HomeMy WebLinkAboutD_Decision_PSE Renton Memorial Stadium Shoreline Exemption_180612.pdfPLANNING DIVISION
CERTIFICATE OF EXEMPTION
FROM SHORELINE SUBSTANTIAL DEVELOPMENT
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
DATE:
PROJECT NUMBER:
PROJECT NAME:
PROJECT MANAGER:Angelea Weihs, Assoicate Planner
LUA18-000396, SME
PSE Renton Memorial Stadium Natural Gas Service Replacement
June 12, 2018
OWNER:Puget Sound Energy, Inc.
PO Box 97034 M/S PSE-09N
Bellevue, WA 98009-9734
CONTACT:Puget Sound Energy, Inc.
Jessica Jackson
PO Box 97034, PSE-09N
Bellevue, WA 98009-9734
PROJECT LOCATION:405 LOGAN AVE N
PROJECT DESCRIPTION:Puget Sound Energy (PSE) is requesting approval of a Shoreline Exemption and for
proposed replacement and maintenance activities on the existing natural gas distribution
service to the Renton Memorial Stadium, located at 405 Logan Ave N (Parcel #s
182305HYDR and 0723059053). Work will be located within the City’s Cedar River Trail
and will be within Cedar River Regulated Shoreline Jurisdiction (Shoreline High Intensity;
Cedar River Reach A). PSE states that the existing pipes and gas regulator station are
at the end of their useful life and need to be replaced. All proposed work will be in grass
and in the existing paved parking lot of the Stadium (See Exhibit 2). PSE will not be
blocking or disturbing the hard surface of the Cedar River Trail for this project . Work is
anticipated to begin during the summer of 2018, following Shoreline Exemption approval.
No tree removal is proposed with this project.
SEC-TWN-R: SE07 - 23 - 5
LEGAL DESCRIPTION:
(King County Assessor)POR OF SE 1/4 OF SE 1/4 ELY OF CWW # 2 WLY OF
WILLIAMS ST & S OF LN RNG S 89-18-45 W FR PT ON WLY
MGN OF ST 995.34 FT SLY OF S LN OF 6TH AVE N & POR GL
1 SEC 18-23-5 LY ELY OF CWW # 2 & WLY OF WILLIAMS ST
WATER BODY/REACH:Cedar River Reach A
EXEMPTION JUSTIFICATION: An exemption from a Shoreline Management Substantial Development Permit is hereby
Approved with Conditions* on the proposed project in accordance with RMC 4.9.190C 'Exemption from Permit System'
and for the following reasons:
Maintenance and Repair: Normal maintenance or repair of existing structures or developments, including damage by
accident, fire or elements.
Page 1 of 3
DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C
City of Renton Department of Community & Economic Development Certificate of Exemption from Shoreline Substantial Development
PSE Renton Memorial Stadium Natural Gas Service Replacement LUA18-000396, SME
The proposed development is:
Consistent with the policies of the Shoreline Management Act .
Consistent with the guidelines of the Department of Ecology where no Master Program has been finally approved or
adopted by the Department.
Consistent with the City of Renton Shoreline Master Program.
CONDITIONS:PLN - Administrative Decision Condition
1. The applicant shall secure the area of work with temporary fencing, label the
fence with warning signage, and cover the holes when the site is unattended. These
measures shall be kept in place until work is completed.
PLN - Administrative Decision Condition
2. The applicant shall clearly mark the lateral lines from the gas vault along the curb
prior to construction activities.
PLN - Administrative Decision Condition
3. All pervious areas impacted by the proposed work shall be replanted with ground
cover immediately following construction activities.
PLN - Administrative Decision Condition
4. The applicant shall not block or disturb the hard surface of the trail for this
project.
SIGNATURE & DATE OF DECISION:
DateJennifer Henning
RECONSIDERATION: Within 14 days of the decision date, any party of record may request that the decision be reopened
by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the
original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if
the approval body finds sufficient evidence to amend the original decision , there will be no further extension of the appeal
period. Any person wishing to take further action must file a formal appeal within the 14 day appeal time frame.
APPEALS: The administrative land use decision will become final if not appealed in writing together with the required fee
to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057 on or before 5:00 pm, on June 26,
2018 (RCW 43.21.C075(3); WAC 197-11-680). RMC 4-8-110 governs appeals to the Hearing Examiner and additional
information regarding the appeal process may be obtained from the Renton City Clerk's office, Renton City Hall, 7th Floor,
(425) 430-6510.
EXPIRATION: Two (2) years from the date of decision (date signed)
Page 2 of 3
DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C
6/12/2018 | 2:26 PM PDT
City of Renton Department of Community & Economic Development Certificate of Exemption from Shoreline Substantial Development
PSE Renton Memorial Stadium Natural Gas Service Replacement LUA18-000396, SME
Attachments:site plan, project narrative
Puget Sound Energy, Inc. - Ownercc:
Puget Sound Energy, Inc. Jessica Jackson - Contact
Page 3 of 3
DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C
1,128
94
WGS_1984_Web_Mercator_Auxiliary_Sphere
City of Renton Print map Template
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Notes
None
Legend
64 0 32 64 Feet
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
02/20/2018
Trails
Open Spaces
Parks
Environment Designations
Natural
Shoreline High Intensity
Shoreline Isolated High Intensity
Shoreline Residential
Urban Conservancy
Jurisdictions
Streams (Classified)
Type S
Type F
Type Np
Type Ns
EXHIBIT 1
Approx. 72'
OHWM
Existing 6" high
pressure gas main
is approximately 6'
west from existing
vault.
30'X2'X3' trench in
soft surface to
install new piping
going in and out of
new regulator
station.
New 4'X4'X2' vault
in soft surface
92'X2'X2' Trench in
hard surface to
install new piping
going to existing
meter set.
7'X5'X5'
Excavation in soft
surface to cut and
cap old station and
tie-in new gas
regulator station.
Existing Vault
DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C
1
Renton Memorial Stadium Natural Gas Service Replacement
Project Narrative for Shoreline Exemption
Project name, size, and location of site
PSE Renton Memorial Stadium Natural Gas Service Replacement
Work is located within the City’s Cedar River Trail and at the Renton Memorial Stadium
at 405 Logan Ave N (Parcel #s 182305HYDR and 0723059053).
Brief description of proposed work
Pugest Sound Energy (PSE) is proposing repair and maintenance activities on the existing
natural gas distribution service to the Renton Memorial Stadium. The existing pipes and
gas regulator station are at the end of their useful life and need to be replaced. All work
will be in grass and in the paved parking lot of the Stadium. PSE will not be blocking or
disturbing the hard surface of the Cedar River Trail for this project.
Basis for exemption request
The basis for the exemption request is that PSE will be performing repair and
maintenance work within 200 feet of the Cedar River OHWM. This work falls under
RMC 4-9-190C(3): Normal maintenance or repair of existing structures or developments,
including damage by accident, fire or elements. Replacement is the normal method of
repair for natural gas pipe distribution infrastructure, including pips and gas regulator
statations.
Anticipated dates of work
Summer 2018. The Renton Memorial Studium as requested PSE to do this work in the
less busy season of Summer, before the busy season of Autumn.
Other permits required for proposed project
None
Current and proposed use of the site
Natural Gas service to Renton Memorial Stadium
Special site features (i.e. wetlands, water bodies, steep slopes)
Cedar River
Statement addressing soil type and drainage conditions
According to USDA Web soil survey, 100% of the soil is Urban Land in the project area.
The parking lot of the stadium has existing drainage inlets and storm drain design.
EXHIBIT 2
DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C
2
Total estimated construction cost and estimated fair market value of the proposed
project
Estimated fair market value of project is $80,000
Estimated quantities and type of materials involoved if any fill or excavation is proposed
Total estimated quanity is less than 30 cubic yards:
Approximately 14 cubic yards of hard surface excavation – Fill material for hard surface
excavation includes sand and crushed rock
Approximatley 15 cubic yards of soft surface excavation – Fill material for soft surface
excavation includes sand, native soil, and top soil.
Number, type and size of any trees to be removed
No tree removal is proposed
Distance from closest area of work to the Ordinary High Water Mark of the shoreline
Approximatley 72 feet from the OHWM
Nature of existing shoreline (e.g high bank, naturalize, rip rap, bulkhead, etc.)
Shoreline High Intensity, natural vegetative slope, Cedar River Trail with grass, paved
parking lot
If the proposed project exceeds a height of 35-feet about the average grade level,
discuss the approximate location of and number of residential units, existing and
potential, that will have an obstructed view
No residential units or other regulated structures are included with this project. All
infrastructure regarding this project will be underground.