Loading...
HomeMy WebLinkAboutD_Decision_PSE Renton Memorial Stadium Shoreline Exemption_180612.pdfPLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT DATE: PROJECT NUMBER: PROJECT NAME: PROJECT MANAGER:Angelea Weihs, Assoicate Planner LUA18-000396, SME PSE Renton Memorial Stadium Natural Gas Service Replacement June 12, 2018 OWNER:Puget Sound Energy, Inc. PO Box 97034 M/S PSE-09N Bellevue, WA 98009-9734 CONTACT:Puget Sound Energy, Inc. Jessica Jackson PO Box 97034, PSE-09N Bellevue, WA 98009-9734 PROJECT LOCATION:405 LOGAN AVE N PROJECT DESCRIPTION:Puget Sound Energy (PSE) is requesting approval of a Shoreline Exemption and for proposed replacement and maintenance activities on the existing natural gas distribution service to the Renton Memorial Stadium, located at 405 Logan Ave N (Parcel #s 182305HYDR and 0723059053). Work will be located within the City’s Cedar River Trail and will be within Cedar River Regulated Shoreline Jurisdiction (Shoreline High Intensity; Cedar River Reach A). PSE states that the existing pipes and gas regulator station are at the end of their useful life and need to be replaced. All proposed work will be in grass and in the existing paved parking lot of the Stadium (See Exhibit 2). PSE will not be blocking or disturbing the hard surface of the Cedar River Trail for this project . Work is anticipated to begin during the summer of 2018, following Shoreline Exemption approval. No tree removal is proposed with this project. SEC-TWN-R: SE07 - 23 - 5 LEGAL DESCRIPTION: (King County Assessor)POR OF SE 1/4 OF SE 1/4 ELY OF CWW # 2 WLY OF WILLIAMS ST & S OF LN RNG S 89-18-45 W FR PT ON WLY MGN OF ST 995.34 FT SLY OF S LN OF 6TH AVE N & POR GL 1 SEC 18-23-5 LY ELY OF CWW # 2 & WLY OF WILLIAMS ST WATER BODY/REACH:Cedar River Reach A EXEMPTION JUSTIFICATION: An exemption from a Shoreline Management Substantial Development Permit is hereby Approved with Conditions* on the proposed project in accordance with RMC 4.9.190C 'Exemption from Permit System' and for the following reasons: Maintenance and Repair: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. Page 1 of 3 DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C City of Renton Department of Community & Economic Development Certificate of Exemption from Shoreline Substantial Development PSE Renton Memorial Stadium Natural Gas Service Replacement LUA18-000396, SME The proposed development is: Consistent with the policies of the Shoreline Management Act . Consistent with the guidelines of the Department of Ecology where no Master Program has been finally approved or adopted by the Department. Consistent with the City of Renton Shoreline Master Program. CONDITIONS:PLN - Administrative Decision Condition 1. The applicant shall secure the area of work with temporary fencing, label the fence with warning signage, and cover the holes when the site is unattended. These measures shall be kept in place until work is completed. PLN - Administrative Decision Condition 2. The applicant shall clearly mark the lateral lines from the gas vault along the curb prior to construction activities. PLN - Administrative Decision Condition 3. All pervious areas impacted by the proposed work shall be replanted with ground cover immediately following construction activities. PLN - Administrative Decision Condition 4. The applicant shall not block or disturb the hard surface of the trail for this project. SIGNATURE & DATE OF DECISION: DateJennifer Henning RECONSIDERATION: Within 14 days of the decision date, any party of record may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original decision , there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14 day appeal time frame. APPEALS: The administrative land use decision will become final if not appealed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057 on or before 5:00 pm, on June 26, 2018 (RCW 43.21.C075(3); WAC 197-11-680). RMC 4-8-110 governs appeals to the Hearing Examiner and additional information regarding the appeal process may be obtained from the Renton City Clerk's office, Renton City Hall, 7th Floor, (425) 430-6510. EXPIRATION: Two (2) years from the date of decision (date signed) Page 2 of 3 DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C 6/12/2018 | 2:26 PM PDT City of Renton Department of Community & Economic Development Certificate of Exemption from Shoreline Substantial Development PSE Renton Memorial Stadium Natural Gas Service Replacement LUA18-000396, SME Attachments:site plan, project narrative Puget Sound Energy, Inc. - Ownercc: Puget Sound Energy, Inc. Jessica Jackson - Contact Page 3 of 3 DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C 1,128 94 WGS_1984_Web_Mercator_Auxiliary_Sphere City of Renton Print map Template This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes None Legend 64 0 32 64 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov 02/20/2018 Trails Open Spaces Parks Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) Type S Type F Type Np Type Ns EXHIBIT 1 Approx. 72' OHWM Existing 6" high pressure gas main is approximately 6' west from existing vault. 30'X2'X3' trench in soft surface to install new piping going in and out of new regulator station. New 4'X4'X2' vault in soft surface 92'X2'X2' Trench in hard surface to install new piping going to existing meter set. 7'X5'X5' Excavation in soft surface to cut and cap old station and tie-in new gas regulator station. Existing Vault DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C 1 Renton Memorial Stadium Natural Gas Service Replacement Project Narrative for Shoreline Exemption Project name, size, and location of site PSE Renton Memorial Stadium Natural Gas Service Replacement Work is located within the City’s Cedar River Trail and at the Renton Memorial Stadium at 405 Logan Ave N (Parcel #s 182305HYDR and 0723059053). Brief description of proposed work Pugest Sound Energy (PSE) is proposing repair and maintenance activities on the existing natural gas distribution service to the Renton Memorial Stadium. The existing pipes and gas regulator station are at the end of their useful life and need to be replaced. All work will be in grass and in the paved parking lot of the Stadium. PSE will not be blocking or disturbing the hard surface of the Cedar River Trail for this project. Basis for exemption request The basis for the exemption request is that PSE will be performing repair and maintenance work within 200 feet of the Cedar River OHWM. This work falls under RMC 4-9-190C(3): Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. Replacement is the normal method of repair for natural gas pipe distribution infrastructure, including pips and gas regulator statations. Anticipated dates of work Summer 2018. The Renton Memorial Studium as requested PSE to do this work in the less busy season of Summer, before the busy season of Autumn. Other permits required for proposed project None Current and proposed use of the site Natural Gas service to Renton Memorial Stadium Special site features (i.e. wetlands, water bodies, steep slopes) Cedar River Statement addressing soil type and drainage conditions According to USDA Web soil survey, 100% of the soil is Urban Land in the project area. The parking lot of the stadium has existing drainage inlets and storm drain design. EXHIBIT 2 DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C 2 Total estimated construction cost and estimated fair market value of the proposed project Estimated fair market value of project is $80,000 Estimated quantities and type of materials involoved if any fill or excavation is proposed Total estimated quanity is less than 30 cubic yards: Approximately 14 cubic yards of hard surface excavation – Fill material for hard surface excavation includes sand and crushed rock Approximatley 15 cubic yards of soft surface excavation – Fill material for soft surface excavation includes sand, native soil, and top soil. Number, type and size of any trees to be removed No tree removal is proposed Distance from closest area of work to the Ordinary High Water Mark of the shoreline Approximatley 72 feet from the OHWM Nature of existing shoreline (e.g high bank, naturalize, rip rap, bulkhead, etc.) Shoreline High Intensity, natural vegetative slope, Cedar River Trail with grass, paved parking lot If the proposed project exceeds a height of 35-feet about the average grade level, discuss the approximate location of and number of residential units, existing and potential, that will have an obstructed view No residential units or other regulated structures are included with this project. All infrastructure regarding this project will be underground. DocuSign Envelope ID: 8D293B53-9F72-43E1-AAEF-4545788ECD9C