Loading...
HomeMy WebLinkAboutD_The Pines_LUA18-000063_FP_180711.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Administrative Report LUA18-000063 A. ADMINISTRATIVE DECISION DECISION: APPROVED DENIED REPORT DATE: July 11, 2018 Project Name: The Pines Final Plat Project File Number: PR16000372 Land Use File Number: LUA18-000063 Project Manager: Ann Fowler Project Summary: A 14-lot residential plat with 3 tracts that was given preliminary plat approval under The Pines preliminary plat LUA17-000801. Project Location: 850 Monroe Ave NE; Parcel Number 0923059116 and 0923059117 B. EXHIBITS: Exhibit 1: Final Plat Plan Exhibit 2: Compliance with Preliminary Plat Conditions Summary C. FINDINGS OF FACT (FOF): 1. Conformance with Preliminary Plat: Compliance Conformance with Preliminary Plat  The final plat shall: 1. Conform with only minor modifications to the preliminary plat. 2. The lot configuration and number of lots remain unchanged from the approved preliminary plat. 3. The lots meet development standards of the Zoning Code. 4. Conditions of approval have been met as identified in Exhibit 2. D. DECISION: The Pines Final Plat, File No. LUA18-000063 FP, as depicted in Exhibit 1, is approved. 1. All plat improvements shall be either constructed or deferred with adequate security to the satisfaction of City staff prior to the recording of the final plat. Signature and Date C.E. ‘Chip’ Vincent, Community and Economic Development Administrator DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49 7/11/2018 | 11:08 AM PDT City of Renton Department of Community & Economic Development Administrative Report & Decision THE PINES LUA18-000063 July 11, 2018 Page 2 of 2 Administrative Report LUA18-000063 TRANSMITTED this 11th day of July, 2018 to the Owner/Applicant/Contact: Owner: Applicant: Contact: Harbour Homes, LLC 4000 North 34th Street, Suite 300 Seattle, WA 98103 Harbour Homes, LLC 4000 North 34th Street, Suite 300 Seattle, WA 98103 Jamie Waltier, Harbour Homes 400 N 34th Street, Suite 300 Seattle, WA 98103 TRANSMITTED this 11th day of July, 2018 to the following: Jennifer Henning, Planning Director Brianne Bannwarth, Development Engineering Manager Amanda Askren, Property and Technical Services Manager Vanessa Dolbee, Current Planning Manager Craig Burnell, Building Official Fire Marshal E. LAND USE ACTION APPEALS, REQUEST FOR RECONSIDERATION, & EXPIRATION: The administrative land use decision will become final if the decision is not appealed within 14 days of the decision date. APPEAL: This administrative land use decision will become final if not appealed in writing to the City Council on or before 5:00 PM on July 25, 2018. An appeal of the decision must be filed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680), together with the required fee to the City Council, City of Renton, 1055 South Grady Way, Renton, WA 98057. RMC 4-8-110.F governs appeals to the City Council and additional information regarding the appeal process may be obtained from the City Clerk’s Office, (425) 430- 6510. EXPIRATION: The administrative final plat decision will expire six (6) months from the date of decision. A single one (1) year extension may be requested pursuant to RMC 4-7-110.F. To revitalize the expired plat, the plat shall be resubmitted as a preliminary plat. One extension to the six (6) month period may be granted by the Administrator. RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14-day appeal time frame. THE APPEARANCE OF FAIRNESS DOCTRINE: provides that no ex parte (private one-on-one) communications may occur concerning the land use decision. The Doctrine applies not only to the initial decision, but to Appeals to the Hearing Examiner as well. All communications after the decision/approval date must be made in writing through the Hearing Examiner. All communications are public record and this permits all interested parties to know the contents of the communication and would allow them to openly rebut the evidence in writing. Any violation of this doctrine could result in the invalidation of the appeal by the Court. DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49 DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49 ’ ’ “” DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49 0 GRAPHIC SCALE 150'300'600' 1 INCH = 300 FT. DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49 0 GRAPHIC SCALE 15'30'60' 1 INCH = 30 FT. DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49 0 GRAPHIC SCALE 15'30'60' 1 INCH = 30 FT. DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Exhibit 2 Compliance with preliminary plat (The Pines; LUA17000801) Summary of Conditions Satisfied PLN - Hearing Examiner Condition 1. The applicant shall provide a final detailed landscaping plan compliant with RMC 4-8- 120D at the time of Utility Construction Permit review that provides 15-feet of landscaping surrounding stormwater Tract D. The vault may encroach into the landscaping screen, provided the landscaping can still be planted on top of the vault. The final landscaping plan shall be approved prior to Utility Construction Permit issuance. All tract landscaping shall be installed and inspected prior to plat recording. Comments: Trees shrubs and ground cover surround the tract with the exception of the access and north perimeter . Landscaping compliments and compliments the tract and is also usable area as the stormwater is within an underground vault. 2. The applicant shall provide a final landscaping plan for review and approval by the Current Planning Project Manager at the time of Utility Construction Permit review that provides a berm within the 15-foot landscaping screen in stormwater Tract D along the Monroe Ave NE frontage. The final landscaping plan shall be approved prior to Utility Construction Permit issuance. The berm shall be installed and inspected prior to plat recording. Comments: The applicant has installed the approved 24-inch berm shown along Monroe Ave frontage as shown on the civil construction plans. The approved berm details can be found on plan number R-3927014. 3. The applicant shall be required to create a homeowner’s association for the shared maintenance and responsibility of the shared tracts and all other shared improvements of this development. A draft of the document(s) shall be submitted to Current Planning Project Manager for the review and approval by the City Attorney and Property Services section prior to the recording of the final plat. The HOA documents shall be recorded concurrently with the final plat. Comments: The applicant has created a homeowner’s association maintenance agreement and has submitted a draft of the documents for review and approval by the City Attorney and Property Services section prior to final plat recording . 4. The applicant shall provide a Road and Grading Plan for review and approval by the Current Planning Project Manager at the time of Utility Construction Permit review that provides tree protection measures identified in RMC 4-4-130H9 for offsite trees with drip lines that are within the subject property; Provided that the “retained” trees referenced in 4-4-130H9 are construed as trees required to be retained (either by the applicant or previously by adjoining property owners) by the City’s tree retention standards. Comments: An Arborist was onsite during grading activities within the drip lines of offsite trees. 5. The applicant shall provide a final landscaping plan for review and approval by the Current Planning Project Manager at the time of Utility Construction Permit review that provides details of split-rail fencing around Tree Retention Tract A and signage identifying the tract as tree protection. Split-rail fencing and signage shall be installed and inspected prior to final plat recording. Comments: The applicant submitted a fencing and signage detail for the required fencing and signage along the boundary of the tree protection tract. The fencing and signage detail was reviewed and approved by the City Current Planning Project Manager. The approved fencing and signage details can be found on plan number R-3927. 6. The applicant shall revise the Preliminary Plat for review and approval by the Current Planning Project Manager at the time of Utility Construction Permit review that provides a front yard setback variation for at least one (1) lot for every four (4) abutting street fronting lots and the varied setbacks shall be provided as a note on the face of the plat. Comments: Setback variations have been provided on Lots 3, 5, 6, 8, and 13 as shown on the approved civil construction plans. The approved building setbacks can be found on plan number R-3927003. 7. The applicant shall provide a plat layout color palette for the new single family homes for review and approval by the Current Planning Project Manager prior to plat recording. Page 1 of 2 DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49 Comments: The color pallete has been submitted and approved by the current planning project manager. 8. The applicant shall provide a revised paving plan for review and approval by the Current Planning Project Manager, at the time of Utility Construction Permit review identifying the modified Monroe Ave NE street section , as approved through Modification Request 1. Comments: The required modified street section shown on civil construction plans. The approved street section can be found on plan number R-3927011. 9. All future homes within the subdivision shall have a fire sprinkler system approved by the Renton Fire Authority . Comments: A note has been placed on the final plat indicating that all future homes shall have an approved fire system approved by the Renton Fire Authority . 10. The applicant shall provide a note on the face of the plat restricting access for lots 5 and 6 to the shared driveway. The front of the future homes on lots 5 and 6 shall be oriented to the new residential street (Road A) with garages located on the side or rear of the homes. Comments: A note has been placed on the final plat indicating that access to the lots 5 and 6 shall be obtained from Tract B. 11. The applicant shall submit revised plans for review and approval by the Current Planning Project Manager at the time of Utility Construction Permit review removing the four (4) pedestrian ramps facing east along Monroe Ave NE . Comments: The applicant has provided adequate ada ramps in accordance with the approved civil construction plans. The approved ada details can be found on plan number R-3927008. 12. All proposed street names shall be approved by the City. Comments: Street names have been approved by City staff and are shown on the final plat map. 13. Side sewer lines shall be installed eight feet (8') into each lot if sanitary sewer mains are available, or provided with the subdivision development. Comments: Side sewer lines were installed a minimum of eight feet (8’) into each lot 14. All utilities designed to serve the subdivision shall be placed underground. Any utilities installed in the parking strip shall be placed in such a manner and depth to permit the planting of trees. Those utilities to be located beneath paved surfaces shall be installed, including all service connections, as approved by the Department of Public Works . Such installation shall be completed and approved prior to the application of any surface material. Easements may be required for the maintenance and operation of utilities as specified by the Department of Public Works . Comments: All utilities designed to serve the subdivision were placed underground. Utilities installed in the parking strip were placed in such a manner and depth to permit the planting of trees. Those utilities located beneath paved surfaces were installed as approved by the Department of Public Works. The installation was completed and approved prior to the application of the surface material. Easements are provided for the maintenance and operation of utilities as specified by the Department of Public Works and are shown on the final plat map. 15. Any cable TV conduits shall be undergrounded at the same time as other basic utilities are installed to serve each lot . Conduit for service connections shall be laid to each lot line by Applicant as to obviate the necessity for disturbing the street area, including sidewalks, or alley improvements when such service connections are extended to serve any building. The cost of trenching, conduit, pedestals and/or vaults and laterals as well as easements therefore required to bring service to the development shall be borne by the developer and/or land owner. The applicant shall be responsible only for conduit to serve his development. Conduit ends shall be elbowed to final ground elevation and capped. The cable TV company shall provide maps and specifications to the applicant and shall inspect the conduit and certify to the City that it is properly installed. Comments: All cable TV conduits were undergrounded at the same time as other basic utilities were installed to serve each lot. Conduit for service connections were laid to each lot line. The cost of trenching, conduit, pedestals and/or vaults and laterals as well as easements that was required to bring service to the development was borne by the developer and/or land owner. Page 2 of 2 DocuSign Envelope ID: 2F9EA9E6-CCF6-486F-92DF-42F805FE0A49