Loading...
HomeMy WebLinkAboutRS_Preliminary_TIR_Greystoke_LLC_180410_v2.pdf Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd., Cle Elum, WA 98922 Phone: (425) 392-0250 Fax: (425) 391-3055 Phone: (509) 674-7433 Fax: (509) 674-7419 www.EncompassES.net PRELIMINARY TECHNICAL INFORMATION REPORT for the 28Hundred Unit Lot Subdivision February 20, 2017 Revised January 21, 2018 Revised April 10, 2018 Encompass Engineering & Surveying Job No. 16663 Prepared For: Yves Tang Greystoke LLC 720 North 10th Street #A282 Renton, WA 98057 28Hundred Preliminary Technical Information Report April 10, 2018 Page i TABLE OF CONTENTS I. PROJECT OVERVIEW .......................................................................................................... 1 II. CONDITIONS AND REQUIREMENTS SUMMARY .......................................................... 3 III. OFF-SITE ANALYSIS ............................................................................................................ 5 IV. FLOW CONTROL, LOW IMPACT DESIGN (LID) AND WATER QUALITY FACILITY ANALYSIS AND DESIGN .................................................................................................... 8 VI. SPECIAL REPORTS AND STUDIES .................................................................................. 20 VII. OTHER PERMITS ................................................................................................................ 20 VIII. CSWPPP ANALYSIS AND DESIGN .................................................................................. 20 IX. BOND QUANTITIES, FACILITY SUMMARIES, & DECLARATION OF COVENANT 20 X. OPERATIONS AND MAINTENANCE MANUAL ............................................................ 20 Appendix A Infiltration Evaluation .............................................................................................. 21 28Hundred Preliminary Technical Information Report April 10, 2018 Page 1 I. PROJECT OVERVIEW Project: 28Hundred Unit Lot Subdivision Tax Parcel #: 722780-1690 & 722780-1695 Site Addresses: 2800 NE 12th St & 2801 NE 13th ST Zoning: R-14 Site Area: The project area is 0.66 Acres Site Location: The site is on the east side of Harrington Avenue NE between NE 12th Street and NE 13th Street Project Description: This project involves developing a 0.66-acre parcel into an 11-unit, Unit Lot Subdivision. Site Plan 28Hundred Preliminary Technical Information Report April 10, 2018 Page 2 Existing Adjacent Development: Existing development adjacent to the subject site includes the following: North – Single Family Residences and NE 13th Street East – Single Family Residences South – Single Family Residences & NE 12th Street West – McKnight Middle School & Harrington Avenue NE Pre-developed Site Conditions: The project site presently consists of two parcels totaling 0.66 acres with existing houses/garages with sidewalks and driveways—the remaining area is covered with sparse mature trees with lawn. The site generally slopes down from the north to south at approximately 1%. Critical Areas: No onsite critical areas. Soils: Per the SCS soil maps, the site is underlain with Arents, Alderwood, gravelly sandy loam (AmC) soil. Per Geotech report prepared for this project, “Infiltration Evaluation Proposed Harrington Glade Townhomes 2800 Northeast 12th Street Renton, Washington”, dated August 1, 2014, and prepared by Earth Solutions NW, the site is underlain with at least 8’ – 14’ of silty sand, infiltratable soil. The soil is suitable for infiltration BMPs. Post-developed Site Conditions: The proposal incorporates the construction of frontage improvements along NE 13th Street together with water/sewer/storm for an 11-unit Unit Lot Subdivision. The existing single-family residences will be removed. 28Hundred Preliminary Technical Information Report April 10, 2018 Page 3 Vicinity Map II. CONDITIONS AND REQUIREMENTS SUMMARY Core Requirement #1: Discharge at the Natural Location 28Hundred Preliminary Technical Information Report April 10, 2018 Page 4 The proposed on-site drainage patterns emulate those of the existing site conditions: infiltrating into the onsite soil, and running off to the south into the existing City storm system. A detention facility will provide flow control and water quality, outfalling into the City storm system. Infiltration for the building roofs will provide the required BMPs. Core Requirement #2: Off-site Analysis See Section III. Core Requirement #3: Flow Control Facilities Flow control will be provided for the development with a detention only stormwater vault. See Section IV for a conceptual design using WWHM2012. Core Requirement #4: Conveyance System Conveyance and capacity analysis of the new proposed system will be presented with the final drainage report. Core Requirement #5: Construction Stormwater Pollution Prevention A Construction Stormwater Pollution Prevention plan, which will serve to minimize soil erosion/sedimentation during the proposed site construction, will be prepared for the final engineering plans. Core Requirement #6: Maintenance & Operations The on-site storm water system will be maintained by the Unit Lot Subdivision HOA. Maintenance & operations documentation will be provided with the final drainage report. Core Requirement #7: Financial Guarantees & Liability The owner will arrange for any financial guarantees and liabilities required by the permit. Core Requirement #8: Water Quality Because there will be greater than 5,000 sq-ft of new PGIS, water quality measures will be provided with a Filterra biofiltration device w/presedimentation chamber and/or Vortechs hydrodynamic separator providing enhanced water quality treatment. Core Requirement #9: Flow Control BMPs Dispersion is not feasible because this site will be largely covered with buildings and driveway. Flow control BMPs will be provided with infiltration trenches for the building roofs. Special Requirement #1: Other Adopted Area-Specific Requirements None Special Requirement #2: Flood Hazard Area Delineation None Special Requirement #3: Flood Protection Facilities None Special Requirement #4: Source Control Source control is not required for this project. Special Requirement #5: Oil Control Oil control is not required for a residential subdivision, it doesn’t qualify as a high-use site. Special Requirement #5: Aquifer Protection Area This site is located in in Zone 2 of the Aquifer Protection Area. Because we are not proposing open stormwater facilities or ditches, this project meets the Zone 2 Aquifer 28Hundred Preliminary Technical Information Report April 10, 2018 Page 5 Protection Area restrictions/requirements. III. OFF-SITE ANALYSIS Location: Tax Parcel #: 722780-1690 & 722780-1695 Site Addresses: 2800 NE 12th St & 2801 NE 13th ST Site Location: The site is on the east side of Harrington Avenue NE between NE 12th Street and NE 13th Street Project Description: This project involves developing a 0.66-acre parcel into a 12-unit, Unit Lot Subdivision. The project site presently consists of two parcels totaling 0.66 acres with existing houses/garages with sidewalks and driveways—the remaining area is covered with several mature trees with lawn. The site generally slopes down from the north to south at approximately 1%. Soils: Per the SCS soil maps, the site is underlain with Arents, Alderwood, gravelly sandy loam (AmC) soil. Per Geotech report prepared for this project, “Infiltration Evaluation Proposed Harrington Glade Townhomes 2800 Northeast 12th Street Renton, Washington”, dated August 1, 2014, and prepared by Earth Solutions NW, the site is underlain with at least 8’ – 14’ of silty sand, infiltratable soil. Existing Upstream Drainage Little if any upstream areas drain to this site. Existing Downstream Drainage Any runoff from the site sheet flows southwest and enters into street gutter which drains into public storm drainage system—a CB at point (A) which is located in the intersection of NE 12th St and Harrington Ave NE. From there flow drains southwest through a 6-inch Conc. pipe into a CB type II- MH per survey field and per city of Renton (GIS) records at point (B). From point (B) flow also drains southwest through a 24-inch CMP pipe into another CB type II-MH at point (C). From there flow drains west along the NE 12th St through a 36 -inch pipe to another CB type II-MH at point (D) for a total of 120-feet downstream from the site. From point (D) flow continues west through a 36-inch pipe to another CB at point (E) per city of Renton records. Form there flow drains through a 36 -inch pipe to another CB type II-MH at point (F) for a total of approximately 470-feet down stream. From there flow drains through a 36-inch pipe to another CB type II-MH at point (G). From there flow drains through a pipe to another CB type II-MH at point (H) located on intersection of NE 12th St and Edmonds Ave NE for a total of approximately 800-feet from the site. From point (H) flow continues south along Edmonds Ave NE through an 18-inch pipe to another CB type II-MH at point (I). From there flow continues south through an 18 -inch pipe to another CB at point (J). From Point (J) flow drains through another 18-inch pipe to another CB at point (K) for a total of approximately 1100-feet downstream from the site. From there pipe continues south (L) to ¼ mile downstream from the site and enters into public storm drainage system along the NE Sunset Blvd. Eventually the runoff discharges into Lake Washington. There were no obvious downstream drainage problems. 28Hundred Preliminary Technical Information Report April 10, 2018 Page 6 Photo 1: Looking South from Harrington Ave NE/NE 13th St.—Subject property on the left Photo 2: Intersection of Harrington Ave NE & NE 12th St.—CB at point (A) 28Hundred Preliminary Technical Information Report April 10, 2018 Page 7 Photo 3: looking west from NE 12th St. towards intersection of Edmonds Ave NE 28Hundred Preliminary Technical Information Report April 10, 2018 Page 8 IV. FLOW CONTROL, LOW IMPACT DESIGN (LID) AND WATER QUALITY FACILITY ANALYSIS AND DESIGN Performance Standards The site was analyzed using the WWHM2012 software. A detention only vault, together with a Filterra biofiltration device w/presedimentation chamber and/or Vortechs hydrodynamic separator will provide the required flow control and enhanced water quality treatment. Existing Conditions A = Parcel Area = 28,694 sq-ft = 0.66 acres Ap = 0.66 acres (C soil woods) Ai = 0.0 acres (impervious) Developed Conditions A = 0.66 acres Ai-roof = 8,843 sq-ft = 0.20 acres (roofs) Ai-driveway= 6,585 sq-ft = 0.15 acres (driveway) Ai-sw = 2,366 sq-ft = 0.05 acres (on and offsite sidewalks) (0.40 acres impervious) Ap = 0.66 – 0.40 = 0.26 acres (C soil lawn) Vault Design Live Storage Depth = 9’ Using WWHM2012, required live storage volume = 8,944 cu-ft (see printout below) A vault with inside dimensions of 10.1’ X 100’ with a live storage depth of 9’ will provide the required volume. WWHM2012 PROJECT REPORT ___________________________________________________________________ Project Name: 28Hundred Site Name: 28Hundred Site Address: 2800 NE 12th St 28Hundred Preliminary Technical Information Report April 10, 2018 Page 9 City : Renton Report Date: 2/23/2018 Gage : Seatac Data Start : 1948/10/01 Data End : 2009/09/30 (adjusted) Precip Scale: 0.00 Version Date: 2016/02/25 Version : 4.2.12 ___________________________________________________________________ Low Flow Threshold for POC 1 : 50 Percent of the 2 Year ___________________________________________________________________ High Flow Threshold for POC 1: 50 year ___________________________________________________________________ PREDEVELOPED LAND USE Name : Basin 1 Bypass: No GroundWater: No Pervious Land Use acre C, Forest, Mod .66 Pervious Total 0.66 Impervious Land Use acre Impervious Total 0 Basin Total 0.66 ___________________________________________________________________ Element Flows To: Surface Interflow Groundwater ___________________________________________________________________ MITIGATED LAND USE Name : Basin 1 Bypass: No GroundWater: No Pervious Land Use acre C, Lawn, Mod .26 Pervious Total 0.26 Impervious Land Use acre ROOF TOPS FLAT 0.2 28Hundred Preliminary Technical Information Report April 10, 2018 Page 10 DRIVEWAYS FLAT 0.15 SIDEWALKS FLAT 0.05 Impervious Total 0.4 Basin Total 0.66 ___________________________________________________________________ Element Flows To: Surface Interflow Groundwater Vault 1 Vault 1 ___________________________________________________________________ Name : Vault 1 Width : 9.9681275598235 ft. Length : 99.681275598235 ft. Depth: 10 ft. Discharge Structure Riser Height: 9 ft. Riser Diameter: 18 in. Orifice 1 Diameter: 0.4 in. Elevation: 0 ft. Orifice 2 Diameter: 0.65 in. Elevation: 5.913 ft. Orifice 3 Diameter: 0.39 in. Elevation: 6.66 ft. Element Flows To: Outlet 1 Outlet 2 ___________________________________________________________________ Vault Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.022 0.000 0.000 0.000 0.1111 0.022 0.002 0.001 0.000 0.2222 0.022 0.005 0.002 0.000 0.3333 0.022 0.007 0.002 0.000 0.4444 0.022 0.010 0.002 0.000 0.5556 0.022 0.012 0.003 0.000 0.6667 0.022 0.015 0.003 0.000 0.7778 0.022 0.017 0.003 0.000 0.8889 0.022 0.020 0.004 0.000 1.0000 0.022 0.022 0.004 0.000 1.1111 0.022 0.025 0.004 0.000 1.2222 0.022 0.027 0.004 0.000 1.3333 0.022 0.030 0.005 0.000 1.4444 0.022 0.032 0.005 0.000 1.5556 0.022 0.035 0.005 0.000 1.6667 0.022 0.038 0.005 0.000 1.7778 0.022 0.040 0.005 0.000 1.8889 0.022 0.043 0.006 0.000 2.0000 0.022 0.045 0.006 0.000 2.1111 0.022 0.048 0.006 0.000 2.2222 0.022 0.050 0.006 0.000 28Hundred Preliminary Technical Information Report April 10, 2018 Page 11 2.3333 0.022 0.053 0.006 0.000 2.4444 0.022 0.055 0.006 0.000 2.5556 0.022 0.058 0.006 0.000 2.6667 0.022 0.060 0.007 0.000 2.7778 0.022 0.063 0.007 0.000 2.8889 0.022 0.065 0.007 0.000 3.0000 0.022 0.068 0.007 0.000 3.1111 0.022 0.071 0.007 0.000 3.2222 0.022 0.073 0.007 0.000 3.3333 0.022 0.076 0.007 0.000 3.4444 0.022 0.078 0.008 0.000 3.5556 0.022 0.081 0.008 0.000 3.6667 0.022 0.083 0.008 0.000 3.7778 0.022 0.086 0.008 0.000 3.8889 0.022 0.088 0.008 0.000 4.0000 0.022 0.091 0.008 0.000 4.1111 0.022 0.093 0.008 0.000 4.2222 0.022 0.096 0.008 0.000 4.3333 0.022 0.098 0.009 0.000 4.4444 0.022 0.101 0.009 0.000 4.5556 0.022 0.103 0.009 0.000 4.6667 0.022 0.106 0.009 0.000 4.7778 0.022 0.109 0.009 0.000 4.8889 0.022 0.111 0.009 0.000 5.0000 0.022 0.114 0.009 0.000 5.1111 0.022 0.116 0.009 0.000 5.2222 0.022 0.119 0.009 0.000 5.3333 0.022 0.121 0.010 0.000 5.4444 0.022 0.124 0.010 0.000 5.5556 0.022 0.126 0.010 0.000 5.6667 0.022 0.129 0.010 0.000 5.7778 0.022 0.131 0.010 0.000 5.8889 0.022 0.134 0.010 0.000 6.0000 0.022 0.136 0.014 0.000 6.1111 0.022 0.139 0.015 0.000 6.2222 0.022 0.141 0.017 0.000 6.3333 0.022 0.144 0.018 0.000 6.4444 0.022 0.147 0.019 0.000 6.5556 0.022 0.149 0.020 0.000 6.6667 0.022 0.152 0.021 0.000 6.7778 0.022 0.154 0.023 0.000 6.8889 0.022 0.157 0.024 0.000 7.0000 0.022 0.159 0.025 0.000 7.1111 0.022 0.162 0.026 0.000 7.2222 0.022 0.164 0.027 0.000 7.3333 0.022 0.167 0.028 0.000 7.4444 0.022 0.169 0.029 0.000 7.5556 0.022 0.172 0.030 0.000 7.6667 0.022 0.174 0.031 0.000 7.7778 0.022 0.177 0.032 0.000 7.8889 0.022 0.180 0.032 0.000 8.0000 0.022 0.182 0.033 0.000 8.1111 0.022 0.185 0.034 0.000 8.2222 0.022 0.187 0.035 0.000 8.3333 0.022 0.190 0.035 0.000 8.4444 0.022 0.192 0.036 0.000 8.5556 0.022 0.195 0.037 0.000 28Hundred Preliminary Technical Information Report April 10, 2018 Page 12 8.6667 0.022 0.197 0.037 0.000 8.7778 0.022 0.200 0.038 0.000 8.8889 0.022 0.202 0.038 0.000 9.0000 0.022 0.205 0.039 0.000 9.1111 0.022 0.207 0.627 0.000 9.2222 0.022 0.210 1.677 0.000 9.3333 0.022 0.212 2.923 0.000 9.4444 0.022 0.215 4.145 0.000 9.5556 0.022 0.218 5.139 0.000 9.6667 0.022 0.220 5.797 0.000 9.7778 0.022 0.223 6.293 0.000 9.8889 0.022 0.225 6.725 0.000 10.000 0.022 0.228 7.131 0.000 10.111 0.022 0.230 7.515 0.000 10.222 0.000 0.000 7.880 0.000 ___________________________________________________________________ ___________________________________________________________________ ANALYSIS RESULTS Stream Protection Duration ___________________________________________________________________ Predeveloped Landuse Totals for POC #1 Total Pervious Area:0.66 Total Impervious Area:0 ___________________________________________________________________ Mitigated Landuse Totals for POC #1 Total Pervious Area:0.26 Total Impervious Area:0.4 ___________________________________________________________________ Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.019652 5 year 0.032201 10 year 0.04027 25 year 0.049868 50 year 0.056517 100 year 0.062727 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.011939 5 year 0.019584 10 year 0.026204 25 year 0.03667 50 year 0.046218 100 year 0.05747 ___________________________________________________________________ Stream Protection Duration Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 28Hundred Preliminary Technical Information Report April 10, 2018 Page 13 1949 0.023 0.008 1950 0.027 0.010 1951 0.043 0.034 1952 0.013 0.008 1953 0.011 0.010 1954 0.017 0.009 1955 0.027 0.009 1956 0.022 0.020 1957 0.017 0.009 1958 0.019 0.010 1959 0.017 0.008 1960 0.030 0.029 1961 0.016 0.011 1962 0.010 0.007 1963 0.014 0.010 1964 0.020 0.010 1965 0.013 0.018 1966 0.013 0.009 1967 0.030 0.010 1968 0.017 0.009 1969 0.017 0.009 1970 0.013 0.010 1971 0.015 0.010 1972 0.033 0.029 1973 0.014 0.017 1974 0.016 0.010 1975 0.022 0.009 1976 0.016 0.009 1977 0.002 0.008 1978 0.013 0.010 1979 0.008 0.007 1980 0.038 0.030 1981 0.012 0.009 1982 0.025 0.020 1983 0.021 0.010 1984 0.013 0.008 1985 0.008 0.008 1986 0.034 0.010 1987 0.030 0.025 1988 0.012 0.008 1989 0.008 0.008 1990 0.071 0.030 1991 0.038 0.026 1992 0.015 0.010 1993 0.015 0.008 1994 0.005 0.007 1995 0.022 0.010 1996 0.050 0.034 1997 0.038 0.033 1998 0.009 0.008 1999 0.042 0.027 2000 0.015 0.010 2001 0.003 0.006 2002 0.017 0.015 2003 0.026 0.009 2004 0.028 0.032 2005 0.021 0.009 28Hundred Preliminary Technical Information Report April 10, 2018 Page 14 2006 0.023 0.019 2007 0.054 0.061 2008 0.066 0.032 2009 0.031 0.016 ___________________________________________________________________ Stream Protection Duration Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.0712 0.0613 2 0.0656 0.0342 3 0.0538 0.0335 4 0.0498 0.0327 5 0.0429 0.0324 6 0.0422 0.0322 7 0.0385 0.0301 8 0.0384 0.0300 9 0.0377 0.0292 10 0.0337 0.0285 11 0.0326 0.0271 12 0.0306 0.0256 13 0.0302 0.0250 14 0.0297 0.0205 15 0.0296 0.0198 16 0.0277 0.0194 17 0.0268 0.0176 18 0.0267 0.0168 19 0.0259 0.0162 20 0.0249 0.0153 21 0.0231 0.0105 22 0.0226 0.0105 23 0.0223 0.0104 24 0.0216 0.0103 25 0.0215 0.0102 26 0.0213 0.0101 27 0.0206 0.0101 28 0.0197 0.0100 29 0.0193 0.0100 30 0.0174 0.0098 31 0.0174 0.0097 32 0.0170 0.0097 33 0.0167 0.0097 34 0.0165 0.0096 35 0.0165 0.0096 36 0.0163 0.0095 37 0.0160 0.0094 38 0.0159 0.0093 39 0.0154 0.0093 40 0.0150 0.0093 41 0.0150 0.0092 42 0.0150 0.0092 43 0.0144 0.0091 44 0.0139 0.0090 45 0.0135 0.0090 46 0.0135 0.0089 47 0.0133 0.0087 48 0.0131 0.0084 28Hundred Preliminary Technical Information Report April 10, 2018 Page 15 49 0.0128 0.0084 50 0.0126 0.0084 51 0.0120 0.0081 52 0.0117 0.0080 53 0.0109 0.0078 54 0.0101 0.0077 55 0.0094 0.0077 56 0.0081 0.0076 57 0.0078 0.0075 58 0.0076 0.0075 59 0.0051 0.0070 60 0.0027 0.0068 61 0.0023 0.0063 ___________________________________________________________________ Stream Protection Duration POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.0098 17075 14040 82 Pass 0.0103 15505 8671 55 Pass 0.0108 14093 5747 40 Pass 0.0112 12797 5531 43 Pass 0.0117 11569 5366 46 Pass 0.0122 10523 5193 49 Pass 0.0127 9574 5007 52 Pass 0.0131 8763 4836 55 Pass 0.0136 8051 4701 58 Pass 0.0141 7347 4569 62 Pass 0.0145 6733 4378 65 Pass 0.0150 6192 4173 67 Pass 0.0155 5730 3983 69 Pass 0.0160 5313 3826 72 Pass 0.0164 4926 3632 73 Pass 0.0169 4569 3382 74 Pass 0.0174 4235 3200 75 Pass 0.0178 3951 3061 77 Pass 0.0183 3645 2909 79 Pass 0.0188 3390 2719 80 Pass 0.0193 3133 2537 80 Pass 0.0197 2915 2351 80 Pass 0.0202 2706 2205 81 Pass 0.0207 2490 2079 83 Pass 0.0211 2314 1953 84 Pass 0.0216 2136 1849 86 Pass 0.0221 1973 1768 89 Pass 0.0226 1827 1704 93 Pass 0.0230 1702 1636 96 Pass 0.0235 1577 1573 99 Pass 0.0240 1443 1493 103 Pass 0.0244 1325 1411 106 Pass 0.0249 1233 1320 107 Pass 0.0254 1148 1219 106 Pass 0.0259 1083 1140 105 Pass 28Hundred Preliminary Technical Information Report April 10, 2018 Page 16 0.0263 1020 1070 104 Pass 0.0268 947 1012 106 Pass 0.0273 887 930 104 Pass 0.0277 825 872 105 Pass 0.0282 761 804 105 Pass 0.0287 725 722 99 Pass 0.0292 674 636 94 Pass 0.0296 623 561 90 Pass 0.0301 589 463 78 Pass 0.0306 549 424 77 Pass 0.0310 506 362 71 Pass 0.0315 469 308 65 Pass 0.0320 427 249 58 Pass 0.0325 388 196 50 Pass 0.0329 356 172 48 Pass 0.0334 328 151 46 Pass 0.0339 298 132 44 Pass 0.0344 270 116 42 Pass 0.0348 241 112 46 Pass 0.0353 218 107 49 Pass 0.0358 198 102 51 Pass 0.0362 174 87 50 Pass 0.0367 152 77 50 Pass 0.0372 130 64 49 Pass 0.0377 119 55 46 Pass 0.0381 104 47 45 Pass 0.0386 95 38 40 Pass 0.0391 83 32 38 Pass 0.0395 74 12 16 Pass 0.0400 69 12 17 Pass 0.0405 61 12 19 Pass 0.0410 53 12 22 Pass 0.0414 46 12 26 Pass 0.0419 39 11 28 Pass 0.0424 29 11 37 Pass 0.0428 25 10 40 Pass 0.0433 22 8 36 Pass 0.0438 20 8 40 Pass 0.0443 17 8 47 Pass 0.0447 14 8 57 Pass 0.0452 12 6 50 Pass 0.0457 8 6 75 Pass 0.0461 7 6 85 Pass 0.0466 7 6 85 Pass 0.0471 7 6 85 Pass 0.0476 6 6 100 Pass 0.0480 6 6 100 Pass 0.0485 6 5 83 Pass 0.0490 6 5 83 Pass 0.0494 6 5 83 Pass 0.0499 5 5 100 Pass 0.0504 5 5 100 Pass 0.0509 5 4 80 Pass 0.0513 5 4 80 Pass 0.0518 5 4 80 Pass 0.0523 5 3 60 Pass 0.0527 5 3 60 Pass 28Hundred Preliminary Technical Information Report April 10, 2018 Page 17 0.0532 4 3 75 Pass 0.0537 4 3 75 Pass 0.0542 3 3 100 Pass 0.0546 3 2 66 Pass 0.0551 3 2 66 Pass 0.0556 3 2 66 Pass 0.0560 3 1 33 Pass 0.0565 3 1 33 Pass _____________________________________________________ 28Hundred Preliminary Technical Information Report April 10, 2018 Page 18 Existing Conditions Map 28Hundred Preliminary Technical Information Report April 10, 2018 Page 19 Developed Conditions Map 28Hundred Preliminary Technical Information Report April 10, 2018 Page 20 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN Conveyance calculations will be provided as part of the final engineering documents. VI. SPECIAL REPORTS AND STUDIES “Infiltration Evaluation Proposed Harrington Glade Townhomes 2800 Northeast 12th Street Renton, Washington”, dated August 1, 2014, and prepared by Earth Solutions NW . See Appendix A. VII. OTHER PERMITS N/A VIII. CSWPPP ANALYSIS AND DESIGN This Stormwater Pollution Prevention Plan (SWPPP)/TESC will be prepared as part permit requirements for this project in City of SeaTac, Washington during final engineering. IX. BOND QUANTITIES, FACILITY SUMMARIES, & DECLARATION OF COVENANT The documents will be prepared and submitted as part of the final engineering documents. X. OPERATIONS AND MAINTENANCE MANUAL Operation and maintenance of the site and all proposed stormwater facilities on this project will be required after the construction completion and throughout the life of this development. Details will be provided during final engineering. 28Hundred Preliminary Technical Information Report April 10, 2018 Page 21 Appendix A Infiltration Evaluation Infiltration Evaluation Proposed Harrington Glade Townhomes 2800 Northeast 12th Street Renton, Washington