Loading...
HomeMy WebLinkAboutAdmin Report EXECUTIVE DEPARTMENT    M   E   M   O   R   A   N   D   U   M       DATE: May 7, 2018    TO: Ed Prince, Council President  Members of Renton City Council     FROM: Denis Law, Mayor  Robert Harrison, Chief Administrative Officer     SUBJECT: Administrative Report        The Solid Waste Utility is launching the “Bring Your Own Bag (BYOB)” campaign in  efforts to reduce plastic bag use and litter throughout the city.  The public is  encouraged to bring reusable bags when shopping and complete an online survey  about plastic bag use.  The survey is available at rentonwa.gov/plasticbag through  June 6th.  Questions may be directed to Solid Waste Senior Program Specialist Jina  Kim at Jkim@rentonwa.gov or by calling 425‐430‐7391.     The Renton History Museum has received an award from the Association of King  County Heritage Organizations (AKCHO), along with a team of four University of  Washington Museology graduate students, for the exhibit ‘A History of Renton in 75  Objects.’  The award honors collaborations between students and museums that  result in projects that benefit the King County Community.  ‘A History of Renton in  75 Objects’ was curated and installed by the UW Museology students who used  unique artifacts and photos from the Museum's collection to help the visitor  visualize Renton's history.     Information about preventative street maintenance, traffic impact projects, and  road closures happening this week can be found at  http://rentonwa.gov/trafficimpacts.  Preventative street maintenance, traffic impact  projects, and road closures will be at the following locations:     Monday, May 7th through Friday, May 11th, 7:00 a.m. to 3:30 p.m.  Additional  truck traffic and hauling will occur in the vicinity of Valley Medical Hospital  related to the construction of the new Medical Office Building.  Questions may  be directed to Tom Main at 206‐999‐1833.     Monday, May 7th through Friday, May 11th, 8:30 a.m. to 4:45 p.m.  North 4th  Street will be reduced to two lanes between Garden Avenue North and Park  Avenue North due to the construction of curbs and gutters for the new Sartori  Ed Prince, Council President  Members of Renton City Council  Page 2 of 2  May 7, 2018      Elementary School.  In addition, one to two eastbound lanes of North 3rd Street  between North Park and North Garden Avenues will be closed for construction  of curbs and gutters for Sartori Elementary. Questions may be directed to  Patrick DeCaro at 425‐207‐6013.     Monday, May 7th through Friday, May 11th, 8:30 a.m. to 3:00 p.m.  Single lane  closure on East Valley Road between SW 19th Street and Maple Avenue SW for  the I‐405 Direct Connector Project.  Questions may be directed to Justin Johnson  at 425‐430‐7291.     Monday, May 7th through Friday, May 11th, 9:00 a.m. to 3:00 p.m. Single lane  closure along northbound Talbot Road South between the northbound I‐405 on‐ ramp and the southbound I‐405 off‐ramp for the I‐405 Direct Connector Project.   Questions may be directed to Justin Johnson at 425‐430‐7291.     Monday, May 7th through Friday, May 11th, 4:30 a.m. to 12:00 p.m. Single lane  closure along the southbound Talbot Road South ramp to northbound I‐405 for  the I‐405 Direct Connector Project.  Questions may be directed to Justin Johnson  at 425‐430‐7291.     Monday, May 7th through Friday, May 11th, 9:00 a.m. to 2:30 p.m.  Expect  intermittent lane closures and traffic delays along Talbot Road South (SR 515)  related to the I‐405/SR 167 Interchange Direct Connector Project.  In addition, northbound and southbound nighttime lane restrictions and closures  along SR 167 and I‐405 are also scheduled this week related to the project.   Questions may be directed to Craig Smiley, WSDOT I‐405/SR 167 Corridor  Communications, at 425‐456‐8624, or visit the project website at  http://www.wsdot.wa.gov/Projects/I405/SR167ICDirectConnector.         Monday, May 7th through December 2018.  Road closure on South 14th Street  between Smithers Avenue South and Davis Avenue South for utility construction.   Questions may be directed to Patrick DeCaro at 425‐207‐6013.     Monday, May 7th through October 2019.  The Renton Hill Utility Replacement  Project has commenced with anticipated completion in May 2019.  Following  completion of the utility project, an overlay of the affected surface streets will be  conducted as part of the 2019 overlay project.  The overlay is scheduled to be  completed prior to October 31, 2019.