Loading...
HomeMy WebLinkAboutAdden 2 ORIGINAL I PAGE NO 1 OF/cOPAGES CAG-17-050, Adden #2-18 lik AMENDMENT NO. 2 TO AGREEMENT FOR LIFT STATION AND FORCE MAIN REHABILITATION GROUP 1 FACILITIES CAG-17-050 THIS AMENDMENT, dated June 11, 2018, is by and between the City of Renton (the "City"), a Washington municipal corporation, and RH2 Engineering, Inc. ("Consultant"), a Washington corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-17-050, dated March 20, 2017, to provide necessary services for the Lift Station and Force Main Rehabilitation Group 1 Facilities (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the scope of work, change the time of performance, and change the compensation in order to complete the design for the Group 1 facilities and provide services during construction. NOW THEREFORE, It is mutually agreed upon that CAG-17-050 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-2, which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit B-2. All Work shall be performed by no later than May 31, 2019. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased from $203,450 to $535,450, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit C-2 of the agreement, which is attached and incorporated herein. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. ORIGINAL I PAGE NO 2--OF I(PAGES IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT By: at(/Lr5o ikA✓ BY: .f/ K Denis Law Tony V Pardi Mayor Pre 'dent 7/0 a///te? Date Date Attest vtC 4IIIL� 7t • \\\����"""1111111] Jaso A. Seth OF R :,,,% City c lerk ) ()`,�y „„ ""f,,,, 0 " Approved as to Legal Form 17: * ' SEAL 147 //::::°111?'"A"T"E"D";‘;'Y Shane Moloney Renton City Attorney Contract Template Updated 12/29/2017 PAGE 2 OF 2 ORIGINAL�PAGE NO 3 OF L. PAGES EXHIBIT A-2 Scope of Work Amendment No. 2 to CAG-17-050 City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Final Design of Rehabilitation Improvements and Services During Bidding May 2018 Background The following Scope of Work includes the final design and services during bidding for the improvements identified in the predesign study for the ten (10) wastewater lift stations and associated force mains in Group 1. The City of Renton (City)decided to divide the project into two phases. Phase A will include the Airport, East Valley,Lind,Misty Cove,Piper's Bluff,Shy Creek and Stonegate lift stations. In addition to the lift station work, Phase A shall also include replacement of the City's existing trailer-mounted portable standby generator. Phase B will include the Baxter, Cottonwood, and Devil's Elbow lift stations. Each phase will be designed and bid separately. Additionally,the following Scope of Work includes both telemetry panel installation design and services during construction for the 2018 Sewer and Telemetry Upgrades project,which includes fabrication and delivery of four (4) wastewater lift station control panels and two (2) stormwater lift station control panels. The installation design for two (2)of the wastewater control panels will be incorporated into the East Valley and Cottonwood upgrade projects. The installation design for the two (2) stormwater control panels that are allocated to the Rainier and Oakesdale lift stations will be done as part of the Phase A Lift Station improvements. Phase A Lift Stations At the completion of the preliminary design phase of the project, the Phase A lift stations design plans are approximately 60-percent complete.The tasks below outline the remaining tasks that are needed to bid the Phase A lift stations improvements. Assumptions: • Permitting is not anticipated for the Phase A Lift Stations Improvements.All work associated with the improvements is classified under lift station maintenance. Task 9 — Final Design Plans for Phase A Lift Station Rehabilitation Improvements Objective: Prepare bid-ready design plans for the proposed rehabilitation improvements at the Phase A lift stations. Approach: 9.1 Advance design plans from 60-percent to 90-percent, including incorporating review comments from the City into the design plans and additional details for 90-percent design plans. Update engineer's construction cost estimate based on the 90-percent design plans. 1 5(22(2015 6:13 AM J:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW_Lift Station and FM Rehab Group 1.docx LI ORIGINAL L PAGE NO.OFI tPAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work 9.2 Submit the 90-percent design plans and engineer's construction cost estimate to the City for review, consisting of one(1)electronic copy in PDF and two (2) half-size drawing sets. Attend one(1) review meeting with the City. 9.3 Conduct an in-house quality assurance/quality control(QA/QC) review of the plans. Based on review comments, prepare final plans and details (advance from 90-percent complete to 100-percent complete). Update engineer's construction cost estimate based on the final design plans. 9.4 Submit the final design plans and cost estimate to City for review,consisting of one(1)electronic copy in PDF. Provided by the City: • Attendance at 90-percent review meeting. • Review comments for the 90-percent and final design plans sets. RH2 Deliverables: • Attendance at 90-percent review meeting. • 90-percent review plans and engineer's construction cost estimate in electronic format(PDF). • Two(2) half-size(11-inch by 17-inch)copies of 90-percent review plans. • Final plans and engineer's construction cost estimate in electronic format(PDF). Task 10—Stormwater Lift Station Telemetry Panel Installation Design Objective: Prepare bid-ready design plans for the proposed telemetry panel installation design at the Rainier and Oakesdale lift stations for inclusion in the Phase A lift station bid set. Approach: 10.1 Prepare Rainier and Oakesdale Lift Stations Telemetry Replacement Electrical Plans — Prepare electrical plans for the installation of the telemetry panels at the pump stations. 10.2 Incorporate the Rainier and Oakesdale lift stations stormwater telemetry replacement electrical work into the Phase A lift station technical specifications. 10.3 Submit the 90-percent design plans and engineer's construction cost estimate to the City for review, consisting of one(1) electronic copy in PDF and two (2) half-size drawing sets.Attend one (1) review meeting with the,City. 10.4 Conduct an in-house QA/QC review of the plans. Based on review comments, prepare final plans and details (advance from 90-percent complete to 100-percent complete). Update engineer's construction cost estimate based on the final design plans. 10.5 Submit the final design plans and cost estimate to City for review,consisting of one(1)electronic copy in PDF. Provided by the City: • Attendance at 90-percent review meeting. • Review comments for the 90-percent and final design plans sets. 2 5/22/2018 6:13 AM J:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW_Lift Station and FM Rehab Group 1.docx ORIGINAL I PAGE NO 5 OF.L PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work RH2 Deliverables: • Attendance at 90-percent review meeting. • 90-percent review plans and engineer's construction cost estimate in electronic format(PDF). • Two(2) half-size(11-inch by 17-inch)copies of 90-percent review plans. • Final plans and engineer's construction cost estimate in electronic format(PDF). Task 11 —Specifications for Phase A Lift Station Rehabilitation Improvements Objective: Prepare general and technical specifications for the proposed rehabilitation improvements at the Phase A lift stations. Approach: 11.1 Prepare technical specifications based on RH2's technical specifications and tailored for this project. 11.2 Coordinate with the City to update the City's standard specifications and general conditions as warranted for this project. Submit to the City with 90-percent complete plans for review and comment. 11.3 Conduct an in-house QA/QC review of the specifications. Based on review comments, prepare final specifications(advance from 90-percent complete to 100-percent complete). Provided by the City: • City's standard specifications and general conditions. • Review and comment on technical and general specifications at 90-percent complete. RH2 Deliverables: • One(1)electronic set(PDF)of technical and general specifications at 90-percent design milestone. • One (1) electronic set(PDF)of final technical and general specifications. Task 12—Services During Bidding and Award Objective: Provide engineering services during the bidding phase of the project. Approach: 12.1 Prepare a bid advertisement and coordinate the timing and placement with the City. The City will submit the advertisement to the appropriate publications. 12.2 Produce electronic and hard copy sets of the plans and specifications. The City will produce the bid document sets as needed for bidding the project. 12.3 Respond to questions from bidders, and revise construction plans, technical specifications, or construction contract conditions during the bidding process, if requested. This may include the preparation and issuance of up to one(1)addendum. 12.4 Assist the City with the evaluation of the qualifications and references for the apparent low bidder. Prepare recommendation of bid award letter. It is assumed that the City will handle bid award and construction contract execution. 3 5/22/2018 6:13 AM 1:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW_Lift Station and FM Rehab Group 1 docx ORIGINAL I PAGE NO L.OF 1 6PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work 12.5 Prepare construction plan sets and specifications for the pre-construction meeting. Produce PDF version of documents. Provided by the City: • Management of and payment for the Builder's Exchange online bidding process. • Distribution of bid documents and maintenance of the plan holder's list,if applicable. • Issuance of addendum, if any,to all construction contract document holders. • Bid opening attendance and tabulation of received bids. • Bid award and construction contract execution. RH2 Deliverables: • Bid plan and specifications sets: one (1) electronic set (PDF) and four (4) 11-inch by 17-inch hard copies; one (1) set for City use and bidding purposes; and three (3) sets for RH2's file and staff use during bidding. • Phone assistance to vendors and bidders during the bidding phase. • One(1) addendum in electronic format(PDF), if needed. • Reference check of lowest bidder. • Preparation of recommendation of bid award letter in electronic format(PDF). • Construction plans sets and specifications:one (1)electronic set(PDF),four(4)full-size plan sets,and seven (7) half-size plan sets;two(2)full-size and four(4) half-size sets for contractor;two(2)full-size and two(2) half-size sets for City; and one(1) half-size set for RH2 file and staff use. Phase B Lift Stations Task 13—Geologic Exploration, Survey, and Hydraulic Analysis Objective: Perform a geologic exploration and obtain a survey for select lift station sites. Perform additional hydraulic analysis for the Cottonwood Lift Station. Approach: 13.1 Review available geologic and geotechnical reports, and groundwater information. Perform a geotechnical investigation to observe,characterize,and document earth and groundwater conditions of the sites. Identify potential geologic hazards and recommendations to mitigate the identified geologic risks,identify potential risk for soil contamination and recommendations to mitigate possible soil contamination at the Baxter Lift Station, and provide recommendations for design and construction. RH2 will subcontract with a boring subcontractor and an excavation subcontractor to perform the boring and test pits, respectively. 13.1.1 Baxter Lift Station: Observe excavation of four (4) test pits (no more than 15 feet deep) to investigate soil and groundwater conditions, and identify the location and characteristics of materials around the force main casing. Coordinate test pits with the U.S. Environmental Protection Agency (EPA). Collect one (1) representative soil sample from each test pit for laboratory analysis of semi-volatile organic compounds and petroleum hydrocarbons. 4 5/22/2018 6:13 AM 1:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-Z SOW_Lift Station and FM Rehab Group 1.docx ORIGINAL I PAGE NO 1 OF 16PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work 13.1.2 Cottonwood Lift Station: Observe excavation of two (2)test pits(no more than 10 feet deep) to investigate soil and groundwater conditions, and identify the location and characteristics of existing native materials. 13.1.3 Devil's Elbow Lift Station Access Road:Observe excavation over one(1)day of four(4)to eight (8)test pits on the NE 27th Street access road(no more than 10 feet deep)to investigate soil and groundwater conditions, and identify the location and characteristics of existing native materials. Observe soil borings over one (1) day on the access road (no more than 40 feet deep) to investigate soil and groundwater conditions, and identify the location and characteristics of existing native materials, if deemed necessary based on the findings from the test pits. 13.2 Prepare a geologic engineering report that will include a summary of geological conditions and provide recommendations for the mitigation of contaminated soil. The geologic engineering report will include a figure showing exploration locations, photographs,and logs from each test pit(and soil boring) performed. 13.3 Describe survey work to be completed,including the survey limits and requirements.Subcontract with and schedule the survey work in coordination with other activities. Review the survey once complete for Cottonwood Lift Station, Baxter Lift Station,and the Devil's Elbow Lift Station access road. 13.4 Coordinate surveyor preparation of the legal description and plan for easement/property acquisition of Ramac, Inc., property for the Cottonwood Lift Station. 13.5 Perform hydraulic calculations and drawdown tests, and recommend pumps for the Cottonwood Lift Station. It is assumed that the City of Renton (City) will facilitate the installation of a tap on the lift station force main. RH2 will install a pressure logger to record static and operating pressure readings. Assumptions: • RH2 will rely upon the accuracy and completeness of any information, data, and materials generated or produced by the City or others in relation to this Scope of Work. • If field investigations reveal unanticipated geologic or hydrogeologic conditions that could have a significant impact on the design or construction of the lift station and road reconstruction, additional exploration, such as deeper soil borings, and authorization may be necessary. One-call utility locates will be marked in the field and called in by boring and excavation subcontractor. RH2 will rely on the field markings'accuracy near test pits and soil borings.A soil laboratory will be subcontracted by the RH2 to provide grain-size analysis of representative soil samples. An analytical laboratory will be subcontracted by RH2 to provide chemical analysis of representative soil samples from the Baxter Lift Station test pits. • It is assumed that no soil contaminants, in particular, dense non-aqueous phase liquid(DNAPL), will be found while excavating the test pits for the Baxter Lift Station. If DNAPL or other hydrocarbon-based contamination is suspected or observed while excavating the test pits for the Baxter Lift Station, work associated with further site exploration and additional coordination with the EPA will be mutually negotiated via an amendment. • it is assumed that surveying will be subcontracted by RH2 to a professional land surveyor (PLS) to provide horizontal and vertical survey control and topographical information, including surface 5 S/22/2018 6:13 AM 1:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_50W_Lift Station and FM Rehab Group 1.docx ORIGINAL PAGE NO OF I k PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work features, underground utilities, roadway and utility alignments, rights-of-way (ROW), and property lines. • It is assumed that the City is taking the lead on property/easement negotiations with the property owner for the Cottonwood Lift Station. Provided by City: • Available geotechnical, environmental, and construction reports related to the existing Cottonwood Lift Station, Baxter Lift Station force main, and Devil's Elbow Lift Station access road. RH2 Deliverables: • Geologic engineering report for the Baxter Lift Station force main replacement, Cottonwood Lift Station, and Devil's Elbow Lift Station access road and drainage improvements. One (1) electronic copy(PDF) and one(1) hard copy of the geologic engineering report will be provided for City use. • Topographic land survey of the existing lift station site and surrounding area as needed for the proposed Cottonwood Lift Station improvements. • Topographic land survey along the existing force main and surrounding area as needed for the proposed Baxter Lift Station force main replacement. • Topographic land survey of the existing Devil's Elbow Lift Station access road and surrounding area as needed for the proposed access road and drainage improvements for the Devil's Elbow Lift Station. Task 14— Final Design Plans for Phase B Lift Station Rehabilitation Improvements Objective: Prepare bid-ready design plans for the proposed rehabilitation improvements at the Phase B lift stations. Approach: 14.1 Prepare 60-percent design plans and preliminary cost estimate for this project.Submit the 60-percent design plans and cost estimate to the City for review consisting of one (1) electronic copy in PDF. Attend one(1) review meeting with the City. 14.2 Advance design plans from 60-percent to 90-percent, including incorporating review comments from the City into the design plans and additional details for 90-percent design plans. Update engineer's construction cost estimate based on the 90-percent design plans. 14.3 Submit the 90-percent design plans and engineer's construction cost estimate to City for review, consisting of one(1) electronic copy in PDF and two(2) half-size drawing sets. Attend one (1) review meeting with the City. 14.4 Conduct an in-house QA/QC review of the plans. Based on review comments, prepare final plans and details (advance from 90-percent complete to 100-percent complete). Update engineer's construction cost estimate based on the final design plans. 14.5 Submit the final design plans and cost estimate to City for review consisting of one (1)electronic copy in PDF. 6 5/22/2018 6:13 AM 1:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW_tift Station and FM Rehab Group 1.docx ORIGINAL?PAGE NO 1 OF �(PPAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work Assumptions: • Cottonwood Lift Station: o It is assumed that a landscape plan prepared by a licensed landscape architect(ASIA)will not be required; o It is assumed that the existing wet well will continue to be used for the proposed lift station; and o It is assumed that the electrical and control panel will be housed in a concrete masonry unit (CMU)building similar to the City's other lift station electrical buildings. Provided by the City: • Attendance at 60-and 90-percent review meetings. • Review comments for the 60-and 90-percent, and final design plans sets. RH2 Deliverables: • Attendance at 60-and 90-percent review meetings. • 60-percent review plans and preliminary cost estimate in electronic format(PDF). • 90-percent review plans and engineer's construction cost estimate in electronic format(PDF). • Two(2) half-size(11-inch by 17-inch)copies of 90-percent review plans. • Final plans and engineer's construction cost estimate in electronic format(PDF). Task 15—Specifications for Phase B Lift Station Rehabilitation Improvements Objective: Prepare general and technical specifications for the proposed rehabilitation improvements at the Phase B lift stations. Approach: 15.1 Prepare technical specifications based on RH2's technical specifications and tailored for this project. Submit to the City with 60-percent complete plans for review and comment. 15.2 Coordinate with the City to update the City's standard specifications and general conditions as warranted for this project. Incorporate City's comments on the 60-percent technical specifications and advance to 90-percent complete. Submit to the City with 90-percent complete plans for review and comment. 15.3 Conduct an in-house QA/OC review of the specifications. Based on review comments, prepare final specifications(advance from 90-percent complete to 100-percent complete). Provided by the City: • City's standard specifications and general conditions. • Review and comment on technical and general specifications at 60-and 90-percent complete. RH2 Deliverables: • One(1)electronic set(PDF)of technical specifications at 60-percent design milestone. 7 5/22/2018 6:13 AM Meta\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW_Lift Station and FM Rehab Group 1.docx ORIGINAL ! PAGE NO 1OOF I L PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work • One(1)electronic set(PDF)of technical and general specifications at 90-percent design milestone. • One(1)electronic set(PDF)of final technical and general specifications. Task 16— Permitting for Phase B Lift Station Rehabilitation Improvements Objective: Provide permitting assistance to the City to construct the proposed rehabilitation improvements at the Phase B lift stations. Assist the City in the preparation of permit applications for the improvements; assist the City in the submittal of finalized permit applications; and facilitate City reviews/approvals, as requested. It is anticipated that approved permit applications will be incorporated into bidding and construction contract documents, as needed. Approach: 16.1 Coordinate with the City regarding planned project improvements, pre-application meeting needs, and anticipated permits for the Phase B lift station improvements.Attend the pre-application meeting with the City,as desired. 16.2 Provide technical information to the City for preparation of the State Environmental Policy Act(SEPA) Checklist. It is assumed the City will prepare one (1) SEPA Checklist to address the lift station rehabilitation improvements requiring SEPA review. 16.3 Provide technical information to the City for preparation of the Shoreline Substantial Development Permit (SSDP) for the Cottonwood Lift Station improvements. It is assumed that a SSDP will be required, rather than a Shoreline Exemption. If allowed by the City's Planning Department, it is assumed that an amendment to the existing SSDP, rather than a new SSDP application, will be prepared. The City will prepare and submit all shoreline permit application materials. RH2 will prepare supporting documents as needed. If the City would prefer that RH2 prepare and submit shoreline permit materials, it will be addressed through an amendment to this Scope of Work. 16.4 Provide technical information to the City for preparation of a Grading Permit application and supporting documents for the Devil's Elbow Lift Station access road improvements, which are anticipated to involve earthwork above the thresholds for drainage review under the City's Surface Water Design Manual. 16.5 Provide technical information to the City for preparation of a Civil Construction Permit application and supporting documents, if required,for the Devil's Elbow and Cottonwood lift stations improvements. The necessity of obtaining this permit will be confirmed at the pre-application meeting. If this permit is not required, time will not be expended on this task. 16.6 Provide technical information to the City for preparation of a Commercial Building Permit application for the Cottonwood Lift Station improvements. it is assumed that a building permit will be necessary for any retaining wall improvements over 4 feet high. If the proposed retaining wall is omitted and/or heights are retained below 4 feet, the need for this permit should be absolved. If this permit is not required, time will not be expended on this task. Note,proposed electrical building improvements are anticipated to be designed below the size threshold triggering the need for a Building Permit. 16.7 Provide technical information to the City for preparation of a Right-of-Way (ROW) Use Permit application for those lift stations involving work in the ROW. 16.8 Following permit submittals,coordinate with City staff to review applications and respond to requests for additional information. 8 5/22/2018 6:13 AM J:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW_Litt Station and FM Rehab Group 1.docx ORIGINAL i PAGE NO II OF go PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work Assumptions: • The project will require a pre-application meeting through the City's Planning Department. Up to two(2)RH2 staff will be available to attend the pre-application meeting, as desired by City staff. If the pre-application meeting can be waived, a portion of subtask 12.1 will not be expended. • The City will prepare the SEPA Checklist, utilizing technical information provided by RH2. The City will coordinate the SEPA submittal, and the City's Planning Department will handle the determination and publication. If the City would prefer that RH2 prepare and submit the SEPA Checklist, an amendment to this Scope of Work will be prepared. • it is assumed that no additional permits will be needed for work adjacent to a Superfund site. If additional permits are required, an amendment to this Scope of Work will be prepared. • Except for the Devil's Elbow Lift Station improvements, no more than 2,000 square feet (sf) of new, replaced, or new plus replaced impervious surface,or 7,000 sf of land disturbing activity, will be added at each project site. Therefore, the lift station improvements will not be subject to drainage review in accordance with the 2017 Renton Surface Water Design Manual. Storm water detention and water quality treatment will not be required. If it is determined that the proposed improvements will meet the threshold,preparation of a drainage report will be addressed through an amendment to this Scope of Work. • Except for the Cottonwood Lift Station improvements, the lift station improvements will not require a building or demolition permit from the City. it is anticipated that project improvements will fit within the exemptions for these permits and that City staff will coordinate with the City's Planning Department on this element to receive exemption confirmation. • Besides SSDP permitting for the Cottonwood Lift Station improvements, it is anticipated that no other land use permits will be required. • It is assumed that the work to repair the Devil's Elbow access road will not trigger Critical Areas review, as this work will involve rehabilitation and occur within an existing developed and graded surface. • The project will disturb less than 1 acre of land and will not require a Construction Storm water General Permit through the Washington State Department of Ecology. Provided by the City: • Payment of all permit fees directly. • Attendance at the pre-application meeting(if required). • Preparation of the SEPA environmental checklist, SSDP application and documentation, Grading Permit,Civil Construction Permit,Commercial Building Permit,and ROW Use Permit applications(RH2 will assist with supporting documents). RH2 Deliverables: • Pre-application meeting request application (if required), meeting attendance, and meeting minutes in electronic format(PDF). • Technical information for the SEPA Checklist,SSDP, Grading,Civil Construction, Commercial Building, and ROW Use permits. 9 5/22/2018 6 13 AM 1:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2--SOW_lift Station and FM Rehab Group 1.docx ORIGINALLPAGE NO)2-OF I( PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work • Records of correspondence and coordination with reviewing City staff in electronic format(PDF). Task 17—Services During Bidding and Award Objective: Provide engineering services during the bidding phase of the project. Approach: 17.1 Prepare a bid advertisement and coordinate the timing and placement with the City. The City will submit the advertisement to the appropriate publications. 17.2 Produce electronic and hard copy sets of the plans and specifications. The City will produce the bid document sets as needed for bidding the project. 17.3 Respond to questions from bidders, and revise construction plans, technical specifications, or construction contract conditions during the bidding process, if requested. This may include the preparation and issuance of up to one(1)addendum. 17.4 Assist the City with the evaluation of the qualifications and references for the apparent low bidder. Prepare recommendation of bid award letter. It is assumed that the City will handle bid award and construction contract execution. 17.5 Prepare construction plan sets and specifications for the pre-construction meeting. Produce PDF version of documents. Provided by the City: • Management of and payment for the Builder's Exchange online bidding process. • Distribution of bid documents and maintenance of the plan holder's list, if applicable. • Issuance of addendum, if any,to all construction contract document holders. • Bid opening attendance and tabulation of received bids. • Bid award and construction contract execution. RH2 Deliverables: • Bid plan and specifications sets: one (1) electronic set (PDF) and four (4) 11-inch by 17-inch hard copies; one (1) set for City use and bidding purposes, and three (3) sets for RH2's file and staff use during bidding. • Phone assistance to vendors and bidders during the bidding phase. • One (1)addendum in electronic format (PDF), if needed. • Reference check of lowest bidder. • Preparation of recommendation of bid award letter in electronic format(PDF). • Construction plans sets and specifications:one(1)electronic set(PDF),four(4)full-size plan sets,and seven (7) half-size plan sets; two(2)full-size and four(4) half-size sets for contractor;two(2)full-size and two(2) half-size sets for City; and one(1) half-size set for RH2 file and staff use. 10 5/22/2018 6:13 AM J:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW_Lift Station and FM Rehab Group 1.docx ORIGINAL I PAGE NO 13 OF I. PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work Task 18—Stormwater Pump Station Telemetry Services During Construction Objective: Provide technical services during construction, as requested by the City, for the telemetry panel replacement fabrication for the stormwater pump stations, including pre-construction meeting attendance, submittal review,control panel factory witness testing,and other services to the level as described in this Task and provided for in the Fee Estimate(Exhibit C-2).Should additional support be required, RH2 can prepare a contract amendment to this Scope of Work for additional services. Approach: 18.1 Attend Pre-construction Meeting—Attend the pre-construction meeting to discuss technical sections of the project documents and project requirements. Contractor documents requiring review by RH2 will be submitted at the meeting for review and comments. 18.2 Review Submittals/Shop Drawings — Review shop drawings and catalog submittals of those items requested in the technical specifications. Provide a written response to the construction contractor and the City accepting or rejecting each shop drawing and catalog submittal reviewed. 18.3 Provide Design Clarification and Respond to Requests for Information—Provide technical support by responding to contractor's questions and requests for information (RFIs). 18.4 Attend and Witness Factory Testing of the Control Panels—Attend the factory testing of the control panels at Quality Control Corporation's (QCC) shop in Lynnwood. Witness and assist with testing to confirm that the control panels are functional and ready for delivery to the City. Control panel factory testing shall include two (2)site visits to QCC's shop. One (1)for initial testing of the control panels and another for follow-up testing to confirm any issues identified at the initial testing have been addressed. 18.5 Review Change Orders — Review contractor pricing of change orders and provide a written recommendation to the City regarding the reasonableness of the cost. Upon City approval of the change, significant drawing and/or specification revisions required for change orders shall meet the same criteria required for design, including submittal in electronic format, unless otherwise directed by the City. Coordinate change orders with the City. 18.6 Prepare Construction Record Drawings—Review field records and revise project drawings to prepare construction record drawings. RH2 Deliverables: • Attendance at pre-construction meeting. • Written responses for shop drawings and submittals,RFIs,and change orders in electronic PDF format. • Attendance at factory testing. • Construction record drawings in electronic PDF format. Task 19—Sewer Lift Station Telemetry Services During Construction Objective: Provide technical services during construction, as requested by the City, for the telemetry panel replacement fabrication for the sewer lift stations, including pre-construction meeting attendance,submittal review, control panel factory witness testing, and other services to the level as described in this Task and 11 5/22/2018 6:13 AM 1:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW_Lift Station and FM Rehab Group 1.docx dd �, ORIGINAL t PAGE NO I LI OF 'PAGES City of Renton Amendment No.2 Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-2 Final Design of Rehabilitation Improvements and Services During Bidding Scope of Work provided for in the Fee Estimate (Exhibit C-2). Should additional support be required, RH2 can prepare a contract amendment to this Scope of Work for additional services. Approach: 19.1 Attend Pre-construction Meeting—Attend the pre-construction meeting to discuss technical sections of the project documents and project requirements. Contractor documents requiring review by RH2 will be submitted at the meeting for review and comments. 19.2 Review Submittals/Shop Drawings — Review shop drawings and catalog submittals of those items requested in the technical specifications. Provide a written response to the construction contractor and the City accepting or rejecting each shop drawing and catalog submittal reviewed. 19.3 Provide Design Clarification and Respond to RFIs — Provide technical support by responding to contractor's questions and RFIs. 19.4 Attend and Witness Factory Testing of the Control Panels—Attend the factory testing of the control panels at QCC's shop in Lynnwood.Witness and assist with testing to confirm that the control panels are functional and ready for delivery to the City.Control panel factory testing shall include two(2)site visits to QCC's shop. One(1)for initial testing of the control panels and another for follow-up testing to confirm any issues identified at the initial testing have been addressed. 19.5 Review Change Orders — Review contractor pricing of change orders and provide a written recommendation to the City regarding the reasonableness of the cost. Upon City approval of the change, significant drawing and/or specification revisions required for change orders shall meet the same criteria required for design, including submittal in electronic format, unless otherwise directed by the City. Coordinate change orders with the City. 19.6 Prepare Construction Record Drawings—Review field records and revise project drawings to prepare construction record drawings. RH2 Deliverables: • Attendance at pre-construction meeting. • Written responses for shop drawings and submittals,RFIs,and change orders in electronic PDF format. • Attendance at factory testing. • Construction record drawings in electronic PDF format. 12 5/22/2018 6:13 AM 1:\Data\REN\117-037\Contract\Amend No.2\Amend No.2-EXHIBIT A-2_SOW Lift Station and FM Rehab Group 1.docx ORIGINAL I PAGE NO ISOF)PAGES Exhibit B-2: Time Schedule of Completion City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Final Design of Rehabilitation Improvements and Services During Bidding ANTICIPATED NOTICE TO PROCEED DATE: June 1,2018 Anticipated Task Completion PHASE A LIFT STATIONS Task 9—Final Design Plans for Phase A Lift Station Rehabilitation September 2018 Improvements Task 10—Specifications for Phase A Lift Station Rehabilitation September 2018 Improvements Task 11—Services During Bidding and Award October 2018 PHASE B LIFT STATIONS Task 12—Geologic Exploration,Survey,and Hydraulic Analysis August 2018 Task 13—Final Design Plans for Phase B Lift Station February 2019 Rehabilitation Improvements Task 14—Specifications for Phase B Lift Station Rehabilitation February 2019 Improvements Task 15—Permitting for Phase B Lift Station Rehabilitation December 2018 Improvements Task 16—Services During Bidding and Award March 2019 Task 17—Stormwater Pump Station Telemetry Services During August 2018 Construction Task 18—Sewer Pump Station Telemetry Services During August 2018 Construction ANTICIPATED CONTRACT COMPLETION DATE: May 2019 1 5/21/2018 10:35:00 AM l:\Data\REN\117-037\Contract\Amend No.2\Amend No.2_EXHIBIT B-2_Completion Schedule_Lift Station and FM Rehab Group 1.docx j ORIGINAL!PAGE N0(OF 1 PAGES EXHIBIT C-2 City of Renton Amendment No.2 to CAG-17-050 Lift Station and Force Main Rehabilitation Group 1 Facilities Final Design of Rehabilitation Improvements and Services During Bidding Fee Estimate Description Total tabor Total Subconsultant Total Expense Total Cost PHASE A UFT STATIONS (Task 9 Final Design Plans for Phase A UR Station Rehabilitation Improvements I 240 I$ 39,596 1$ -I$ 4,065 1$ 43,661 (Task 10 Stormwater lift Station Telemetry Panel Installation Design 1 51 I$ 8,904 1$ -I$ 800 I$ 9,704 I Flask 11 Specifications for Phase A lift Station Rehabilitation Improvements 1 82 1$ 14,394 1$ -I$ 493 1$ 14,887 I [Task 12 Services During Bidding and Award I 56 I$ 8,884 I$ -I$ 1.284 I$ 10,168 I f Phase A Lift Stations Total I 433 I $ 72,465 I$ -I$ 6,735 I $ 79,200 PHASE B UFT STATIONS Flask 13 Geologic Exploration,Survey,and Hydraulic Analysis I 154 I$ 29,5461$ 43,125 I$ 676 I$ 73,347 1 [Task 14 Final Design Plans for Phase B lift Station Rehabilitation Improvements 1 650 I$ 108,362 1$ -I$ 9,592 1$ 117,954 I (Task 15 Specifications for Phase B lift Station Rehabilitation Improvements I 88 I$ 15,396 I$ -I$ 465 1$ 15,861 I [Task 16 Permitting for Phase 0 Lift Station Rehabilitation Improvements I 106 I $ 16,2981$ -1$ 1,535 I$ 17,833 1 (Task 17 Services During Bidding and Award 1 74 1$ 11,350 1$ -1$ 1,456 I$ 12,806 1 (Phase B Lift Stations Total 11072 I $ 180,952 I$ 43,125 I $ 13,723 I$ 237,800 TELEMETRY SERVICES DURING CONSTRUCTION ITask 18 Stormwater Pump Station Telemetry Services During Construction 1 36 I$ 6,552 I$ -1$ 719 I$ 7,271 1 Flask 19 Sewer tilt Station Telemetry Services During Construction I 38 I$ 6,978 1$ .I$ 751 1$ 7,729 I 1 Subtotal Sewer Lift Station Telemetry Services During Construction Tasks I 74 I $ 13,530 I$ -I$ 1,470 I $ 15,000 I AMENDMENT NO.2 PROJECT TOTAL I 1579 I $ 266,947 I $ 43,125 1 $ 21,928 I $ 332,000 I