Loading...
HomeMy WebLinkAbout02.1 Arterial Rehabilitation - Renton Ave S ResurfacingTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 2.1 Project Title:Arterial Rehabilitation - Renton Ave S Resurfacing Community Planning Area:West Hill Fund: Functional Classification:Minor Arterial Project: Project Length:0.60 mi Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 78,310 78,310 - - - - - - - - R-O-W (includes Admin)- - - - - - - - - - Construction 1,875,390 - 1,325,390 550,000 550,000 - - - - - Construction Services - - - - - - - - - - Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 1,953,700 78,310 1,325,390 550,000 550,000 - - - - - Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share 505,655 78,310 152,345 275,000 275,000 - - - - - Fund Balance 427,345 - 152,345 275,000 275,000 - - - - - Grants In-Hand (STP)1,020,700 - 1,020,700 - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (1)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined - - - - - - - - - - Total Sources 1,953,700 78,310 1,325,390 550,000 550,000 - - - - - Arterial Rehabilitation - Renton Ave S Resurfacing 1,953,700 - Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program The construction of this project is being coordinated with development construction along Renton Ave S to minimize construction impacts and cost. 317 Hebe Bernardo 425-430-7232 This project will resurface 0.60 miles of Renton Ave S from S 130th St (west City Limits) to Hardie Ave SW and upgrade ADA ramps to current standards. The roadway is classified as a T-2 truck route carrying 5.8 million tones of freight annually. The overall condition of the pavement will be improved and the project will extend the pavement life (12-15 years). Renton Ave S is also an alternate route to SR-900, connecting Renton to the Skyway area and South Seattle. The City was awarded a $1,020,700 STP grant for Pavement Preservation in 2016. Design is underway and will be completed in the Fall of 2018. Construction to be completed in 2019. 122185