv Engineering Lead Kirk Smith Stormwater Lead Ray Edralin Stormwater Engineer Michael Lapham Traffic Analysis Lead Jan Ciganik Signal/Illumination/ITS Lead Janessa Donato Roadway Lead Mike Bowen Survey Lead Ron Reichel ROW Lead Phil Adams Survey Field Justin Williams Survey Field Karen Weisser Survey Tech Chris Johnson Survey Tech Elizabeth Gibson Landscape/Irrigation Lead Phuong Nguyen Urban Design Lead Coreen Schmidt LA John DaviesTraffic Analysis Engineer Hidemi Tsuru Signal/Lighting Engineer George Hilen Lighting Engineer Brunye Adams Roadway Engineer Judy Johnson Landscape Tech Danielle Winklemann Admin Terri Simms Admin Michelle Torres Admin Joe Giacobazzi Public Inv Lead Vonnie Stockman CAD Tech ..--:=` Daniel Clark CM Lead Sincerely, Jason Fritzler,PM KPG Exhibit E Level of Effort Hours Estimate Personnel and Maximum Hourly Rates Per Category ..4,irlior„ii 0 .. 0 0 V� e0 O 0��� 00J i : �' J49 foster Q. �o� c¢, Qomc., c0 c`., ro �� cw c0 �o Q� �U ¢yam 2' wheeler c, c� �� �� � (� �a �� Qo 1p, totals 4/ 4 0 4v Q 40 C1 Q by task Task Task Description $72.63 $66.85 $44.40 $39.57 $32.10 $31.52 $26.06 hours 2.1 Administration,Coordination,Supervision Invoicing 2 2 4 Project management 4 2 2 8 2.2 Meetings Meetings with City and KPG 8 8 2.3 Geotechnical Engineering Pole foundations engineering 1 8 8 2 19 0 2.4 Structural Engineering _ Pole foundation engineering(8 soil+load combinations) 4 24 44 72 Prepare General Notes and Detail sheets 2 8 30 30 70 2.5 Reporting . Report update and preparation 2 8 10 2 4 26 total hours per category 9 62 94 0 0 34 8 207 DSC(Direct Salary Cost) S 654 $ 4,145 $ 4,174 $ - $ - $ 1,072 $ 208 $ 10,252 OH=DSC X 1.4557 $ 952 $ 6,033 $ 6,076 $ - $ - $ 1,560 $ 303 $ 14,924 FF=0.30 X (DSC) $ 196 $ 1,243 $ 1,252 $ - $ - $ 322 $ 63 $ 3,076 Total burdened labor $ 1,801 $ 11,422 $ 11,501 $ - $ - $ 2,953 $ 575 $ 28,252 Subtotal AMEC Expenses S - Subtotal Subcontract Expenses S - 0%markup S - TOTAL ODCs S - TOTAL ESTIMATED FEE $ 28,252 EXHIBIT E - SUMMARY OF COSTS Signal-Pole Design and Reporting Wells and Williams Avenues amec Renton, Washington foster wheeler Amec Foster Wheeler Environment & Infrastructure, Inc. DIRECT SALARY COST(DSC): Classification(AMEC Class Code) Hours x Hourly Rate _ Cost Task Total Principal Geotechnical Engineer(624 to 625) 9 $72.63 $653.67 Associate Engineer(620 to 623) 62 $66.85 $4,144.70 Senior Geologist/Engineer(616 to 619) 94 $44.40 $4,173.60 Project Geologist/Engineer(614 to 615) 0 $39.57 $0.00 Staff Geologist/Engineer(611 to 613) 0 $32.10 $0.00 CAD Drafter(517) 34 $31.52 $1,071.68 Clerical/Word Processor(808 to 809) 8 $26.06 $208.48 TOTAL DSC 207 $10,252.13 OVERHEAD COST(OH COST-including salary additives): OH Rate of 1.4557 x DSC 1.4557 x $10,252.13 = $14,924.03 FIXED FEE(FF): FF Rate of 0.30 x(DSC) 0.3 x $10,252.13 = $3,075.64 REIMBURSABLES: Field Expenses(mileage, equipment, etc.) $0.00 Subcontract Expenses(0%mark-up) $0.00 TOTAL REIMBURSABLES $0.00 TOTAL $28,251.79 EXHIBIT E Subconsultant Fee Determination Summary Sheet ACTUALS NOT TO EXCEED TABLE Wells and Williams Avenues,Renton,WA 4.* Amec Foster Wheeler Environment&Infrastructure,Inc. amec foster wheeler Current Rates Minimum Maximum Overhead Fee Billing Rate Base Direct Labor Minimum Maximum Minimum Maximum Minimum Maximum Class Code Class Code Description Rate I Rate 145.57% 30.00% Billing Rate=Direct PROFESSIONAL LEVELS , OH OH Fee Fee Rate Rate 601 Professional Level 1 $11.33 $12.07 602 Professional Level 2 $12.08 $13.68 $16.49 $17.57 $3.40 $3.62 $31.22 $33.26 603 Professional Level 3 $13.69 $15.29 $17.58 $19.91 $3 62 $4.10 $33.29 $37.70 604 Professional Level 4 $15.30 $16.90 $19,93 $22.26 $4.11 $4.59 $37,73 $42.13 605 Professional Level 5 $16.91 $18.51 $22.27 $24.60 $4.59 $5.07 $42.16 $46.57 606 Professional Level 6 $18.52 $20.12 $24.62 $26.95 $5.07 $5.55 $46.60 $51.01 607 Professional Level 7 $20.13 $21.72 $26.96 $29.29 $5.56 $6.04 $51.04 $55.44 608 Professional Level 8 $21.73 $23.34 $29.30 $31.62 $6.04 $6.52 $55.47 $59.85 609 Professional Level 9 $23.35 $24.95 $31.63 $33.98 $6.52 $7.00 $59.88 $64.32 610 Professional Level 10 $24.96 $26.55 $33.99 $36.32 $7.01 $7.49 $64.35 $68.75 611 Professional Level 11 $26.56 $29.13 $36.33 $38.65 $7.49 $7.97 $68.78 $73.16 612 Professional Level 12 $29.14 $32.19 $38.66 $42.40 $7.97 $8.74 $73.19 $80.27 613 Professional Level 13 $32.20 $35.35 $42.42 $46.86 $8.74 $9.66 $80.30 $88.71 614 Professional Level 14 $35.36 $38.42 $46.87 $51.46 $9.66 $10.61 $88.73 $97.41 615 Professional Level 15 $38.43 $41.72 $51.47 $55.93 $10.61 $11.53 $97.44 $105.87 616 Professional Level 16 $41.73 $44.86 $55.94 $60.73 $11.53 $12.52 $105.90 $114.97 617 Professional Level 17 $44.87 $48.61 $60.75 $65.30 $12.52 $13.46 $115.00 $123.62 618 Professional Level 18 $48.62 $52.22 $65.32 $70.76 $13.46 $14.58 $123.65 $133.95 619 Professional Level 19 $52.23 $55.84 $70.78 $76.02 $14.59 $15.67 $133.98 $143.90 620 Professional Level 20 $55.85 $59.45 $76.03 $81.29 $15.67 $16.75 $143 93 $153.88 621 Professional Level 21 $59.46 $63.07 $81.30 $86.54 $16.76 $17.84 $153.91 $163 83 622 Professional Level 22 $63.08 $66.68 $86.56 $91.81 $17.84 $18.92 $163.85 $173.80 623 Professional Level 23 $66.69 $70.30 $91.83 $97.07 $18.92 $20.00 $173.83 $183.75 624 Professional Level 24 $70.31 $73.91 $97.08 $102.34 $20.01 $21.09 $183.78 $193.73 625 Professional Level 25 $73.92 $77.53 $102.35 $107.59 $21.09 $22.17 $193.75 $203.67 626 Professional Level 26 $77.54 $149.35 $107.61 $112.86 $22.18 $23.26 $203.70 $213.65 TECHNICAL LEVELS $112,87 $217.41 $23.26 $44.81 $213.68 $411.56 501 Technician Level 1 $8.24 $8.24 502 Technician Level 2 $8.25 $9.17 $11.99 $11.99 $2.47 $2.47 $22.71 $22.71 503 Technician Level 3 $9.18 $10.09 $12.01 $13.35 $2.48 $2.75 $22.73 $25.27 504 Technician Level 4 $10.10 $11.02 $13.36 $14.69 $2.75 $3.03 $25.30 $27.81 505 Technician Level 5 $11.03 $11.95 $14.70 $16.04 $3.03 $3.31 $27.83 $30.37 506 Technician Level 6 $11.96 $12.88 $16.06 $17.40 $3.31 $3.59 $30.40 $32.93 507 Technician Level 7 $12.89 $13.91 $17.41 $18.75 $3.59 $3.86 $32.96 $35.49 508 Technician Level 8 $13.92 $14.94 $18.76 $20.25 $3.87 $4.17 $35.52 $38.33 509 Technician Level 9 $14.95 $15.97 $20.26 $21.75 $4.18 $4.48 $38.36 $41.17 510 Technician Level 10 $15.98 $17.51 $21.76 $23.25 $4.49 $4.79 $41.20 $44.01 511 Technician Level 11 $17.52 $19.06 $23.26 $25.49 $4.79 $5.25 $44.04 $48.25 512 Technician Level 12 $19.07 $21.12 $25.50 $27.75 $5.26 $5.72 $48.28 $52.52 513 Technician Level 13 $21.13 $23.69 $27.76 $30.74 $5.72 $6.34 $52.55 $58.20 514 Technician Level 14 $23.70 $26.27 $30.76 $34.49 $6.34 $7,11 $58.23 $65.28 515 Technician Level 15 $26.28 $28.84 $34.50 $38.24 $7.11 $7.88 $65.31 $72.39 516 Technician Level 16 $28.85 $31.42 $38.26 $41.98 $7.88 $8.65 $72.42 $79.47 517 Technician Level 17 $31.43 $33.99 $42.00 $45.74 $8.66 $9.43 $79.50 $86.58 518 Technician Level 18 $34.00 $41.20 $45.75 $49.48 $9.43 $10.20 $86.61 $93.67 $49.49 $59.97 $10.20 $12.36 $93.69 $113.53 ADMINISTRATIVE LEVELS 801 Administrative Level 1 $6.55 $9.45 802 Administrative Level 2 $9.46 $11.26 $9.53 $13.76 $1.97 $2.84 $18.05 $26.04 803 Administrative Level 3 $11.27 $13.07 $13.77 $16.39 $2.84 $3.38 $26.07 $31.03 804 Administrative Level 4 $13.08 $14.88 $16.41 $19.03 $3.38 $3.92 $31.06 $36.02 805 Administrative Level 5 $14.89 $16.70 $19.04 $21.66 $3.92 $4.46 $36.04 $41.00 806 Administrative Level 6 $16.71 $18.51 $21.68 $24.31 $4.47 $5.01 $41.03 $46.02 807 Administrative Level 7 $18.52 $21.09 $24.32 $26.95 $5.01 $5.55 $46.05 $51.01 808 Administrative Level 8 $21.10 $24.19 $26.96 $30.70 $5.56 $6.33 $51.04 $58.12 809 Administrative Level 9 $24.21 $27.30 $30.72 $35.21 $6.33 $7.26 $58.15 $66.66 810 Administrative Level 10 $27.31 $51.50 $35.24 $39.74 $7.26 $8.19 $66.72 $75.23 $39.76 $74.97 $8.19 $15.45 $75.26 $141.92 Labor rates below the Washington State Minimum Wage apply to employees in other states Table may have minor rounding errors. At direct reimbursables will be billed at cost with no mark-ups. All travel will be billed per the WSDOT Accounting Manual M 13-82,Chapter 10,Travel. These rates may be used for the life of the contract,assuming 5%escalation each year. Direct Reimbursable Costs Reprographics At Cost Couriers/Deliveries At Costs Telephone At Cost Copies $.012/copy Truck Rentals At Cost Fax $1.00/page Field equipment At Cost Mileage,per Travel Directive $.54/mile Project Name: Rainier Avenue S Subconsultant: AMEC FW Environment&Infrastructure,Inc. Consultant fee calculation worksheet Appendix 31.77 Rate Weight Value Degree of Risk The degree of risk for this project is: Slightly above average 25 0.29 7.25 Weight from 0.17 to 0.35,0.35 being riskiest Relative Difficulty of Work The difficulty of work for this project is: Slightly above average 20 0.29 5.80 Weight from 0.17 to 0.35,0.35 being most difficult Size of Job $ 30,000.00 <100,000=0.35 15 0.35 5.25 100,000-5,000,000 proportionate from 0.34 to 0.21 5,000,000 -10,000,000-proportionate from 0.21 to 0.17 Period of Performance >24 months=0.35 4 months 2-24 months proportionate from 0.17 to 0.35 15 0.19 2.85 <2 months=0.17 Assistance by the Agency The amount of assistance from the agency is: Few items provided 15 0.35 5.25 rate from 0.17 to 0.35,0.35 being few items provided Sub-Consulting 10 0.32 3.20 34%of cost >40%=0.35 0-40%proportionate from 0.17 to 0.35 0%=0.17 Total 29.60 Fraction,rounded to two digits 0.3