Loading...
HomeMy WebLinkAboutAdmin Report C0 0 As IIMIR EXECUTIVE DEPARTMENT ' N-ro� MEMORANDUM DATE: February 26, 2018 TO: Ed Prince, Council President Members of Renton City Council FROM: Denis Law, Mayor Jay Covington, Chief Administrative Officer SUBJECT: Administrative Report • Thursday, March 1, 2018, Highlands Reservoir Project Open House: Join us for an open house meeting to learn more about the upcoming Highlands Reservoir Project from 5:30 to 7:00 p.m. at the Renton Highlands Library, 2801 NE 10th Street. The city is moving forward with the final design and construction of a new, above-ground potable water storage tank at their existing reservoir site located at 3410 NE 12th Street, as well as associated transmission and distribution piping improvements. Construction is anticipated to begin in 2019. Please attend this open house to learn more about the project's design and schedule, ask questions, and provide feedback. Unable to attend? Please direct your questions and comments to Water Utility Engineering Manager Abdoul Gafour at 425-430-7210 or via e-mail at agafour@rentonwa.gov. • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/trafficimpacts. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations: ✓ Monday, February 26th through Friday, March 2nd, 9:00 a.m.to 3:00 p.m. Utility maintenance crews will be conducting preventative sewer line maintenance along NE 4th Street between Rosario Avenue NE and Jefferson Avenue NE. Questions may be directed to Wastewater Maintenance Lead Rocky Sittner at 425-902-2004. ✓ Monday, February 26th through Friday, March 2nd, 7:00 a.m.to 3:30 p.m. Additional truck traffic and hauling will occur in the vicinity of Valley Medical Hospital related to the construction of the new Medical Office Building. Questions may be directed to Tom Main at 206-999-1833. ✓ Monday, February 26th through Friday, March 2nd, 9:00 a.m.to 3:00 p.m. Single lane closure along northbound Talbot Road South between the Ed Prince,Council President Members of Renton City Council Page 2 of 2 February 26,2018 northbound 1-405 on-ramp and the southbound 1-405 off-ramp for the 1-405 Direct Connector Project. Questions may be directed to Rohini Nair at 206-999- 1822. ✓ Monday, February 26th through Friday, March 2nd, 4:30 a.m.to 12:00 p.m. Single lane closure along northbound Talbot Road South between the southbound 1-405 on-ramp and the southbound 1-405 off-ramp for the 1-405 Direct Connector Project. Questions may be directed to Rohini Nair at 206-999- 1822. ✓ Monday, February 26th through Friday, March 2nd, 9:00 a.m.to 2:30 p.m. Expect intermittent lane closures and traffic delays along Talbot Road South (SR 515) related to the 1-405/SR 167 Interchange Direct Connector Project. In addition, northbound and southbound nighttime lane restrictions and closures along SR 167 and 1-405 are also scheduled this week related to the project. Questions may be directed to Craig Smiley, WSDOT I-405/SR 167 Corridor Communications, at 425-456-8624, or visit the project website at http://www.wsdot.wa.gov/Projects/I405/SR167ICDirectConnector. ✓ Monday, February 26th through August 2018, 8:30 a.m.to 4:45 p.m. Additional construction traffic due to the construction of Sartori Elementary School at the 300 block of Park Avenue North and Garden Avenue North. Questions may be directed to Patrick DeCaro at 425-207-6013. ✓ Monday, February 26th through December 2018. Road Closure on South 14th Street between Smithers Avenue South and Davis Avenue South for utility construction. Questions may be directed to Patrick DeCaro at 425-207-6013. ✓ Monday, February 26th through October 2019. Construction for the Renton Hill Utility project has commenced and is expected to last 20 months, with anticipated completion in May 2019. Following completion of the utility project, an overlay of affected surface streets will be conducted as part of the 2019 overlay project. The overlay is scheduled to be completed prior to October 31, 2019.