Loading...
HomeMy WebLinkAboutAdden 3 CAG-13-161,Adden#3-17 AMENDMENT NUMBER THREE TO THE AGREEMENT BETWEEN PSR MECHANICAL(PUGET SOUND REFRIGERATON)AND THE CITY OF RENTON,WASHINGTON This amendment is entered into between the City of Renton (City) and PSR Mechanical (aka Puget Sound Refrigeration) and amends and attaches to and is part of the existing Agreement entered into previously between the parties on August 14, 2013, (Reference:CAG#13–161). The parties agree to the following amendments: Item 3. Time of Performance: The Time of Performance for the Agreement(CAG-13-161}, shail be extended to cover lulv 1.2017 throu�h June 30,2018. Item 5. Contract Sum: The total annual amount of the contract shall be $9,411.60 (annuallvl, which includes Washington State Sales Tax. tn all other respects, the Scope of Services, Changes in Scope of Services, Method of Payment, Prevailing Wages, Warranty, Independent Contractor, Discrimination Prohibited,Assignment and Subcontract, Record Keeping and Reporting, Hold Harmless, Termination, Renton Business License, Insurance and Exhibits to Agreements of both parties shall remain the same as agreed to in the Puget Sound Refrigeration Mechanical contract. This Agreement is entered into as of the day and year written below. NTRACTOR CITY OF RENTON . —� Signature Kelly Beyme ,Admi strator b ��t ���'1 �//��i� Date Date �1�110 �1��IGS - tt•� ��!lftf� Printed Name and Title �J�l' {�'rx�.,lno..,ic�.,� Business Name 3�3a. NE, ����`� 5�..�.k- Mailing Address Si.z.r„��-�.� �,J1�� `�$I Z�_ City State Zip �?.,>E.� 36"i-d�s�uv Se��U,�.�. Ca PSr,�.l��,���.�.,�.c:.cw. Telephone Email