HomeMy WebLinkAboutPRE_Pre-Application_Meeting_Summary_170112_v1.pdfPRE -APPLICATION MEETING COMMENTS FOR
US BANK EXPANSION
PRE16-000978
CITY OF RENTON
Department of Community & Economic Development
Planning Division
January 12, 2017
Contact Information:
Planner: Angelea Weihs, 425-430-7312, aweihs@rentonwa.gov
Public Works Plan Reviewer: Justin Johnson, 425-430-7291, jtjohnson@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov
Building Department Reviewer: Craig Burnell, 425-430-7290
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
making all of the required copies.
The pre -application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
FIRE & EMERGENCY SERVICES D c"y°`"
DEPARTMENT
MEMORANDUM
DATE: January 12, 2017
TO: Angelea Weihs, Associate Planner
FROM: Corey Thomas, Plan Review/Inspector
SUBJECT: US Bank Expansion — PRE16-000978
1. Existing fire sprinkler system shall be extended into the building addition. Separate plans and permits
are required to be submitted to and obtained from the Renton Regional Fire Authority.
2. Proposed building addition is in direct conflict with the existing established fire lane apparatus access
roadway and a new fire lane roadway shall established around the proposed addition. Additional
existing parking lot and parking spaces will have to be relocated/eliminated in order to accommodate a
new fire lane. Fire lane width is required to be a minimum of 20 -feet wide and turning radius are 25 -
feet inside and 45 -feet outside. Fire lane signage required per city code.
3. Fire impact fee of $0.21 per square foot of additional space shall be charged at time of building
permit issuance.
4. Existing fire hydrant appears it will need to be relocated along with perhaps the fire department
connection and backflow vault for the fire sprinkler system. Backflow vault shall be protected from
vehicular traffic or replaced with a traffic rated vault.
CIT`/ OF
DEPARTMENT OF COMMUNITY — enton:��'
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: January 10, 2017
TO: Angelea Weihs, Planner
FROM: Justin Johnson, Civil Engineer II, Plan Review
SUBJECT: US Bank Expansion
14120 160`h Ave SE
PRE16000978
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision -makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above -referenced proposal located at parcel(s)
3023059103. The following comments are based on the pre -application submittal made to the City of
Renton by the applicant.
WATER
1. Water service is from the 196 zone, static pressure is about 76 psi at ground elevation of 16
feet. Existing 10 -inch loop around the building can deliver 2,700 gpm. Existing 12 -inch main in E
Valley Rd can deliver 5,000 gpm.
2. There is an existing 1.5 -inch domestic meter and a 1.5 -inch landscape meter.
3. The project will require the relocation of about 80 feet of 10 -inch water main around the
proposed building expansion.
4. Relocation of the existing fire sprinkler DDCVA vault and of an on-site hydrant to the new
planter islands is also required.
5. Will also need a partial release of the existing easement and the dedication of a new easement
for the relocated water line.
SEWER
1. Sewer service is provided by City of Renton.
2. There is an existing 8 -inch wastewater main located in East Valley Rd (see City plan no. S-
020006).
SURFACE WATER
Us Bank Expansion— PRE16000978
January 10, 2017
Page 2 of 3
1. There is an existing storm water system within the property.
2. A drainage report complying with the 2017 City of Renton Surface Water Manual and City
Amendments will be required. Based on the City's flow control map, the site falls within the
Peak Rate Flow Control Standard area matching Existing Site Conditions and is within the Black
River Drainage Basin.
3. A geotechnical report for the site may be required. Information on the water table and soil
permeability, with recommendations of appropriate flow control BMP options with typical
designs for the site from the geotechnical engineer, shall be submitted with the application.
4. Surface water system development fee is $0.641 per square foot with a minimum fee of
$1,608.00 for the new impervious surface. This is payable prior to issuance of the construction
permit.
5. Construction Storm water General Permit from the Department of Ecology is required if clearing
and grading of the site exceeds one acre.
TRANSPORTATION
1. East Valley Road is a collector arterial, per RMC 4-6-060 collector streets should have a
minimum ROW width of 94 feet with 41 feet wide paved width, 8 feet parking lane, 0.5 feet
wide curbs, 8 feet wide landscaped planters, and 8 feet wide sidewalks. Street lighting and
storm water improvements on the public street frontages are applicable. The street
improvements should meet the requirements of.RMC4-6-060 at a minimum.
2. Traffic impact study guidelines include that the threshold for the traffic study is 20 new pm peak
hour trips. The proposed addition may generate more than the 20 new pm peak hour trip
threshold. Provide a memo that includes the trip generation number and the trip assignment
and distribution at the site accesses. Staff will review the memo and will inform the applicant if
additional study is required.
3. If it is determined that the traffic is impacted from the proposed addition, a traffic impact fee
will be assessed at the time of building permit.
GENERAL COMMENTS
1. Adequate separation between utilities as well as other features shall be provided in accordance
with code requirements.
a. 7 -ft minimum horizontal and 1 -ft vertical separation between storm and other utilities is
required with the exception of water lines which require 10 -ft horizontal and 1.5 -ft
vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or
building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the
building.
2. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil
Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for
the most up-to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
3. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate
sheets.
Us Bank Expansion— PRE16000978
January 10, 2017
Page 3 of 3
4. All utility lines (i.e. electrical, phone, and cable services, etc.) serving the proposed development
must be underground. The construction of these franchise utilities must be inspected and
approved by a City of Renton inspector.
5. Fees quoted in this document reflect the fees applicable in the year 2017 only and will be
assessed based on the fee that is current at the time of the permit application or issuance, as
applicable to the permit type. Please visit www.rentonwa.gov for the current development fee
schedule.
DEPARTMENT OF COMMUNITY °F
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: January 12, 2017
TO: Pre -Application File No. 16-000978
FROM: Angelea Weihs, Associate Planner
SUBJECT: Us Bank Minor Expansion — 2500 East Valley Road
General: We have completed a preliminary review of the pre -application for the above -
referenced development proposal. The following comments on development and permitting
issues are based on the pre -application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision -makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other design
changes required by City staff or made by the applicant. The applicant is encouraged to review
all applicable sections of the Renton Municipal Code. The Development Regulations are
available for purchase for $50.00 plus tax from the Finance Division on the first floor of City Hall
or online at www.rentonwa.gov.
Project Proposal: The subject property consists of one parcel (APN 3023059103) located at 2500
E Valley Rd. The subject site is 3.07 acres (134,074 sf) and is zoned Commercial Arterial (CA). The
proposal is to add a 2,372 square foot addition to the north portion of the existing 28,065
square foot building. The building is currently used as administrative offices for US Bank. The
expansion would enlarge the building's footprint from 28,065 square feet to 30,437 square feet.
Existing access is gained via East Valley Road. The existing site contains approximately 172
parking stalls. The proposed development would include two enclosed truck bays, removal of 20
parking stalls, and a new landscape planter strips along the east and west sides of the building
expansion. A potential wetland is located offsite, near the east property line.
Current Use: Currently the site is used as administrative offices for US Bank.
Development Standards: The project would be subject to RMC 4-2-120A, "Development
Standards for Commercial Zoning Designations" effective at the time of complete application
(noted as "CA standards" herein).
Zoning: The property is located within the Employment Area (EA) land use designation and the
Commercial Arterial (CA) zoning designation. Offices, general is an allowed use in the CA zone.
The property is located within Urban Design District 'D, and therefore subject to additional
design elements. Proposals should have unique, identifiable design treatment in terms of
H:\CED\Planning\Current Planning\PREAPPS\2016 Preapps\PRE16-000978.Angelea\16-000978 (CA US
Bank Expansion).doc
Us Bank Minor Expansion
Page 2 of 6
January 12, 2017
landscaping, building design, signage and street furniture. Design elements are listed in RMC
4-3-100 for District 'D.'
Density: The minimum density permitted in the CA zoning designation is 10 units per net acre
and the maximum density is 60 units per net acre for buildings with mixed commercial and
residential use in the same building. Residential uses are not permitted in the Valley Community
Planning Area. Density is not applicable for the project, as there are no dwelling units
proposed.
Minimum Lot Size, Width and Depth: There are no minimum requirements for lot width or
depth within the CA zone. The minimum lot size in the CA zone is 5,000 square feet. The
proposal is not altering the overall lot size which is 134,074 square feet and complies with the
minimum standard for the zone.
Lot Coverage: The CA zone allows a maximum building coverage of 65 percent, or 75 percent if
parking is provided within a building or within an on-site parking garage. There is no maximum
impervious surface coverage for the zone. The applicant submitted a site plan with a 30,437
square feet building. The building coverage would be roughly 22.7 percent (22.7%) of the
134.074 square feet site which would comaly with the minimum lot covera_oe standard for the
zone.
Setbacks: Setbacks are the distance between the building and the property line or any private
access easement. Setback requirements in the CA zone are as follows: 15 feet minimum for the
front yard but may be reduced to zero feet through the Site Plan Review process provided blank
walls are not located within the reduced setback; a 20 -foot maximum front yard setback; a 10 -
foot (landscaped) minimum freeway frontage setback; and no rear or side yard setbacks unless
the property abuts a residential zoned property, where the setback along residentially zoned
properties is 15 feet. The proposed addition exceeds the maximum front yard setback allowed
by code.
Gross Floor Area: There are no minimum requirements for gross floor area within the CA zone.
Building Height: The maximum building height that would be allowed in the CA zone is 50 feet
and 60 feet for mixed use structures with a residential component. The submitted materials
identify a one-story structure. No information on the proposed or existing height of the
building was provided. Building height from grade would need to be identified on any building
permit or land use application materials.
Screening: Screening must be provided for all surface -mounted and roof top utility and
mechanical equipment. The site plan application will need to include elevations and details for
the proposed methods of screening. No mechanical or utility equipment was identified in the
submitted materials. See RMC 4-4-095 for specific requirements.
Refuse and Recycling Areas: Refuse and recycling areas need to meet the requirements of RMC
4-4-090, "Refuse and Recyclables Standards." In office, educational and institutional
developments, a minimum of two (2) square feet per every one thousand (1,000) square feet of
building gross floor area shall be provided for recyclables deposit areas and a minimum of four
(4) square feet per one thousand (1,000) square feet of building gross floor area shall be
provided for refuse deposit areas. A total minimum area of one hundred (100) square feet shall
be provided for recycling and refuse deposit areas. Outdoor refuse and recyclables deposit areas
and collection points shall not be located in any required setback or landscape areas. The
H:\CED\Planning\Current Plan ning\PREAPPS\2016 Preapps\PRE16-000978.Angelea\16-000978(CA US
Bank Expansion).doc
Us Bank Minor Expansion
Page 3 of 6
January 12, 2017
location of the proposed refuse and recyclable area appears to comply with code standards.
Enclosures for outdoor refuse or recyclables deposit areas/collection points and separate
buildings used primarily to contain a refuse or recyclables deposit area/collection point shall
have gate openings at least twelve feet (12') wide for haulers. No information on refuse and
recycling areas was provided. Refuse and recycling areas would need to be identified on any
building permit or land use application materials.
Landscaping: Compliance with landscaping standards is required for all new buildings or
remodels of a structure that requires improvement equal to or greater than 50% of the assessed
property valuation. All portions of the development area not covered by structures, required
parking, access, circulation or service areas, must be landscaped with native, drought -resistant
vegetative cover. The minimum onsite landscape width required along street frontages is 10
feet, except where reduced through the site plan development review process. All surface
parking lots shall have perimeter landscaping and interior parking lot landscaping meeting the
standards of RMC 4-4-070. Current landscaping on site does not appear to comply with the 10
foot landscape strip width requirement, nor does it include a mixture of trees, shrubs, and
ground cover per RMC 4-4-070H.1.
Significant Tree Retention: There appears to be several trees located on the site within the
landscaped areas. If significant trees (greater than 6 -inch caliper or 8 -caliper inches for alders
and cottonwoods) are proposed to be removed, a tree retention plan, arborist report, and tree
retention worksheet shall be provided with the formal land use application or building permit.
RMC 4-4-130H provides general and specific requirements. The tree retention plan must show
preservation of at least 10 percent (1096) of significant trees, and indicate how proposed parking
would be sited to accommodate preservation of significant trees that would be retained. The
Administrator may authorize the planting of replacement trees on the site, at a rate of six to
one, if it can be demonstrated to the Administrator's satisfaction that an insufficient number of
trees can be retained.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees
on slopes greater than twenty percent; Significant trees adjacent to critical areas and their
associated buffers; and Significant trees over sixty feet in height or greater than eighteen inches
caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; Other
significant native evergreen or deciduous trees; and Other significant non- native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods
are used as part of an approved enhancement project within a critical area or its buffer.
The Administrator may require independent review of any land use application that involves
tree removal and land clearing at the City's discretion.
Tree protection measures to be identified on the plan are outlined in RMC 4-4-130H.9 and
include protective fencing, protection from grade changes, and monitoring during construction
through the retention of a certified arborist or licensed landscape architect.
H:\CED\Planning\Current Planning\PREAPPS\2016 Preapps\PRE16-000978.Angelea\16-000978(CA US
Bank Expansion).doc
Us Bank Minor Expansion
Page 4 of 6
January 12, 2017
Fences or Retaining Walls: If the applicant intends to install any fences or retaining walls as part
of this project, the location must be designated on the landscape plan or grading plan
respectively. A fence and/or wall detail should also be included on the plan if proposed.
Parking: Parking for vehicles, loading areas, and driveways shall be provided in accordance
with the provisions of the current parking regulations of RMC 4-4-080, "Parking, Loading,
and Driveway Regulations." General office uses require a minimum of 2.0 per 1,000 square
feet of net floor area and a maximum of 4.5 parking spaces per 1,000 square feet of net
floor area.
The expansion would enlarge the building's footprint from 28,065 square feet to 30,437 square
feet. The existing site contains approximately 172 parking stalls. The proposed development
would include removal of 20 parking stalls. Currently the property exceeds the maximum
parking spaces permitted (126 parking spaces) for the use. The proposed addition and
elimination of 20 parking spaces increases the conformity with the parking regulations.
A vehicle parking analysis with the number of spaces existing, and proposed would need to be
provided as part of the land use or building permit application for review and approval by the
Dlnnninn flivicinn Drniurf Mnnnnar.
All non-residential development that exceeds 4,000 gross sf in size would also be required to
comply with the bicycle parking requirements. When there are two (2) or more separate uses
on a site, the required bicycle parking for the site shall be the sum of the required parking for
the individual uses. Modification of these minimum standards requires written approval from
the Department of Community and Economic Development. If required, bicycle parking would
be required based on 10% of the required number of parking stalls. The bicycle parking
provided for the proposed use shall be provided for secure extended use and shall protect the
entire bicycle and its components and accessories from theft and weather. Acceptable examples
include bike lockers, bike check-in systems, in -building parking, and limited access fenced areas
with weather protection. Spaces should follow the requirements of RMC 4-4-080F.11.
Access: Driveway widths are limited by the driveway standards, in RMC 4-40801. A connection
shall be provided for site -to -site vehicle access ways, where topographically feasible, to allow a
smooth flow of traffic across abutting CA parcels without the need to use a street. Access may
comprise the aisle between rows of parking stalls but is not allowed between a building and a
public street.
No changes to the existing driveway locations are proposed. Aerial photos indicate that site -
to -site vehicle access way to the north exists between the building and public street; however,
the back portion of the lot may be impacted by wetland buffers, which would prohibit site -to -
site access behind the existing structure. No site -to -site access to the south is shown.
Pedestrian Access: A pedestrian connection shall be provided from all public entrances to the
street, in order to provide direct, clear and separate pedestrian walks from sidewalks to building
entries and internally from buildings to abutting properties. Aerial photos and google street
view indicate that an existing pedestrian connection existing between the street and the
building entrance.
Signs: Signs are required to meet the minimum standards of RMC 4-4-100 "Sign Regulations"
and require sign permit review which is different than building permit review.
H:\CED\Planning\Current Planning\PREAPPS\2016 Preapps\PRE16-000978.Angelea\16-000978 (CA US
Bank Exoansion).doc
Us Bank Minor Expansion
Page 5 of 6
January 12, 2017
Lighting: If any addition or replacement of light fixtures is proposed, a detailed lighting plan and
analysis is required as part of the building permit submittal. The lighting plan shall meet the
lighting standards of the code (RMC 4-4-075).
Building Design Standards: If the cost of the alterations of a legal nonconforming structure
exceed an aggregate cost of fifty percent (50%) of the value of the structure, based upon its
most recent assessment or appraisal, compliance with Urban Design Regulations, District 'D"
is required for the entire structure. Exterior modifications such as facade changes, windows,
awnings, signage, etc., shall comply with the design requirements for the new portion of the
structure, regardless of value. A Design Checklist shall be completed and submitted as part of
the application materials. See the Renton Municipal Code section 4-3-100 for more details. The
following bullets are a few of the standards outlined in the regulations:
• A primary entrance of each building shall be located on the facade facing a street,
shall be prominent, visible from the street, connected by a walkway to the public
sidewalk, and include human-scale elements.
• Parking shall be located so that no surface parking is located between a building and
the front property line, or the building and side property line, on the street side of a
corner lot.
• Amenities such as outdoor group seating, benches, transit shelters, fountains, and
public art shall be provided.
• On any facade visible to the public, transparent windows and/or doors are required to
comprise at least 50% of the portion of the ground floor facade that is between 4 feet
and 8 feet above ground.
• Buildings shall use at least one of the following elements to create varied and
interesting roof profiles (see illustration, subsection RMC 4-3-10OI.S.f): extended
parapets; feature elements projecting above parapets; projected cornices; pitched or
sloped roofs.
• Buildings shall employ material variations such as colors, brick or metal banding,
patterns, or textural changes.
Design review would be completed during the formal land use or building permit review
process.
Critical Areas: Based on City of Renton Critical Areas Maps, a potential wetland is located
offsite, near the east property line. As such, a wetland reconnaissance shall be provided,
clarifying the presence of wetlands onsite or near the site. If wetlands are, determine to be
located on or near the subject site, a wetland assessment and delineation would also be
required.
The property is also located in a high seismic hazard, with sensitive slopes within 50 feet for the
property. Whenever a proposed development requires a development permit and a geologic
hazard, including sensitive slopes and seismic hazards, is present on the site of the proposed
development or on abutting or adjacent sites within fifty feet (50') of the subject site,
geotechnical studies by licensed professionals, such as a geotechnical engineer and/or
engineering geologist, shall be required.
H:\CED\Planning\Current Planning\PREAPPS\2016 Preapps\PRE16-000978.Angelea\16-000978 (CA US
Bank Expansion).doc
Us Bank Minor Expansion
Page 6 of 6
January 12, 2017
It is the applicant's responsibility to ascertain whether critical areas or environmental
concerns are present on the site during site development or building construction.
Environmental Review: SEPA Environmental Review would be required for the addition, unless
if is determined that a SEPA Addendum could be issued to the past Environmental (SEPA) review
that was completed in 1987, prior to the building's construction. Additional information would
be required for staff to determine if an Addendum could be issued and if the proposal would
have any new impacts beyond what was reviewed in 1987. It is assumed the existing conditions
have changed since 1987.
Permit Requirements: The proposal may require Environmental (SEPA) Review and a minor
modification to the Administrative Site Plan Approval if the existing site plan and the built
environment are similar. Otherwise a new site plan review application may be required. All
applications can be reviewed concurrently in an estimated time frame of 6-8 weeks once a
complete application is accepted. The Administrative Site Plan minor modification review
application fee is $250.00. The Administrative Site Plan review application fee is $2500. The
application fee for SEPA Review (Environmental Checklist) is $1,500. There is an additional 3%
technology fee at the time of land use application.
In addition to the required land use permits, separate construction, building and sign permits
would be required. The review of these permits may occur concurrently with the review of the
land use permits, but cannot be issued prior to the completion of any appeal periods.
Public Information Sign: If Administrative Site Plan Review and SEPA are required, the applicant
will be required to install a public information sign on the property. Detailed information
regarding the land use application submittal requirements is provided in the attached handouts.
Impact Mitigation Fees: In addition to the applicable building and construction fees, impact fees
would be required. Such fees would apply to all projects and would be calculated at the time of
building permit application and payable prior to building permit issuance. The 2017 fees are as
follows:
Fire Mitigation fee currently assessed at $0.21 per square foot of additional space.
Transportation Mitigation Fee assessed at $7.29 per square foot of additional space.
A handout listing Renton's development -related fees is available on the City of Renton website
for your review.
Note: When the formal application materials are complete, the applicant is strongly
encouraged to have one copy of the application materials pre-screened at the 6th floor front
counter prior to submitting the complete application package. Please call Angelea Weihs,
Associate Planner, at 425-430-7312 for an appointment.
Expiration: Upon site plan approval, the site plan approval is valid for two years with a possible
two-year extension.
H:\CED\Planning\Current Planning\PREAPPS\2016 Preapps\PRE16-000978.Angelea\16-000978 (CA US
Bank Expansion).doc
d(14k`�'"I M1LOlo311H4UW
3NO1S213N2iODffM
%
MIAMI
11
ILI 1• NO W, If W.
3Y}YiN
{Qpp( GI1'YYCWI BWii�iG 4Ltl0 I
SNOIlWA3l3 a01a3.LX3 9
rlYld a00'Ij rIW1a 311S 9llltt�s
��EB
Eby
dL
8
s
Y
i
MIAMI
11
ILI 1• NO W, If W.
3Y}YiN
{Qpp( GI1'YYCWI BWii�iG 4Ltl0 I
SNOIlWA3l3 a01a3.LX3 9
rlYld a00'Ij rIW1a 311S 9llltt�s
��EB