HomeMy WebLinkAbout25. Williams Ave Bridge - Seismic Retrofit and PaintingTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 25 Project Title:Williams Ave Bridge - Seismic Retrofit and Painting Community Planning Area:City Center Fund: Functional Classification:N/A Project: Project Length:N/A Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 620,000 - 70,000 550,000 420,000 130,000 - - - - R-O-W (includes Admin)50,000 - - 50,000 50,000 - - - - - Construction 2,175,450 - - 2,175,450 - 2,175,450 - - - - Construction Services 435,000 - - 435,000 - 435,000 - - - - Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 3,280,450 - 70,000 3,210,450 470,000 2,740,450 - - - - Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share 132,000 - 9,450 122,550 - 122,550 - - - - Fund Balance 163,450 - - 163,450 63,450 100,000 - - - - Grants In-Hand (FHWA Bridge)2,985,000 - 60,550 2,924,450 406,550 2,517,900 - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (1)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined - - - - - - - - - - Total Sources 3,280,450 - 70,000 3,210,450 470,000 2,740,450 - - - - Williams Ave Bridge - Seismic Retrofit and Painting 317 Derek Akesson 425-430-7337 The Williams Ave Bridge was built by the City of Renton in 1954. It is a three span bridge that crosses over the Cedar River. The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The project will also perform a seismic analysis and retrofit along with other improvements. The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquefication susceptibility during seismic events. New project. In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,985,000 to perform a seismic retrofit and painting of the bridge. A 13.5% local match is required for Preliminary Engineering and ROW. If construction is authorized by December 2020, the project is eligible for 100% FHWA funding for eligible costs. 3,280,450 - Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program