HomeMy WebLinkAboutRES 4348CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4348
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, ADOPTING THE
AMENDED 2017/2018 CITY OF RENTON FEE SCHEDULE.
WHEREAS, on November 23, 2009, the Council adopted Ordinance No. 5509, which
removed many fees from the Renton Municipal Code and consolidated them into the 2010 City
of Renton Fee Schedule brochure, which fee schedule was subsequently amended several times;
and
WHEREAS, on November 21, 2016, the City Council passed Resolution No. 4300, adopting
an amended fee schedule for 2017 and 2018; and
WHEREAS, on April 17, 2017, the City Council passed Resolution No. 4309, adopting an
amended fee schedule for 2017 and 2018; and
WHEREAS, on July 10, 2017, the City Council passed Resolution No. 4315, adopting an
amended fee schedule for 2017 and 2018 as part of the City's 2017 2nd Quarter Budget
Adjustment to the 2017/2018 biennial budget;
WHEREAS, on October 16, 2017, the City Council passed Resolution No. 4318, adopting
an amended fee schedule for 2017 and 2018, which included reduced development fees,
including transportation and parks impact fees, utility system development charges and land use
review and building fees for accessory dwelling units; and
WHEREAS, on November 13, 2017, the City Council passed Resolution No. 4323, adopting
an amended fee schedule for 2017 and 2018 in order to adopt fees for copying records consistent
1
RESOLUTION NO. 4348
with the Public Records Act, by adopting the state legislature's statutory default fees and costs
as authorized in RCW 42.56.120(2)(b), (c), and (e); and
WHEREAS, it is necessary amend the fee schedule for 2017 and 2018 by adopting an
amended 2017-2018 City of Renton Fee Schedule brochure as a part of the City's 2018 2"d Quarter
budget amendment;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The amended 2017-2018 City of Renton Fee Schedule brochure, attached
hereto, is hereby adopted by reference. A copy of the fee brochure is at all times filed with the
City Clerk.
PASSED BY THE CITY COUNCIL this 16thday of Jul
Jason A. Seth, City Clerk
2018.
APPROVED BY THE MAYOR this 16th day of July , 2018.
Approved as to form:
Shane Moloney, City Attlrrney
RES:1775:6/7/18:scr
Denis Law, Mayor
F R Ely
O'
SEAL :*=
4
'1q 11110 R A T E D
Return to the Table of Contents
2017-201
City of Renton Fee Schedule
Rev. July 2018
SECTION I. MISCELLANEOUS FEES
SECTION II. MAPLEWOOD GOLF COURSE
SECTION III. CITY CENTER PARKING FEES
SECTION IV. AQUATIC FEES
SECTION V. CARCO THEATER (REPEALED)
SECTION VI. PARKS AND FACILITIES USE AND RENTAL
SECTION VII. COMMUNITY CENTER PASS CARD & FEES
SECTION VIII. AIRPORT CHARGES
SECTION IX. ANIMAL LICENSES FEES* - RMC 5-4-2
SECTION X. BUSINESS LICENSES
SECTION XI. ADULT ENTERTAINMENT LICENSES
SECTION XII. DEVELOPMENT FEES
Building Fees:
Land Use Review Fees:
Public Works Fees:
Technology Surcharge Fee
Impact Fees:
SECTION XIII. FIRE DEPARMENT FIRE MARSHALL FEES (RFA)
1
2
2
3
3
3
4
5
5
5
5
5
5
8
9
13
13
14
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
,SECTION•US FEES
2016
2017
1. Maps:
a. Zoning maps - standard 11 x 17
$4
$4
$4
b. Zoning maps - large 24 x 36
$12
$12
$12
C. Comprehensive Plan map - standard 11 x 17
$4
$4
$4
d. Comprehensive Plan map - large 24 x 36
$12
$12
$12
e. Precinct maps
$5
$5
$5
2. Plat:
a. First page
$2
$2
$2
b. Each additional page
$1
$1
$1
3. Photocopies:
a. Each 8.5" x 11" or 8.5" x 14"
$0.15
$0.15
$0.15
b. Each 11" x 17"
$0.20
$0.20
$0.20
C. Each 8.5" x 11" or 8.5" x 14" color
$0.25
$0.25
$0.25
4. Budget:
a. City's Budget
$10
$10
$10
b. City's Budget to other municipality or quasi -municipal
N/C
N/C
N/C
corporation or other nonprofit charitable or education
S. Audio or Video Recording Copies:
a. Audio recording, each copy
$2
$2
$2
b. Video recording, each copy
$2
$2
$2
6. Regulations and Plans:
a. Comprehensive Plan and Map
$30
$30
$30
b. Title IV, Development Regulations:
(i) Text and Zoning Map
$110
$110
$110
(ii) Text only
$100
$100
$100
C. Individual Chapters of Development Regulations
$10
$10
$10
d. Renton Municipal Code (two volumes)
$400
$400
$400
e. Code Supplements, per year:
(i) Titles I - III and VI - X
$70
$70
$70
(ii) Title IV
$70
$70
$70
7. Miscellaneous Services:
a. Certification and Notary Fees - Clerk's Certification
$10
$10
$10
b. Notary Public Attestation or Acknowledgement or as
$6
$10
$10
otherwise provided for in RCW 42.28.090, per signature
C. Hold Harmless Agreements and other similar documents
$20
$20
$20
not otherwise provided for
d. Lamination of licenses, pictures
$6
$6
$6
e. Community Development Block Grants (CDBG) Loan Program:
(i) Application Fee
$200
$200
$200
(ii) Loan Origination Fee
$150 or 0.25%of
$150 or 0.25% of
$150 or 0.25%of
loan amount,
loan amount,
loan amount,
whichever is
whichever is
whichever is
greater
greater
greater
(iii) Closing Costs (including any legal fees)
50% of total actual
50% of total actual
50% of total actual
costs
costs
costs
8. Miscellaneous Charges for Police Services:
a. Police Reports per page
$0.15
$0.15
$0.15
b. Record Checks (Written Response)
$5
$5
$5
C. Photographs - Digital on CD
$2
$2
$2
d. Photographs - black & white or color -
Cost
Cost
Cost
Cost of developing film
e. Fingerprint Cards
$5
$5
$5
(i) Each additional card
$1
$1
$1
9. Charges for Fire Documents:
a. Fire reports per page
$0.15
$0.15
$0.15
b. Fire investigative report on CD
$2
$2
$2
C. First copy - black & white or color - Cost of developing film
Cost
Cost
Cost
d. Additional copy - black & white or color - Cost of developing film
Cost
Cost
Cost
10. Computer Listings:
a. City of Renton new business list
$10
$10
$10
b. List of all business licenses
$20
$20
$20
C. Copies requested to be faxed, local number
$3
$3
$3
d. Copies requested to be faxed, long distance number
(i) One (1)-five (5) pages
$10
$10
$10
(ii) Six (6) or more pages (ten (10) page limit)
$20
$20
$20
11. Utility Fee:
a. Special Request Water Meter Reading
$30
$30
$30
b. Utility New Account Setup
$25
$25
$25
C. Utility Billing Account Transfer (tenant billing form)
$5
$5
$5
d. Water utility outstanding balance search requested by
$25
$25
$25
fax, messenger, or letter
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
,SECTION• • •) 11 2016 20171
12. Schedule of Fines for False Alarms - Security/Burglar:
a. First, second, and third false alarms in a N/C N/C N/C
registration year*
b. Fourth and fifth false alarms in a registration year*
$50
$50
$50
C. Sixth false alarm and successive false alarms in a
$100
$100
$100
registration year*
d. Late Registration Penalty
$50
$50
$50
e. Late False Alarm Payment Penalty
$25
$25
$25
f. Appeal Hearing Cancellation Fee
$10
$10
$10
*A registration year shall mean January 1 thru December 31 each year.
13. NSF Check Fees
$25
$25
$25
not other tee is due to the city at the same time, the department administrator may authorize to waive the entire amount
due at their discretion.
15. Electronic Records
a. Photocopies or printed copies of electornic records, per page $0 $0
$0.15
b. Scanning paper records, per page $0 $0
$0.10
C. Electronic files or attachments uploaded for electronic delivery (email, cloud -based data storage service, of $0 $0
$0.05
other means of electronic delivery), for each four (4) files
d. Transmission of records in an electronic format or for the use of agency equipment to send the record: $0 $0
$0.10
electronically, per gigabyte (GB)
*The charges identified in RCW 42.56.120(3)(b) (and referenced above) may be combined to the extent that more than one type of charge applies to copies produced i,
response to a particular request. The actual cost of any digital storage media or device provided by the agency. Alternatively, the City may charge a flat fee of up to $2.0c
for the entire request as long as the cost of uploading and transmitting the electronic records is reasonably estimated to equal or exceed that amount. Only one $2.00 fla
fee per request is authorized for electronic records produced in installments. When records are provided electronically on a CD, DVD, thumb drive, flash drive, or other
electronic device, the requestor will be charged for the cost of the electronic storage device. The City may charge an actual -cost service charge for requests that requir
use of IT expertise to prepare data compilations or provide customized electronic access services when not used by the City for other purposes. A cost estimate an(
explanation will be provided to the requestor before incurring the costs.
Option to waive charges. The City may waive charges associated with fulfilling a request. The decision will be based on various factors, including the volume and formal
of the responsive documents. The decision to assess fees for fulfilling a public records request shall be made on a consistent and equitable basis, dependent primarily
upon the amount of staff time required for copying, scanning, shipping, uploading, and/or transmitting the records associated with fulfilling a request.
Certified copies. If the requestor is seeking a certified copy of a City record, an additional charge of $1.00 per each complete document maybe applied to cover thi
additional expense and time required for certification.
II. MAPLEWOOD GOLF COURSE
ISECTION
1. Green Fees:
a. Weekday
(i) 18 Hole
$34
$35
$35
(ii) 9 Hole
$25
$27
$27
(Ill) 18 Hole, Senior
$25
$27
$27
(iv) 9 Hole, Senior
$17
$19
$19
(v) 18 Hole, Junior
$18
$18
$18
(vi) 9 Hole, Junior
$14
$14
$14
b. Weekend:
(1) 18 Hole
$40
$42
$42
(ii) 9 Hole
$25
$27
$27
For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean
the remaining four days of the week.
"Junior" shall mean ages 17 and
under, "Senior" shall mean ages 62 and over.
Off-season and promotional rates determined by management; posted on website.
2. Club Rental
$15
$18
$18
3. Golf Cart Fees:
a. 18 Hole
$28
$30
$30
b. 18 Hole Single Rider
$20
$22
$22
C. 9 Hole
$17
$18
$18
d. 9 Hole Single Rider
$10
$11
$11
e. Trail Fee
$8
$10
$10
4. Driving Range Fees:
a. Large Bucket
$8
$8
$8
b. Small Bucket
$5
$5
$5
C. Warm-up Bucket
$3
$3
$3
S. Lesson Fees:
a. 1/2 Hour Private
$45
$45
$45
b. 1 Hour Private
$65
$65
$65
C. 1/2 Hour Series Private
$160
$160
$160
d. 1 Hour Series Private
$240
$240
$240
e. Group Series
$100
$100
$100
f. 1/2 Hour Private, Junior
$25
$25
$25
g. Playing Lesson(3-hole minimum/9-hole maximum) per hole
$15
$15
$15
!SECTION
1. City Center Parking Garage Fees
Parking rates for retail parking will be as follows:
a. Zero (0) - two (2) hours
N/C
N/C
N/C
b. Two (2) - four (4) hours
$2
$2
$2
C. Four (4) - six (6) hours
$4
$4
$4
d. Six (6) - (10) hours
$6
$6
$6
e. 10 hours or more
$10
$10
$10
f. Monthly pass -holders, tax included
$35
$35
$35
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
,SECTION•UATIC
FEES
2016
20171
1. Admission for the Aquatic Center shall be as follows:
a.
Regular Session:
(i) Resident infants- under 1 year
N/C
N/C
N/C
(ii) Non-resident infants - under 1 year
N/C
N/C
N/C
(iii) Resident youth - 1 to 4 years
$4
$4.50
$4.50
(iv) Non-resident youth -1 to 4 years
$8
$8.50
$8.50
(v) Resident ages 5 and up
$8
$8.50
$8.50
(vi) Non-resident ages 5 and up
$14
$15
$15
(vii) Resident lap swim - water walking only
$3
$3
$3
(viii) Non-resident lap swim - water walking only
$4.50
$4.50
$4.50
b.
Season Pass:
(i) Resident infants- under 1 year
N/C
N/C
N/C
(ii) Non-resident infants - under 1 year
N/C
N/C
N/C
(iii) Resident ages 1 and up
$60
$60
$60
(iv) Non-resident ages 1 and up
$120
$120
$120
C.
Miscellaneous Rates:
(i) Resident regular session per person rate (group rates)*
$10
$10
$10
(ii) Non-resident regular session per person rate
$16
$16
$16
(iii) Locker Rental
$0.25
$0.25
$0.25
*Group Rates: Group rates offer guaranteed admission for the group. In order to qualify for a group rate, the group must consist
of ten (10) or more persons, and the session must be
scheduled in advance. Please note that the number of groups may be limited each day. Staff has the authority to offer discounted daily rates for partial sessions or Renton
-only events.
d.
Canopy Rental Fees*: (includes canopy and admission for one leisure swim session):
(i) Henry Moses Party Tent #1
(10' x 20' for up to twenty-five (25) guests):
(1) Resident Rate, per session
$300
$310
$310
(2) Non-resident Rate, per session
$450
$475
$475
(ii) Henry Moses Party Tent #2
(10' x 10' for up to fifteen (15) guests):
(1) Resident Rate
$200
$200
$200
(2) Non -Resident Rate
$290
$300
$300
*Sales tax not included in the rental fee
e.
Resident Rate all inclusive
$1,500
$1,800
$1,800
f.
Non-resident Rate all inclusive
$1,500
$2,300
$2,300
g.
Swim Lesson Program: Fees and associated descriptions are published in the "What's Happening" Renton Activities Guide
h.
End -of -year School Party Rentals:
(i) Renton School District
(1) 001- 299 students
$1,900
$1,900
$1,900
(2) 300 - 399 students
$2,250
$2,250
$2,250
(3) 400 - 499 students
$2,400
$2,400
$2,400
(4) 500 - 599 students
$2,550
$2,550
$2,550
(ii) Other Schools and Districts
(1) 001- 299 students
$2,450
$2,450
$2,450
(2) 300 - 399 students
$2,850
$2,850
$2,850
(3) 400-499students
$3,150
$3,150
$3,150
(4) 500 - 599 students
$3,360
$3,360
$3,360
2. Boat Launch Rates:
a.
Daily resident - 7 days a week
$10
$10
$10
b.
Daily Non-resident - 7 days a week
$20
$20
$20
C.
Overnight resident - 7 days a week
$20
$20
$20
d.
Overnight Non-resident - 7 days a week
$40
$40
$40
e.
Annual parking permit- resident
$60
$60
$60
f.
Annual parking permit- non-resident
$120
$120
$120
g.
Additional sticker (launching permit)
$5
$5
$5
h.
Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area for weigh in and or electricity at the
$50
$50
$50
current rental rate) per event
1. Outlying Picnic Shelters (Cedar River Trail, Liberty Park, Phillip Arnold Park, Teasdale Park and Heritage Park) Maximum of 50 people:
a.
Resident 8:30am-1:30pm/3:30pm-8:30pm
$90
$90
$90
b.
Non-resident 8:30am-1:30pm/3:30pm-8:30pm
$180
$180
$180
C.
Full day resident 8:30am-sunset
$140
$140
$140
d.
Full day non-resident 8:30am-sunset
$280
$280
$280
2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people:
a.
Resident 8:30am-1:30pm/3:30pm-8:30pm
$100
$100
$100
b.
Non-resident 8:30am-1:30pm/3:30pm-8:30pm
$180
$180
$180
C.
Full day resident 8:30am-sunset
$140
$140
$140
d.
Full day non-resident 8:30am-sunset
$280
$280
$280
e.
South Shelters 1 & 2 Resident rate
$300
$300
$300
f.
South Shelters 1 & 2 Non-resident rate
$600
$600
$600
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
• • •1
20161
3. Gene Coulon Beach Park Shelters (North Shelter):
a. Resident 8:30am-1:30pm/3:30pm-8:30pm
$120
$120
$120
b. Non-resident 8:30am-1:30pm/3:30pm-8:30pm
$240
$240
$240
C. Full day resident 8:30am-sunset under 75 people
$160
$160
$160
d. Full day resident 8:30am-sunset 76 -100 people
$190
$190
$190
e. Full day non-resident 8:30am-sunset under 75 people
$320
$320
$320
f. Full day non-resident 8:30am-sunset 76 -100 people
$380
$380
$380
4. Tennis, Basketball and Sand Volleyball court rate per hour (Tournament Play Only):
a. Tennis court
$10
$10
$10
b. Park basketball court
$10
$10
$10
C. Sand volleyball court
$10
$10
$10
S. Catering and Event Rate (All city parks apply):
a. Resident half day
$200
$200
$200
b. Resident full day
$350
$350
$350
C. Non-resident half day
$400
$400
$400
d. Non-resident full day
$700
$700
$700
6. Inflatable and big toy rate:
a. Each
$50
$50
$50
Note: Along with rental fee for the use of City facility for each inflatable or big toy, Applicant or Renter shall provide proof of insurance naming the City of Renton as additional insured.
7. Open Space Area in the Parks (Cascade, Teasdale, Phillip Arnold, Cedar River, Earlington, Gene Coulon, Glencoe, Kennydale Lions, Sunset, and Riverview Parks):
a. Resident rate per hour $10 $10 $10
b.
Sports field rental per hour - non-resident
$30
$30
$30
C.
Renton Area Youth Sports Agencies, per hour
$6
$6
$6
d.
Field prep for softball/baseball - resident per occurrence
$30
$30
$30
e.
Field prep for soccer - resident per occurrence
$45
$45
$45
f.
Custom Field prep - resident per occurrence
$100
$100
$100
g.
Field prep for softball/baseball - non-resident per occurrence
$35
$35
$35
h.
Field prep for soccer - non-resident per occurrence
$50
$50
$50
L
Custom Field prep - non-resident per occurrence
$100
$100
$100
j.
Field lights all sports - resident per hour
$25
$25
$25
k.
Field lights all sports - non-resident per hour
$30
$30
$30
10. Banquet & Classroom Rental - Community Center & Senior Activity Center:
a.
Friday evening 5 hour minimum - resident
$650
$650
$650
b.
Weekend Rates 10 hour minimum - resident
$1,300
$1,300
$1,300
C.
Extra hours - per hour - resident
$130
$130
$130
d.
Friday 5 hour minimum - non-resident
$750
$750
$750
e.
Weekend Rates 10 hour minimum - non-resident
$1,500
$1,500
$1,500
f.
Extra hours - per hour - non-resident
$150
$150
$150
g.
Kitchen charge - per hour
$100
$100
$100
h.
Banquet Room - Mon - Fri - daytime - resident/hr 3 hour min
$85
$85
$85
L
Banquet Room - Mon - Fri - daytime - non-resident/hr 3 hour min
$90
$90
$90
j.
Damage deposit
$550
$550
$550
k.
Contract violation fee - per hour
$200
$200
$200
I.
Cancellation Fee - Less than 90 days
$550
$550
$550
11. Classroom and Gymnasium Rental - Renton Community Center:
a.
Resident single gym athletic - per hour
$45
$45
$45
b.
Non-resident single gym athletic - per hour
$50
$50
$50
C.
Resident double gym athletic - per hour
$90
$90
$90
d.
Non-resident double gym athletic - per hour
$100
$100
$100
e.
Resident single gym non -athletic
$550
$550
$550
f.
Non-resident single gym non -athletic
$675
$675
$675
g.
Resident double gym non -athletic
$1,100
$1,100
$1,100
h.
Non-resident double gym non -athletic
$1,350
$1,350
$1,350
L
Carpet fee single gym - resident & non-resident
$175
$175
$175
j.
Carpet fee double gym - resident & non-resident
$350
$350
$350
k.
Classroom resident
$35
$35
$35
I.
Classroom Non-resident
$40
$40
$40
12. Birthday Party Packages:
a.
Sports package - resident
$65
$65
$65
b.
Sports package - non-resident
$75
$75
$75
13. Facility Rental - Neighborhood Center:
a.
Meeting room - resident
$35
$35
$35
b.
Gymnasium - resident
$35
$35
$35
C.
Meeting room - non-resident
$40
$40
$40
d.
Gymnasium - non-resident
$40
$40
$40
•�
•uu _ :� o
r
•
r
Fees and associated descriptions are published in the "What's Happening " Renton Activities Guide
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
2. Unaltered Animal Annual License
$0
$50
$50
3. Economically Qualified Resident Special Lifetime License
$0
$0
$0
4. Duplicate Tag
$10
$10
$10
S. Late Charge
$30
$30
$30
*Please note, impounded animals are subject to license fees, microchipping costs, and other out-of-pocket costs as specified in RMC 6-6-2.
X. BUSINESS LICENSES 2016r
ISECTION
1. General Business License (Base fee + Per hour fee = Total fee):
a. Registration Fee $110 $150 $150
b. Per hour fee, for each worker hour* $0.0352 $0.0352 $0.0352
C. Appeal of Business License Decision $0 $250 $250
* Per hour rate shall be adjusted every other year by Seattle -Tacoma -Bremerton, All Items, Urban Wage Earners and Clerical Workers (also known as CPI-W) ending August 31, for
the same two year period.
2. Short Term Employment within the City:
a. A temporary ninety (90) day license maybe purchased for each FTE on a temporaryjob'
*Not to exceed 270 consecutive days
$50
$50
$50
3. Penalties:
a. The penalty to reinstate an expired business license
$50
$50
$50
b. The penalty for failure to obtain a business license*
C. Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of
Chapter 5 of the RMC shall render the business enterprise subject to a penalty of (5%) of the amount of the license fee for
the first month of the delinquency and an additional penalty of (5%) for each succeeding month of delinquency, but not
exceeding a total penalty of (25%) of the amount of such license fee.
$250 +20% $250 +20% $250 +20%
APR on outstanding APR on outstanding APR on outstanding
Fees Fees Fees
5%-25% 5%-25% 5%-25%
* Payment of all license fee amounts still owing for the last three (3) years, plus a penalty of (20%) per annum for all amounts owing, plus any accounting, legal or administrative
expenses incurred by the City in determining the nonreporting, or the unpaid portion over the last (3) years or in collecting the tax and/or penalty.
1. Every person applying for a adult entertainment license shall pay the applicable nonrefundable application fee:
a. Adult Entertainment Business License
$750
$750
$750
b. Entertainer
$75
$75
$75
C. Manager
$75
$75
$75
d. License Replacement
$10
$10
$10
2. Penalties:
a. Civil Penaltv. Der violation
Fees:
a. Building Permit Fees: Building Permit Fees are payable prior to the issuance of a building permit'
(i) Base Fee/Valuation $1.00 to $500.00
(ii) Valuation $501.00 to $2,000.00
(iii) Valuation $2001.00 to 25,000.00
(iv) Valuation $25,001.00 to $50,000.00
(v) Valuation $50,001.00 to $100,000.00
(vi) Valuation $100,001.00 to $500,000.00
(vii) Valuation $500,001.00 to $1,000,000.00
(viii) Valuation $1,000,001.00 and up
$28
$28
$28
$28 + $3.65 x each
$28 + $3.65 x each
$28 + $3.65 x each
$100value
$100value
$100value
$82.75 + $16.75 x
$82.75 + $16.75 x
$82.75 + $16.75 x
each $1,000 value
each $1,000 value
each $1,000 value
$468 + $12 x each
$468 + $12 x each
$468 + $12 x each
$1,000 value
$1,000 value
$1,000 value
$768+$8.35x
$768+$8.35x
$768+$8.35x
each $1,000 value
each $1,000 value
each $1,000 value
$1,185.50 + $6.70 x
$1,185.50 + $6.70 x
$1,185.50 + $6.70 x
each $1,000 value
each $1,000 value
each $1,000 value
$3,865.50 + $5.65 x
$3,865.50 + $5.65 x
$3,865.50 + $5.65 x
each $1,000 value
each $1,000 value
each $1,000 value
$6,690.50 + $4.35 x
$6,690.50 + $4.35 x
$6,690.50 + $4.35 x
each $1,000 value
each $1,000 value
each $1,000 value
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
,SECTIONDEVELOPMENT
FEES (CONTINUED)•
1
1. Building Fees: (continued)
b.
Combination Building Permit Fees*'
(i) Plumbing up to 3,000 sq ft
$150
$200
$200
(ii) Plumbing over 3,000 sq ft
$175
$225
$225
(iii) Mechanical up to 3,000 sq ft
$150
$200
$200
(iv) Mechanical over 3,000 sq ft
$175
$225
$225
(v) Electrical up to 3,000 sq ft
$75
$125
$125
(vi) Electrical over 3,000 sq ft
$100
$150
$150
* Combination Building Permit fees are required for each new single family residential structure, and are payable prior to the issuance of a building permit
C.
Building Plan Check Fee'
(i) Initial Building Plan Check Fee*
$0
65%of permit fee
65%of permit fee
(ii) Additional Building Plan Check Fee
$0
50%of initial plan
50%of initial plan
Check Fee
Check Fee
* Building Plan Check Fee is in addition to the building permit fees and combination building permit fees. The plan check fee is equal to 65%
of the building permit
fee or the
combination building permit fee, payable at the time of building permit application submittal. Includes three (3)
review cycles.
d.
Demolition Permit Fee:
(i) Residential
$115
$118.50
$118.50
(ii) Commercial
$250
$257.50
$257.50
e.
State Building Code Fee:
(i) Non-residential projects:
$4.50
$4.50
$25.00
(ii) Residential projects:
$4.50
$4.50
$6.50
(1) Each additional unit after first unit:
$2
$2
$2
f.
Electrical Permit Fees:
(i) Residential Fees - Single -Family and Duplex
(1) New Service- Single Family and Duplex'
(a) Upto200AMP
$70
$206
$206
(b) Over 200 AMP
$80
$206
$206
(2) Service Changes/New Circuits -Single Family and Duplex:
(a) Change up to 200 AMP
$60
$150
$150
(b) Changeover 200 AMP
$75
$150
$150
(c) Any new circuits added to above price is per each up to a maximum of $80.00
$15
$20
$20
(d) Minimum fee for remodel/addition of new circuits without a service charge
$60
$150
$150
(ii) Multi -Family, Commercial and Industrial Fees:
(1) Value of work:
$1.00 to $500.00
$60
$63
$63
$500.01 to $1,000.00
$45+3.3%of
$47+3.5%of
$47+3.5%of
value
value
value
$1,000.01 to 5,000.00
$78+2.9%of
$82+3.05%of
$82+3.05%of
value
value
value
$5,000.01 to $50,000.00
$223+1.7%of
$234+1.8%of
$234+1.8%of
value
value
value
$50,000.01 to $250,000.00
$1,073 + 1.0% of
$1,127+1.05%of
$1,127+1.05%of
value
value
value
$250,000.01 to $1,000,000.00
$3,573 + 0.8% of
$3,752+0.85%of
$3,752+0.85%of
value
value
value
$1,000,000.01 and up
$11,573 + 0.45% of
$12,152 + 0.47% of
$12,152 + 0.47% of
value
value
value
(iii) Temporary Electrical Services
$60
$150
$150
(iv) Miscellaneous Electrical Fees
(1) Job Trailers
$60
$150
$150
(2) Signs per each
$60
$150
$150
(3) Mobile Homes
$60
$150
$150
(4) Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable
50% of commercial
50% of commercial
50% of commercial
television, etc.)
fees Minimum
fees Minimum
fees Minimum
$60.00
$150.00
$150.00
Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations are exempt from fees
g.
House Moving* - minimum per hour Inspection Fee:
$100
$150
$150
*This covers only the Building Section inspection of the structure prior to move. There is a separate additional fee charged by the Public Works Department to cover the actual
house move permit. A building permit is also required in order to site the structure on the new site.
h.
Inspection Fee For Condominium Conversions
i. Manufactured/Mobile Home Installation Fees*:
(i) Within a manufactured home park
(ii) Outside of a manufactured home park
$100 on 1st unit / $150 on 1st unit / $150 on 1st unit /
$15 each add'I unit $20 each add'I unit $20 each add'I unit
$100 $150 $150
Building Permit Building Permit Building Permit
Fees Fees Fees
* Includes plan review and inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water connection fees are in addition to the below amounts).
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
1. Building Fees: (continued)
j. Mechanical Permit Fees:'
(i) Basic permit fee plus itemized fees below:
$45
$49.50
$49.50
(1) Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air
$17
$18.75
$18.75
conditioner, chiller or Air Handling Unit (VAV) including ducts and vents)
(2) Boiler or Compressor:
(a) Single & Multi Family
$17
$18.75
$18.75
(b) Commercial
$60
$66
$66
(3) Commercial Refrigeration system
$60
$66
$66
(4) Residential ventilation/exhaustfan
$8
$8.75
$8.75
(5) Commercial ventilation/exhaust system not a portion of any heating or air conditioning system
$17
$18.75
$18.75
authorized by a permit.
(6) Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such
$50
$55
$55
hood each
(7) Incinerator: Installation or relocation of each
$75
$82.50
$82.50
(8) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or
$17
$18.75
$18.75
for which no other fee is listed in this code
(9) Fuel Gas Piping:
(a) Each gas -piping system of 1 to 4 outlets
$12
$13.25
$13.25
(b) Each additional outlet over 4, per outlet
$2.50
$2.75
$2.75
k. Plumbing Permit Fees:'
(i) Base fee for all types of work; plus itemized fees below:
$45
$49.50
$49.50
(1) Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap
$8
$8.75
$8.75
(2) For meter to house water service
(3) Fuel Gas Piping:
(a) Each gas -piping system of 1 to 4 outlets
(b) Each additional outlet over 4, per outlet
(4) Per drain for rainwater systems
(5) Per lawn sprinkler system, includes backflow prevention
(6) Per fixture for repair or alteration of drainage or vent piping
(7) Per vacuum breaker or backflow protection device on tanks, vats, etc
(8) Per interceptor for industrial waste pretreatment
(9) Medical Gas Piping:
(a) Each gas -piping system of 1 to 5 outlets
(b) Each additional outlet over 5, per outlet
I. Sign Permit Fees:
(i) Permanent Signs:
(1) Roof, projecting, awning, canopy, marquee, and wall signs
(2) Freestanding ground and pole signs
(ii) Temporary and Portable Signs:
(1) Real Estate Directional Signs, pursuant to RMC 4-4-100J2, permit valid for a 12-months period
(2) Grand Opening Event Signs, pursuant to RMC 4-4-100J6d(i)
(3) Event Signs, pursuant to RMC 4-4-100J6d(ii) and (iii) per sign, per promotion
(4)
A -Frame Signs, pursuant to RMC 4-4-30015 Charge is for the first sign, all subsequent signs are $50.00
(ii) Temporary and Portable Signs: (continued)
(5) Commercial Property Real Estate Banner each sign permit is valid for 12 months.
(6) Decorative Flags fee is per entrance and valid until flag(s) are removed
(iii) Request for Administrative Modifications of City Center Sign Regulations per RMC 4-4-1001-19:
(iv) Work in Advance of Sign Permit Issuance: Where work for which the permit is required by this Title IV of
RMC is started or proceeded with prior to obtaining said permit, the fees above specified shall be doubled;
but the payment of such double fee shall not relieve any persons from complying with the requirements in
the execution of the work nor from any other penalties prescribed herein.
m. Miscellaneous Fees:
(i) Minimum Housing Inspection:
(1) Assessed under the provisions of Section 305.8 of the International Building Code.
(2) WABO-Adult Family Home; Misc building inspection
(ii) Plan Review Fees for Electrical, Plumbing, or Mechanical Permits*
(iii) Reinspection Fee
(iv) Safe and Healthy Housing Program:
(1) Registration Fee
(a) 1- 4 dwelling unit(s), each, per year
(b) 5 - 24 dwelling units, each, per year
(c) 25 or more dwelling units, each, per year
(d) Communal residence, each, per year
(2) City Inspection
(a) Initial inspection
(b) First (1st) reinspection
(c) Second (2nd) reinspection
(d) Third (3rd) reinspection
(3) Contractor Inspection; admin fee to City
(4) Appeal of Inspection
$8
$8.75
$8.75
$12
$13.25
$13.25
$2.50
$2.75
$2.75
$8
$8.75
$8.75
$8
$8.75
$8.75
$8
$8.75
$8.75
$8
$8.75
$8.75
$8
$8.75
$8.75
$60
$66.00
$66.00
$5
$5.50
$5.50
$125
$250
$250
$175
$250
$250
$50
$75
$75
$50
$75
$75
$25
$50
$50
$100
$125
$125
$50
$75
$75
$50
$75
$75
$100
$150
$150
All above fees
All above fees
All above fees
doubled
doubled
doubled
$75 $100 $100
$100 $100 $100
40% of permit fee 40% of permit fee 40% of permit fee
$75/hr $100 $100
N/A
$12
$12
N/A
$10
$10
N/A
$8
$8
N/A
$20
$20
N/A
$50
$50
N/A
$90
$90
N/A
$125
$125
N/A
$200
$200
N/A
$40
$40
N/A
$250
$250
*In addition to the above permit fees, a plan check fee equal to forty percent (40%) of the permit fee may be charged when required by the Building Official.
'Per Resolution 4318, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision often or more lots and
vested as of the adoption date of Res. 4318, through December 31, 2018.
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
ISECTION XII. DEVELOPMENT
FEES (CONTINUED)[
r2018
2. Land Use Review Fees:
a. General Land Use Review:
W
Additional Animals Permit
$50
$50
$50
(ii)
Address Change
N/A
$100
$100
(iii)
Annexation:
(1) Less than 10 acres
N/C
$5,000
$5,000
(2) 10 acres or more
N/C
$2,500
$2,500
(iv)
Appeal (or reconsideration) of:
(1) Hearing Examiner's Decision
$250
$500
$500
(2) Administrative Decision
$250
$500
$500
(3) Environmental Decision
$250
$500
$500
(v)
Binding Site Plan (total fee for both preliminary and final phases)
$2,500
$5,000
$5,000
(vi)
Code Text Amendment
N/C
N/C
N/C
(vii)
Comprehensive Plan Map or Text Amendment (each)
$2,500
$5,000
$5,000
(viii)
Conditional Use Permit:
(1) HEX
$2,500
$3,000
$3,000
(2) Administrative'
$1,000
$1,500
$1,500
(ix)
Critical Areas Exemption
N/C
N/C
N/C
(x)
Critical Areas Permit
N/A
$1,200
$1,200
(xi)
Critical Areas Review Fee: for those projects that propose impacts to critical areas and will be billed at
100% of
100% of
100% of
the cost of contract biologist's review.'
contract cost
contract cost
contract cost
(xii)
Development Agreement
N/A
$10,000
$10,000
(xiii)
100% of cost
100% of cost
100% of cost
Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final'
(xiv)
Environmental Checklist Review
$1,000
$1,500
$1,500
(xv)
Fence Permit (special)
$100
$150
$150
(xvi)
Grading and Filling Permit (Hearing Examiner)
$2,500
$5,000
$5,000
(xvii)
Landscape Review Fee
$100
$150
$150
(xviii)
Legal Lot Segregation
N/C
N/C
N/C
(xix)
Lot Consolidation
N/A
$500
$500
(xx)
Lot Line Adjustment
$450
$1,000
$1,000
(xxi)
Manufactured/Mobile Home Park:
(1) Tentative
$500
$1,000
$1,000
(2) Preliminary
$2,500
$3,000
$3,000
(3) Final
$1,000
$1,500
$1,500
(xxii)
Open Space Classification Request
$100
$150
$150
(xxiii)
Plats:
(1) Short Plat (total fee for both preliminary and final phases)
$2,000
$5,000
$5,000
(2) Preliminary
$4,500
$10,000
$10,000
(3) Final Plat
$1,500
$5,000
$5,000
(xxiv)
Planned Urban Development:
(1) Preliminary Plan
$2,500
$5,000
$5,000
(2) Final Plan
$1,000
$2,500
$2,500
(3) Reasonable Use Exception:
(a) In conjunction with land use permit
N/A
$500
$500
(b) Stand alone
N/A
$1,500
$1,500
(xxv)
Rezone
$2,500
$5,000
$5,000
(xxvi)
Routine Vegetation Management Permit without Critical Areas
$75
$100
$100
(xxvii)
Shoreline -Related Permits:
(1) Shoreline Permit Exemption
N/C
N/C
N/C
(2) Substantial Development Permit
$2,000
$2,500
$2,500
(3) Conditional Use Permit
$2,500
$3,000
$3,000
(4) Variance
$2,500
$3,000
$3,000
(xxix)
Site Development Plan (Site Plan or Master Plan
which includes design review fee for projects subject to RMC 4-3-100):
(1) Hearing Examiner Review
$2,500
$3,500
$3,500
(2) Administrative Review
$1,500
$2,500
$2,500
(3) Modification (minor, administrative)
N/C
$250
$250
(4) Modification (major) required new application and repayment of fee required
Application
Application
Application
Fees
Fees
Fees
(xxx)
Small Cell Permit, per site°
N/A
N/A
$500
(xxxi)
Special Permit (Hearing Examiner)
$2,500
$2,500
$2,500
(xxxii)
Temporary Use Permits:
(1) Tier 1
$75
$100
$100
(2) Tier 2
$150
$200
$200
(xxxiii)
Variance (per each variance requested) Administrative or Hearing Examine[
$1,200
$1,300
$1,300
(xxxiv)
Waiver or Modification of Code Requirements cost is per request
$150
$250
$250
(xxxv)
Zoning Compliance Letter
$400
$450
$450
b. Exception
for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King
County, the King County Land Use
Review Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk's
review.
office for public
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
2. Land Use Review Fees: (Continued)
Per RMC 4-3-05OF7, the City may charge and collect fees from any applicant to cover costs incurred by the city in review of plans, studies, monitoring reports and other documents
related to evaluation of impacts to or hazards from critical areas and subsequent code -required monitoring.
2When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the EIS shall be
prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the applicant(s) of the
projected costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine that the City will contract
directly with a consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such consultants shall be selected by mutual
agreement of the City and applicant after a call for proposals. If a proposal is modified so that an EIS is no longer required, the ERC shall refund any fees collected under this subsection
which remain after incurred costs are paid. The City may collect a reasonable fee from an applicant to cover the cost of meeting the public notice requirements of this Title relating to
the applicant's proposal. The City shall not collect a fee for performing its duties as a consulted agency. The City may charge any person for copies of any document prepared under this
Title, and for mailing the document, in a manner provided by chapter 42.17 RCW.
3Per Resolution 4318, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision often or more lots and
vested as of the adoption date of Res. 4318, through December 31, 2018.
°Prior to issuance of a small cell permit, the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the application,
including plan inspection, and approval, as authorized by RCW 35.21.860(1)(b), as may be amended.
3. Public Works Fees:
a. Franchise Application Fee N/A $5,000 $5,000
'The fixed application fee established herein is intended to cover the City's internal administrative costs in processing and administering the franchise. In addition to the fixed
application fee, the City may require applicants to either directly pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the
franchise agreement. The City may require applicants to deposit funds in advance to cover legal and/or other professional services fees as they are incurred.
Franchise Permit Fees: "'
Unless otherwise specified in a franchise agreement, the fee shall be due and payable at or prior to the time of construction permit issuance. If a franchise agreement
does not specify
the fee amount, the generic fee, as identified in the following table, shall be collected.
(i) Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles
$350
$350
$350
(ii) All other work permit fee plus $60 per hour of inspection.
$350
$350
$350
'Bond required pursuent to RMC 9-10-5
ZThe City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant.
Latecomers' Agreement Application Fees:
(i) Processing fee* (Nonrefundable)
(1) If amount covered by latecomers' is $20,000 or less
$500
$500
$500
(2) If amount covered by latecomers' is between $20,000 and $100,000
$1,000
$1,000
$1,000
(3) If amount covered by latecomers' is greater than $100,OOC
$2,000
$2,000
$2,000
(ii) Latecomers' Agreement -Administration and collection fee
(1) if amount covered by latecomers' is $20,000.00 or less
15%of total
15%of total
15%of total
(2) If amount covered by latecomers' is between $20,000 and $100,000
10%of total
10%of total
10%of total
(3) If amount covered by latecomers' is greater than $100,OOC
5%of total
5%of total
5%of total
(iii) Segregation processing fee, if applicable
$750
$750
$750
*The processing fee is due at the time of application. The administration and collection fee is deducted from each
individual latecomer fee payment and the balance
forwarded to
the holder of the latecomer's agreement pursuant to RMC 9-5, Tender of Fee.
System Development Charge Tables:
(i) Water and Wastewater System Development Charges:
(1) 5/8 x 3/4 inch and 1 inch:
(a) Water service fee'
$3,245
$3,486
$3,727
(b) Fire service fee "'
$422
$450
$477
(c) Wastewaterfee'
$2,242
$2,540
$2,837
(2) 1-1/2 inch:
(a) Water service fee'
$16,225
$17,430
$18,635
(b) Fire service fee "'
$2,110
$2,247
$2,384
(c) Wastewaterfee'
$11,210
$12,700
$14,185
(3) 2 inch:
(a) Water service fee'
$25,960
$27,888
$29,816
(b) Fire service fee "'
$3,376
$3,596
$3,815
(c) Wastewaterfee'
$17,936
$20,320
$22,696
(4) 3 inch:
(a) Water service fee'
$51,920
$53,776
$59,632
(b) Fire service fee "'
$6,752
$7,191
$7,630
(c) Wastewaterfee'
$35,872
$40,640
$45,392
(5) 4 inch:
(a) Water service fee'
$81,125
$87,150
$93,175
(b) Fire service fee "'
$10,550
$11,236
$11,922
(c) Wastewaterfee'
$56,050
$63,500
$70,925
(6) 6 inch:
(a) Water service fee'
$162,250
$174,300
$186,350
(b) Fire service fee "'
$21,100
$22,476
$23,843
(c) Wastewaterfee'
$112,100
$127,000
$141,850
(7) 8 inch:
(a) Water service fee'
$259,600
$278,880
$298,160
(b) Fire service fee "'
$33,760
$35,955
$38,149
(c) Wastewaterfee'
$179,360
$203,200
$226,960
(ii) Storm Water System Development Charges:
(1) New single family residence (including mobile/manufactured homes)'
$1,485
$1,608
$1,718
(2) Addition to existing single family residence greater than 500 square feet (including
mobile/manufactured homes) Fee not to exceed $1,608 (2017) or $1,718 (2018)
0.594 per sq foot
0.641 per sq foot
0.687 per sq foot
2017/2018 Fee Schedule
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
3. Public Works Fees: (continued)
(3) All other uses charge per square foot of new impervious surface, but not less than $1,608 (2017) $0.594 $0.641 $0.687
or $1,718 (2018) per sq foot per sq foot per sq foot
d. System Development Charge Tables: (continued)
' Based upon the size of the fire service (NOT detector bypass meter)
z Unless a separate fire service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate fire service fee will not be charged.
'Per Resolution 4318, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision often or more lots
and vested as of the adoption date of Res. 4318, through December 31, 2018.
Administrative Fees for SDC Segregation Request* $750+ $750+ $750+
administrative administrative administrative
costs costs costs
*The applicant shall pay the City's administrative costs for the preparation, processing and recording of the partial payment of the fee(s). The adminitrative fee is due at the time of
application for special assessment district, and/or latecomer's charge partial payment for each segregation. If the same segregation is used for more than one utility's special
assessment district, and/or latecomer's charge, then only one administrative fee is collected.
Public Works Construction Permit Fees: The following public works construction permit fees, utility permit fees, and miscellaneous charges are payable at or prior to the time of
construction permit issuance.
0) Water Construction Permit Fees:'
(1) Water meter tests for 3/4" to 2" meter $50 $50 $50
(a) Water meter tests on meters 2" or larger
$60deposit+time $60deposit+time $60deposit+time
and materials
and materials
and materials
(b) Open and close fire hydrants for fire flow tests conducted by others.
Time and materials
Time and materials
Time and materials
(c) Water service disconnection (cut at main)
$250
$250
$250
(d) Meter resets
$95
$95
$95
(e) Repair of damage to service
$225
$225
$225
(f) Water main connections
$535
$535
$535
(g) Water main cut and cap
$1,000
$1,000
$1,000
(h) Water quality/inspection/purity tests
$65
$80
$80
(i) Specialty water tests (lead, copper, etc)
Cost of test + $70
Cost of test + $70
Cost of test + $70
processing fee
processing fee
processing fee
Q) Water turn ons/offs after hours
$185
$185
$185
(k) Installation of isolation valve.
$2,000 deposit +
$2,000 deposit +
$2,000 deposit +
time and materials
time and materials
time and materials
(1) New water line chlorination fee. Fee plus $0.15 per lineal foot for any footage after
$250 + $0.15
$250+ $0.15
$250 + $0.15
the first two hundred fifty (250) lineal feet
per lineal
per lineal
per lineal
foot
foot
foot
(m) Miscellaneous water installation fees.
Time and materials
Time and materials
Time and materials
(n) Service size reductions
$50
$50
$50
(o) Installation fees for ring and cover castings
$200
$200
$200
(2) Water meter installation fees — City installed: The following fees are payable at the time of application
for water meter installation(s)
(a) 3/4" meter installed by City within City limits. Installation of stub service and meter setter only.
$3,075
$2,850
$2,850
W 3/4" meter drop in only
$400
$400
$400
(b) 3/4" meter installed by City outside City limits. Installation of stub service and meter setter only.
$3,310
$2,910
$2,910
W 3/4" meter drop in only
$400
$400
$400
(c) 1" meter installed by the City. Installation of stub service and meter setter only
$3,310
$2,850
$2,850
(i) 1" meter drop in only
$460
$460
$460
(d) 1-1/2" meter installed by the City. Installation of stub service and meter setter only
$5,330
$4,580
$4,580
(i) 1-1/2" meter drop in only
$750
$750
$750
(e) 2" meter installed by the City. Installation of stub service and meter setter only
$5,660
$4,710
$4,710
(i) 2" meter drop in only
$950
$950
$950
(3) Water meter processing fees —Applicant installed: For meters larger than 2", the applicant must
NA
$220
$220
provide materials and installs. The City charges a $220.00 processing fee at the time of meter
application.
(4) Hydrant Meter fees: The following fees are payable at the time of application for a hydrant meter
(a) Hydrant meter permit fee
$50
$50
$50
(b) Deposits:
(1) 3/4" meter and backflow prevention assembly.
$300
$500
$500
(ii) 3" meter and backflow prevention assembly.
$800
$2,000
$2,000
(iii) Deposit processing charge, nonrefundable.
$25
$25
$25
(c) Meter rental (begins on day of pickup):
(i) 3/4" meter and backflow prevention assembly. Per month.
$11.66
$50
$50
(ii) 3" meter and backflow prevention assembly. Per month.
$143.67
$250
$250
(ii) Wastewater and Surface Water Construction Permit Fees'
(1) Residential:
(a) Wastewater permit fee
$250
$300
$300
(b) Surface water permit fee
$250
$300
$300
(2) Commercial:
(a) Wastewater permit fee
$300
$300
$300
(b) Surface water permit fee
$300
$300
$300
(3) Industrial:
(a) Wastewater permit fee
$300
$300
$300
(b) Surface water permit fee
$300
$300
$300
2017/2018 Fee Schedule 10
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
3. Public Works Fees: (continued)
f. Public Works Construction Permit Fees: The following public works construction permit fees, utility permit fees, and miscellaneous
charges are payable at or prior to the time of
construction permit issuance. (continued)
(ii) Wastewater and Surface Water Construction Permit Fees' (continued)
(4) Repair of any of the above
(a) Wastewater permit fee
$200
$300
$300
(b) Surface water permit fee
$200
$300
$300
(5) Cut and cap/Demolition permit:
(a) Wastewater permit fee
$250
$300
$300
(b) Surface water permit fee
$250
$300
$300
(6) Reinspection for Watewater or Surface Water Permit<
N/C
$300
$300
(7) Ground water discharge (temporary connection to wastewater system for discharge of contaminated
$300
$300
$300
ground water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on
plus King
plus King
plus King
discharged amount (meter provided by property owner)
County
County
County
sewer rate on
sewer rate on
sewer rate on
discharged
discharged
discharged
(iii)
amount
amount
amount
Work in right-of-way- construction permit: Utility and street/sidewalk improvements: A bond is required, as stipulated in RMC 9-10-5, Street Excavation Bond.
(1) Less than 35 feet in length
$100
$100
$100
(2) 35 to 100 feet in length
$125
$125
$125
(3) Greater than 100 feet in length
$150
$150
$150
(4) Wastewater or storm water service
$150
$300
$300
(5) King County ROW Permits/Inspections:
(a) Service Installation Only
$600
$1,000
$1,000
(b) Utility Extension per 100' of Length (Min 200' Length)
$300
$500
$500
(iii) Work in right-of-way- construction permit: Utility and street/sidewalk improvements: A bond is required,
as stipulated in RMC 9-10-5,
Street Excavation
Bond.
(continued)
(iv) Street light system fee, per new connection to power system (payable at or prior to the time of
$500
$500
$500
construction permit issuance)
Exception: No permit fee shall be charged for individual homeowners for work in street rights -of -way for street tree or parking strip irrigation systems.
'Per Resolution 4318, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision often or more lots
and vested as of the adoption date of Res. 4318, through December 31, 2018.
Public works plan review and inspection feed'': All developers, municipal or quasi -municipal entities, or utility corporations or companies, except those specifically exempted, shall pay
fees under this Section. Exempted entities include City -franchised cable TV, cable modem, natural gas, telecommunications, and electrical power. Half of this fee must be paid upon
application and the remainder when the permit(s) is issued. There are additional construction permit fees which are also payable upon issuance. The fee will be based upon percentages
of the estimated cost of improvements using the following formula.
0) Street and utility plan review and inspection fees; estimated construction cost: The applicant must submit separate, itemized cost estimates for each item of
improvement subject to the approval by the Public Works Plan Review Section.
(1) $150,000.00 or less
6% of cost 6% of cost 6% of cost
(2) Over $150,000.00 but less than $300,000.00. $9,000 + 5% over $9,000 + 5% over $9,000 + 5% over
$150,000 $150,000 $150,000
(3) $300,000.00 and over.
$16,500+4%over $16,500+4%over $16,500+4%over
$300,000 $300,000 $300,000
(ii) Standard or minor drainage adjustment review $550 $550 $550
'Includes three (3) review cycles. Additional reviews will be charged $1,500 each.
2Construction cost, also known as the Engineer's Estimate or the Contractor's Bid, shall mean cost estimate for all project related improvements outside of the building envelopes,
including, but not limited to, all costs required to construct the following: paved parking lots, private sidewalks or walkways; private and public storm water management facilities;
temporary erosion and sedimentation control facilities; water quality facilities; public and private streets; public and private sanitary sewers; public water main improvements;
required off -site street, bike and pedestrian improvements; street lighting improvements; required landscaping and street tree improvements; and site grading and mobilization
costs.
3The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant.
Grade and Fill License Fees: Fees shall be based on Tier.
Grade and Fill Quantity
Cleared or Distrurbed
New or Replaced Hard Surface
Tier
< 50 cy
< 7,000 sf
< 2,000 sf
1
50 cy - 499 cy
7,000 sf - < 3/4 acre
2,000 sf - 4,999 sf
2
500 cy - 4,999 cy
3/4 ac - < 1 ac
5,000 sf - < 1 ac
3
5,000 cy - 49,999 cy
1ac-<2.5ac
1ac-<2.5ac
4
50,000 cy - 99,999 cy
2.5ac-<5ac
2.5ac-<5ac
5
100,000 cy and larger
5 ac and larger
5 ac and larger
6
(i) Review/Intake Feel:
(1) Tier 1
(2) Tier 2
(3) Tier 3
(4) Tier 4
(5) Tier 5
(6) Tier 6
(ii) Inspection/Issuance Fee 2:
(1) Tier 1
(2) Tier 2
(3) Tier 3
(4) Tier 4
(5) Tier 5
(6) Tier 6
N/A
$155
$155
N/A
$466
$466
N/A
$621
$621
N/A
$932
$932
N/A
$1,242
$1,242
N/A
$1,553
$1,553
N/A
$148
$148
N/A
$444
$444
N/A
$887
$887
N/A
$1,183
$1,183
N/A
$2,366
$2,366
N/A
$3,550
$3,550
2017/2018 Fee Schedule 11
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
3. Public Works Fees: (continued)
h. Grade and Fill License Fees: Fees shall be based on Tier. (continued)
ON
1.5 x plan 1.5 x plan 1.5 x plan
Solid Waste Fills:
checkfee checkfee checkfee
The plan check fee for solid waste fills shall be one and one-half (1-1/2) times the plan checking fees
listed above. The fee for a grading license authorizing additional work to that under a valid license shall
be the difference between the fee paid for the original license and the fee shown for the entire project.
(iv) Annual Licenses of Solid Waste Fills:
1.5 x plan 1.5 x plan 1.5 x plan
The fee for annual licenses for solid waste fills shall be one and one-half (1-1/2) times the plan
checkfee checkfee checkfee
checking fees listed above. The fee for a grading license authorizing additional work to that under a
valid license shall be the difference between the fee paid for the original license and the fee shown for
the entire project. Any unused fee may be carried forward to the next year. If any work is done before
the license is issued, the grading license fee shall be doubled.
Intake/review fees are payable at the time of application.
'Inspection/Issuance fees are payable at the time of issuance.
I. Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9-1 RMC, Easements
(i) Filing fee, payable at the time of application
$250 $250 $250
(ii) Processing fee (paid upon Council approval of release of easement)
$250 $250 $250
j. Right -of —Way use permit fees & Revocable permits for the Use of Excess Public Right -of way: These fees are payable at the time of application. The imposition, collection, payment and
other specifics concerning this charge are detailed in chapter 9-2 RMC, Excess Right -of Way Use.
(i) Single family and two family uses annually, fee plus leasehold excise taxl if applicable
$10.00 + LET' $10.00+ LET' $10.00 + LET'
(ii) All uses without public benefit fee is a per month charge based on property value2 of land to be utilized,
plus leasehold excise taxi, if applicable. Payable yearly in advance
0.5%x Value' LET' 0.5% x Value' LET' 0.5%x Value' LET'
(iii) Uses with public benefit fee is a per year of assessed value of land adjoining the property, plus leasehold
excise tax1, if applicable. In no case less than $10.00. Payable yearly in advance.
0.5%x Value' LET' 0.5% x Value' LET' 0.5%x Value' LET'
(iv) Insurance Required:
Public Liability and property damage insurance is also required pursuant to RMC 9-2-513, Minimum Permit
Requirements for Excess Right -of -Way Use.
(v) Exception for Public Agencies:
a no -fee permit may be issued only when the applicant is a public agency and when the proposed use of the right-of-way provides a direct service to the public
(e.g., Metro applications for right-of-way for bus shelters).
'There is hereby levied and shall be collected a leasehold excise tax on that act or privilege of occupying or using public owned real or personal property through a leasehold
interest at the rate established by the State of Washington
'Right-of-way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor
Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9-14 RMC, Vacations
(i) Filing fee, payable at the time of application $500 $500 $500
(ii) Processing and completion fee, payable upon Council approval of the vacation and upon administrative
determination of appraised value of vacated right-of-way.
Appraised Value of Vacated right-of-way:
(1) Less than $25,000 $750 $750 $750
(2) $25,000 to $75,000 $1,250 $1,250 $1,250
(3) Over $75,000 $2,000 $2,000 $2,000
Temporary connections to a City utility system may be granted for a one-time, temporary, short-term use of a portion of the property for a period not to exceed three (3) consecutive
years:
Storm Water Fee; Fee equal to thirty percent (30%) of the current system development charge
10% of system
30% of system
30% of system
0) applicable to that portion of the property.*
development
development
development
charge
charge
charge
(ii) Wastewater Fee; Annual fFee equal to thirty percent (30%) of the current system development charge
10% of system
30% of system
30% of system
applicable to the size of the temporary domestic water meter(s).*
development
development
development
charge
charge
charge
(iii) Water Fee;Annual fFee equal to thirty percent (30%) of the current system development charge
10% of system
30% of system
30% of system
applicable to the size of the temporary water meter(s).*
development
development
development
charge
charge
charge
*Fee shall be paid annually (non -prorated), and shall be nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a
credit to the
system development charge due at the time of permanent use of the utility system. The application for temporary connection shall consist of a detailed plan and
a boundary line
of the proposed development service area for use in the fee determination.
m. Water or Sewer - Redevelopment:
Credit for existing water or sewer service: Any parcel that currently has water and or sewer service is eligible for a prorated
system development
charge
0) Feels) based upon meter(s) proposed for final project minus feels) based upon meter existing on site.
n. Miscellaneous Fees:
0) Re -inspection Fee
N/A
$100
$100
(ii) Plan Revision following Permit Issuance:
(1) Minor
N/A
$250
$250
(2) Major
N/A
Application Fee
Application Fee
(iii) Street Frontage Improvements Fee -In -Lieu:
(1) Street with existing storm drainage main line
N/A
$107/LF
$307/LF
(2) Street with existing conveyance ditch
N/A
$122/LF
$122/LF
2017/2018 Fee Schedule 12
Return to the Table of Contents
City of Renton Fee Schedule
2017-2018
4. Technology Surcharge Fee
3.0%
3.0%
5.0%
An additional technology surcharge shall be required for all fees included in the following Subsections of Section XII,
Development Fees, of the City of Renton Fee Schedule Brochure: Subsection 1, Building Fees; Subsection 2, Land Use
Review Fees, except for appeals, critical areas review fee, and direct EIS costs; Subsections b, e, f, g and h of subsection 3,
Public Works Fees; and Section XIII, Fire Department Fire Marshall Fees
S. Impact Fees:
a. School Impact Fees:
(i) Issaquah School District
(1) Single Family Fee
$4,635
$7,921
$8,762
(2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)
$1,534
$2,386
$3,461
(ii) Kent School District
(1) Single Family Fee
$4,990
$5,100
$5,235
(2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)
$2,163
$2,210
$2,267
(iii) Renton School District
(1) Single Family Fee
$5,643
$6,432
$7,772
(2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)
$1,385
$1,448
$1,570
b. Transportation Impact Fees:'
(i) Light Industrial, per sq foot
$3.69
$4.75
$4.75
(ii) Apartment, per dwelling & Accessory Dwelling Unit (ADU)
$1,923.83
$3,358.55
$3,358.55
(iii) Church, per sq foot
$1.70
$2.68
$2.68
(iv) Coffee/Donut Shop, no drive up, per sq foot
N/A
$110.55
$110.55
(v) Coffee/Donut Shop, with drive up, per sq foot
N/A
$116.12
$116.12
(vi) Condominium & Duplexes per dwelling
$1,546.31
$2,822.61
$2,822.61
(vii) Convenience market - 24 hour, per sq foot
$26.84
$110.91
$110.91
(viii) Daycare, per sq foot
N/A
$48.88
$48.88
(ix) Drinking Place, per sq foot
N/A
$30.77
$30.77
(x) Drive-in bank, per sq foot
$17.26
$69.89
$69.89
(xi) Fast food, no drive -up, per sq foot
$22.65
$70.93
$70.93
(xii) Fast food, with drive -up, per sq foot
$27.66
$90.36
$90.36
(xiii) Gas station with convenience store, per pump
$8,588.71
$32,656.54
$32,656.54
(xiv) Gas station, per pump
$8,033.75
$43,661.15
$43,661.15
(xvi) General office, per sq foot
$5.10
$7.29
$7.29
(xvii) Health/fitness club, per sq foot
$6.85
$18.01
$18.01
(xviii) Hospital, per sq foot
$3.02
$3.90
$3.90
(xix) Hotel, per room
$1,952.79
$2,143.76
$2,143.76
(xx) Manufacturing, per sq foot
$2.78
$3.58
$3.58
(xxvi) Marina, per boat berth
$476.56
$1,143.34
$1,143.34
(xxi) Medical office, per sq foot
$9.39
$16.47
$16.47
(xxii) Mini -warehouse, per sq foot
$0.99
$1.29
$1.29
(xxiii) Mobile home, per dwelling
$1,662.92
$3,215.64
$3,215.64
(xxiv) Motel, per room
$1,555.62
$1,965.11
$1,965.11
(xxv) Movie theater, per seat
$6.09
$321.57
$321.57
(xxvii) Nursing home, per bed
$494.92
$893.23
$893.23
(xxviii) Restaurant: sit-down, per sq foot
$11.58
$30.48
$30.48
(xxix) Senior housing- attached, per dwelling
$384.76
$1,464.90
$1,464.90
(xxx) Shopping center, per sq foot
$3.33
$13.29
$13.29
(xxxi) Single family house, per dwelling
$2,951.17
$5,430.85
$5,430.85
(xxxii) Supermarket, per sq foot
$11.83
$32.91
$32.91
C. Park Impact Fees:'
(i) Single family
$1,887.94
$2,740.07
$2,740.07
(ii) Multi -family: 2 units, Duplexes, & Accessory Swelling Unit (ADU)
$1,532.56
$2,224.29
$2,224.29
(iii) Multi -family: 3 or units
$1,458.52
$2,116.84
$2,116.84
(iv) Multi -family: 5 or more units
$1,280.84
$1,858.95
$1,858.95
(v) Mobile home
$1,340.06
$1,944.91
$1,944.91
d. Fire Impact Fees:
(i) Residential - single family (detached dwellings & duplexes), per dwelling unit
$495.10
$718.56
$829.77
(ii) Residential - multi family & Accessory Dwelling Unit (ADU), per dwelling unit
$495.10
$718.56
$964.53
(iii) Hotel/motel/resort, per sq foot
$0.65
$0.94
$1.29
(iv) Medical care facility, per sq foot
$5.56
$8.04
$3.92
(v) Office, per sq foot
$0.14
$0.21
$0.26
(vi) Medical/dental office, per sq foot
$0.87
$1.26
$1.99
(vii) Retail, per sq foot
$0.61
$0.88
$1.25
(viii) Leisure facilities, per sq foot
$1.36
$1.98
$2.36
(ix) Restaurant/lounge, per sq foot
$1.84
$2.67
$5.92
(x) Industrial/manufacturing, per sq foot
$0.08
$0.12
$0.15
(xi) Church/non-profit, per sq foot
$0.25
$0.36
$0.56
(xii) Education, per sq foot
$0.45
$0.66
$0.72
(xiii) Special public facilities, per sq foot
$3.33
$4.83
$4.48
is per unit
'(iii)-(xiii) is per square foot
Per Resolution 4318, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision often or more and
vested as of the adoption date of Res. 4318, through December 31, 2018.
2017/2018 Fee Schedule 13
City of Renton Fee Schedule
2017-2018
Return to the Table of Contents
a. Fire plan review and inspection fees:
(i) $0 to $249.99
(ii) $250.00 to $999.99
(iii) $1,000.00 to $4,999.99
(iv) $5,000.00 to $49,999.99
(v) $50,000.00 to $99,999.99
(vi) $100,000.00 and above
(vii) Construction Re -inspection. Fee is per hour with a 2 hour minimum. The minimum may be assessed if
the requested inspection does not meet the approval of the inspector.
(viii) Violation/Second Re -Inspection after 30-day period (whenever 30 days or more have passed since Fire
Department notification of a violation, which required a first re -inspection, and such violation has not
been remedied or granted an extension)
(ix) Third Re-Inspection/Pre-Citation Follow -Up Inspection when re -inspections are required beyond the
first and second re -inspections
(x) Preventable Fire alarm fee:
(1) First, second, and third preventable alarms
(2) Fourth and fifth preventable alarms in a calendar year, fee is per each alarm
(3) Sixth preventable alarm and successive preventable alarms in a calendar year, fee is per each
alarm.
(xi) Late Payment Penalty
b. Fire Permit type:
(i) Operational fire code permit (issued in accordance with Section 105.6 of the IFC) fee is yearly (includes
items such as fire special events, covered stages, mobile food facilities, hot works, etc.)
(ii) Hazardous materials and HPM facilities yearly
(iii) Construction permit:
(iv) Replacement for lost permit, per each
(v) Hazardous production materials permit (for businesses storing, handling, or using hazardous production
materials as regulated in the fire code) permit is yearly
(vi) Underground tank removal permit (commercial)
$30 $30 $35
$30+2%of the $30+2%of the $35+2%of the
cost cost cost
$50+2%of the $50+2%of the $60+2%of the
cost cost cost
$150+1.5%ofthe $150+1.5%ofthe $175+1.5%ofthe
cost cost cost
$350+1.2%ofthe $350+1.2%ofthe $400+1.2%ofthe
cost cost cost
$800+.75%ofthe $800+.75%ofthe $900+.75%ofthe
cost cost cost
$75 $75 $125
$150 $150 $150
$250 $250 $250
N/C N/C N/C
$70 $70 $75
$150 $150 $150
$35 $35 $35
$84 $84 $100
$150 $150 $175
20% of plan review 20% of plan review 20% of plan review
fee Min.$50 fee Min.$51 fee Min.$52
$35 $35 $35
$150 $150 $175
See Fire plan See Fire plan See Fire plan
review and review and review and
construction construction construction
permit fees permit fees permit fees
(vii)
Underground tank removal or abandonment -in- place permit (residential)
$84
$84
$84
(viii)
Other requested inspection when not required by the fire code. Fee is per hour with a minimum 1 hr
when approved by the Fire Marshal, such as home daycares
N/A
N/A
$125
(ix)
NSF check fees
N/A
N/A
$25
(xi)
RFA technology surcharge fee applied to Fire Department Fire Marshal Fees, subsection a. (i, ii, iii, iv, v,
N/A
N/A
3%
vi) and subsection b. (iii)
2017/2018 Fee Schedule 14