HomeMy WebLinkAboutC_DOE_Letter_180725.pdf July 25, 2018 State Department of Ecology Northwest Regional Office 3190 160th Ave SE Bellevue, WA 98008-5452 SUBJECT: Shoreline Substantial Development Permit for I-405, Tukwila to Renton Improvement Project, Stage 3 File No. LUA17-000810, SM, CAR Dear Sir or Madam: Enclosed is the Shoreline Substantial Development Permit (SSDP) for the above referenced project. The permit was issued by the City of Renton on July 11, 2018. WSDOT (SEPA lead agency), issued a Determination of Non-significance (DNS) and Adoption of Existing Environmental Document for the I-405 Corridor Program in March 2008. We are filing this action with the Department of Ecology and the Attorney General per WAC 173-14- 090. Please review this permit and attachments and contact me at (425) 430-7289 if you have any questions or need additional information. Sincerely, Clark H. Close Senior Planner Enclosures: Shoreline Management Act Permit Data Sheet Copy of Submitted Land Use Master Application Copy of Submitted Project Narrative Copy of Project Description Maps Staff Report and Decision (dated July 11, 2018) with Exhibits 1-19 cc: Office of Attorney General Karen Walter, Muckleshoot Indian Tribe Fisheries Dept. Vanessa Dolbee, Current Planning Manager Linda J. Cooley, Washington State Department of Transportation / Applicant Shoreline Management Act Permit Data Sheet and Transmittal Letter From: (local government) To: (appropriate Ecology office) City of Renton Misty Blair Transmittal Date: 7/25/2018 Receipt Date: (provided by Ecology) Type of Permit: (Indicate all that apply) Substantial Development Conditional Use Variance Revision Other Critical Areas Applicant Information: Name: Linda J. Cooley, WSDOT/I-405 Team Address: 600 108th Ave NE, Suite 405, Bellevue, WA 98004 Phone(s): 425-456-8586 Local Government Decision: Approval Conditional Approval Denial Applicant's Representative: (If primary contact) Name: Kimberly Toal, WSDOT/I-405 Team Address: 600 108th Ave NE, Suite 900, Bellevue, WA 98004 Phone(s): 425-450-2721 Is the applicant the property owner? Yes No Location of the Property: (Section, township, and range to the nearest ¼, ¼ section or latitude and longitude, and a street address where available.) SW 1/4 of Section 17, Township 23N, Range 5E, WM. Assigned project address: I-405 MP 0.0 to MP 4.0, Cedar River Crossing, Renton, WA 98057. Water Body Name: Cedar River Shoreline of State Significance: Yes No Environment Designation: Shoreline High Intensity and Shoreline Urban Conservancy Project Description: (Summary of the intended use or project purpose) WSDOT Northwest Region is proposing roadway, bridge and trail realignment work as part of the I-405, Tukwila to Renton Improvement Project, Stage 3. The west side of the southbound I-405 lanes north of SR 169 would be widened to accommodate an additional lane in each direction. Construction work is anticipated to start in 2019 and the project is expected to open to traffic in 2024. The project would use the design-build project delivery method. Disturbed areas would be restored onsite as much as feasible; however, up to 6,000 square feet of total riparian impacts would be mitigated for offsite at Ron Regis Park in Renton as potential Cedar River buffer enhancements. Notice of Application Date: 12/8/2017 Final Decision Date: 7/11/18 By: (Local government primary contact on this application) Clark H. Close, Senior Planner Phone: 425-430-7289 Local permit no. LUA17-000810 State permit no. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Planning Division LAND USE PERMIT MASTER APPLICATION PROPERTY OWNER(S)PROJECT INFORMATION NAME: PROJECT OR DEVELOPMENT NAME: ADDRESS: PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE: CITY:ZIP: TELEPHONE NUMBER:KING COUNTY ASSESSOR’S ACCOUNT NUMBER(S): APPLICANT (if other than owner) NAME: EXISTING LAND USE(S): COMPANY (if applicable): PROPOSED LAND USE(S): ADDRESS: EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: CITY:ZIP: PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable) TELEPHONE NUMBER:EXISTING ZONING: CONTACT PERSON PROPOSED ZONING (if applicable): NAME: SITE AREA (in square feet): COMPANY (if applicable): SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE DEDICATED: ADDRESS: SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS: CITY:ZIP: PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET ACRE (if applicable) TELEPHONE NUMBER AND EMAIL ADDRESS:NUMBER OF PROPOSED LOTS (if applicable) NUMBER OF NEW DWELLING UNITS (if applicable): 1 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Master Application.doc Rev: 0 /2015 Print Form Reset Form Save Form Washington State Department of Transportation Bellevue 98004 (425)456-8586 Washington State Department of Transportation (WSDOT)/I-405 Team 600 - 108th Avenue NE, Suite 405 Bellevue 98004 I-405 Tukwila to Renton Improvement Project WSDOT ROW - no applicable parcel numbers State Highway State Highway N/A N/A N/A N/A N/A Cedar River - Shoreline Cooley, Linda J. 600 - 108th Avenue N.E., Suite 405 Kimberly Toal I-405 Team 600 - 108th Avenue N.E., Suite 900 Bellevue 98004 (425)450-2721 toalk@consultant.wsdot.wa.gov (425) 456-8586 (206) 769-7481 Commercial, Resource Conservation N/A N/A 58,000 sq ft I-405 MP 0.0 to MP 4.0 Cedar River crossing, 98507 RECEIVED 11/28/2017 cclose PLANNING DIVISION PROJECT INFORMATION (continued) NUMBER OF EXISTING DWELLING UNITS (if applicable):PROJECT VALUE: SQUARE FOOTAGE OF PROPOSED RESIDENTIAL BUILDINGS (if applicable): IS THE SITE LOCATED IN ANY TYPE OF ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE (if applicable): SQUARE FOOTAGE OF EXISTING RESIDENTIAL BUILDINGS TO REMAIN (if applicable):AQUIFER PROTECTION AREA ONE AQUIFER PROTECTION AREA TWO FLOOD HAZARD AREA _21,000_ sq. ft. GEOLOGIC HAZARD _______ sq. ft. HABITAT CONSERVATION SHORELINE STREAMS & LAKES WETLANDS ______ sq. ft. SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL BUILDINGS TO REMAIN (if applicable): NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if applicable): NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW PROJECT (if applicable): LEGAL DESCRIPTION OF PROPERTY (Attach legal description on separate sheet with the following information included) ___,_____SITUATE IN THE ___NW_____ QUARTER OF SECTION _ TOWNSHIP _, RANGE _ _, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON AFFIDAVIT OF OWNERSHIP I, (Print Name/s) , declare under penalty of perjury under the laws of the State of Washington that I am (please check one) ____ the current owner of the property involved in this application or ____ the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing statements and answers herein contained and the information herewith are in all respects true and correct to the best of my knowledge and belief. Signature of Owner/Representative Date Signature of Owner/Representative Date STATE OF WASHINGTON ) ) SS COUNTY OF KING ) I certify that I know or have satisfactory evidence that signed this instrument and acknowledge it to be his/her/their free and voluntary act for the uses and purpose mentioned in the instrument. Dated Notary Public in and for the State of Washington Notary (Print): My appointment expires: 2 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Master Application.doc Rev: 0 /2015 N/A N/A N/A N/A N/A N/A X _______ sq. ft. 6,000_sq. ft. S17 23N 5E N/A x Linda J. Cooley X X $890 million COUNTY OF KING Date’Signature of Owner/Representative I certify that I know or have satisfactory evidence that LtN-D/k C.._o°L’(signed this instrument and acknowledge it to be his/her/their free and voluntary act for the uses and puiose mentioned in the instrument.- 7&77 of my knowledge and belief. gneO/Representati 0 v 2.2o I ATE OF WASHINGTON) )SS Date Dated —--- Notary Public State of Washington FREDA CLARK My Appointment Expires Apr 2,2018 Notary P&Iic in and for the State of Washington Notary (Print): y appointment expires: 2 7 1 Project Name: I-405, Tukwila to Renton Improvement Project, Stage 3 Size and Location of Site: The existing I-405 bridge over the Cedar River in the City of Renton will be replaced with a single span bridge, and the west side of the southbound lanes of I-405 north side of SR 169 widened. Total riparian impacts on either side of the river will amount to 6,000 square feet. Bridge Location: Latitude: 47°28'50.91"N, Longitude: 122°11'59.29"W Land Use Permits Required for Proposed Project: Master Land Use Permit, Critical Areas Permit for Aquifer Protection Zoning Designation of the Site and Adjacent Properties:  Northwest – Commercial arterial  Southwest – Commercial downtown  Northeast – Commercial office residential  Southeast – Resource conservation Note that WSDOT has authority to design and construct state highways within WSDOT ROW. WSDOT design manuals address steep slopes and seismic hazards, and WSDOT’s design will comply with the substantive requirements of the City of Renton’s critical areas ordinance. Current use of the site and any existing improvements: The proposed work area is part of a complex of multiple transportation crossings that include the Houser Way bridge and a BNSF bridge to the west of the I-405 north and southbound lanes. Land use and ownership adjacent to the I-405 corridor includes Renton Old City Hall on the south bank and Liberty Park and Cedar River Park on the north bank. Special site features (i.e., wetlands, water bodies, steep slopes: The I-405 bridge crosses the Cedar River, an anadromous fish-bearing stream approximately 1.62 miles upstream of its outlet into Lake Washington. Statement addressing soil type and drainage conditions: Soils in the vicinity of the bridge include alluvium composed of sand, silt, and clay deposited by the Green River and sand and gravel with thin beds of silt and clay deposited by the Cedar River; Pilchuck sandy loam in the low areas beyond the north bank; and Alderwood and Kitsap soils on very steep slopes to the southeast. Pilchuck sandy loam is an excessively drained soil with high water transmittal rates, and both Kitsap and Alderwood soils are moderately well-drained. Proposed use of the property and scope of the proposed development: The west side of the southbound I-405 bridge will be widened to accommodate additional lanes. 2 For plats, indicate the proposed number, net density, and range of sizes (net lot area) of the new lots: Not applicable to this project. Access: From I-5 take I-405 to Exit 4, WA 169; take the first right from WA 169 south into Cedar River Park on the northeast side of the bridge. Proposed off-site improvements (i.e., installation of sidewalks, fire hydrants, sewer main, etc.): Minor off-site improvements may include pavement markings, drainage improvements, permanent signing, illumination, intelligent transportation systems and ramp metering, barriers, and tolling gantries. Total estimated construction cost and estimated fair market value of the proposed project: I-405 bridge widening and relocation work is part of the larger I-405 Renton to Bellevue Express Toll Lanes Project for which the total cost is estimated at $890 million. The Tukwila to Renton estimated construction cost is $308 million. Estimated quantities and type of materials involved if any fill or excavation is proposed: The proposed plan does not require added fill materials within the Cedar River floodplain. Disturbed areas are to be restored to the existing grade. There may be minor amounts of fill (approximately 100 cubic yards) in some locations associated with final grading. Number, type, and size of any trees to be removed: A registered landscape architect will prepare a tree inventory and restoration plan once the design build contractor has been hired. Maps showing the location of proposed tree planting areas, and a list of replacement species has been included in Attachment 5 – Tree Impacts and Restoration Plan. Explanation of any land to be dedicated to the City: Not applicable to this project. Any proposed job shacks, sales trailers, and/or model homes: Construction offices and staging areas will be within the WSDOT right-of-way to the extent possible. Any proposed modifications being requested (include written justification): None are being requested. Distance from closest area of work to the ordinary high-water mark (for projects within 200 feet of the Cedar River): The closest bridge pier will be approximately 30 feet landward of the ordinary high-water mark on the left (south) bank, and 80 feet on the right (north) bank. Description of the nature of the existing shoreline: Vegetation under the I-405 and other bridges is limited to shrubs, blackberry, and a few trees. River banks downstream and on the south side of the upstream channel support mixed vegetation 3 consisting of Douglas fir, big-leaf maple, red alder, black cottonwood, and blackberry. Upstream, the north bank is stabilized by cement bulkheads along the shoreline of the Renton Community Center. Work over and adjacent to the Cedar River will occur within the Shoreline High Intensity shoreline designation. ! ! !! ! ! §¨¦405 §¨¦5 UV518N 4 t h StN 4 t h StWesternProjectLimit Gillam Creek Southcenter Blvd Klickitat Dr SouthcenterParkwayW e s t f i e l dSouthcente r T u k w i l aCityHall Tukwila ParkwayN 4 t h StN 4 t h StS 1 5 2 n d S t51st Ave SC r y s t a lSpringsPark 51st Ave SS 1 6 0 t h S t 62nd Ave ST U K W I L A S E A T A C Sl adeWayI-405 SouthboundExtend southbound HOV to west MP 0.1 MP 0.2 MP 0.3 MP 0.4 MP 0.5 MP 0.6 TUKWILA RENTON§¨¦405 UV169§¨¦5 UV167UV181 UV518 SEATAC 1 2 3 !Mile Post (MP) Proposed LaneStriping Proposed RetainingWall Proposed AdditionalPavement ProposedStormwaterTreatment Facility Proposed BridgeStructure Railroad Trail Stream or NaturalDrainage Park Muncipality TRIP Stage 2 Lane Striping Stream Realignment / 0 500 Feet ! ! ! ! ! ! ! ! ! ! ! !§¨¦405 UV167N 4 th S tN 4 th S t SW 19th St Lake Ave S S 15th St Benson Rd S S Grady Wa yRainierAveS RentonCityHall S 6th St BurnettLinear Park Talbot HillReservoirPark S Puge t D r T h u n d e r Hill s Cr e e kN 4 th S t Rolling Hills CreekN 4 th S t S 19th StShattuckAveS TalbotRdSBensonDrSEagleRidgeDrSUV515 I-405 MainlineConstruct one new lane inboth the southboundand northbound directions R o lli n gHillsCreekMP 2.2 MP 2.3 MP 2.4 MP 2.5 MP 2.6 MP 2.7 MP 2.8 MP 2.9 MP 3.0 MP 3.1 MP 3.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 UV167UV181 UV518 SEATAC 1 2 3 !Mile Post (MP) Proposed LaneStriping Proposed RetainingWall Proposed AdditionalPavement ProposedStormwaterTreatment Facility Proposed BridgeStructure Railroad Trail Stream or NaturalDrainage Park Muncipality TRIP Stage 2 Lane Striping Stream Realignment / 0 500 Feet ! ! ! ! ! ! ! ! ! ! ! ! ! §¨¦405 UV169 NarcoProperty I-405 SouthboundWiden bridge structureover Cedar River Renton AveReconstruct bridge structure Cedar AveReconstruct bridge structure NorthernProjectLimitN 4 th S tN 4 th S t RentonCityHall BurnettLinear Park Cedar RiverNatural Area Cedar RiverPark LibertyPark JonesParkN 4 th S t PiazzaPark TonkinsPark VeteransMemorialParkWilliam Ave SWells Ave SBronson Way NN 2nd St M aple Valley H wy NE3rdSt Ceda r R i v e r T r a i l CedarRiver Main Ave SS 7th St Beacon W ay S JonesParkN 4 th S t I-405 MainlineConstruct one new lanein both the southboundand northbound directions SGradyWayMP 3.2 MP 3.3 MP 3.4 MP 3.5 MP 3.6 MP 3.7 MP 3.8 MP 3.9 MP 4.0 MP 4.1 MP 4.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 UV167UV181 UV518 SEATAC 1 2 3 !Mile Post (MP) Proposed LaneStriping Proposed RetainingWall Proposed AdditionalPavement ProposedStormwaterTreatment Facility Proposed BridgeStructure Railroad Trail Stream or NaturalDrainage Park Muncipality TRIP Stage 2 Lane Striping Stream Realignment / 0 500 Feet DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT PLANNING DIVISION SHORELINE MANAGEMENT ACT OF 1971 PERMIT FOR SHORELINE MANAGEMENT EVALUATION FORM & DECISION DATE OF PERMIT ISSUANCE: July 11, 2018 LAND USE ACTION FILE NO.: LUA17-000810, SM, CAR DATE RECEIVED: November 28, 2017 DATE OF PUBLIC NOTICE: December 8, 2017 Pursuant to Chapter 90.58 RCW, staff recommends that the City of Renton grant a Shoreline Substantial Development Permit. This action is proposed on the following application: PROJECT NAME: I-405, Tukwila to Renton Improvement Project, Stage 3 PROJECT MANAGER: Clark H. Close, Senior Planner OWNER/APPLICANT: Linda J. Cooley, WSDOT / 600 108th Ave NE Suite 405, Bellevue, WA 98004 CONTACT: Kimberly Toal, I-405 Team / 600 108th Ave NE Suite 900, Bellevue, WA 98004 PROJECT LOCATION: I-405, Tukwila to Renton Improvement Project / Project address: I-405 MP 0.0 to MP 4.0, Cedar River Crossing, Renton, WA 98057 LEGAL DESCRIPTION: (King County Assessor) N/A SEC-TWN-R: S. 17-T. 23N.-R. 5E. W.M. WITHIN THE SHORELINES OF: Cedar River Reaches (CR-B and CR-C) APPLICABLE MASTER PROGRAM: City of Renton PROPOSAL DESCRIPTION: The applicant, Washington State Department of Transportation (WSDOT) Northwest Region, is requesting a Shoreline Substantial Development Permit and Critical Areas Permit for the I-405, Tukwila to Renton Improvement Project, Stage 3. The Project is designed to reduce congestion and improve safety performance along one of the state’s most congested sections of highway. The Project includes roadway, bridge and trail realignment work within the Shoreline High Intensity and Shoreline Urban Conservancy environment at Cedar River, Reach B and C. The west side of the southbound I-405 lanes north of SR 169 would be widened to accommodate an additional lane in each direction. The total riparian impacts, on either side of the river, would amount to roughly 6,000 square feet. The Cedar River Bridge is located at Latitude 47°28'50.91"N and Longitude 122°11'59.29"W near I-405, Exit 4. Much of the property, within the Cedar River project area, is currently within WSDOT right-of-way (ROW). The closest bridge pier would be roughly 30 feet landward of the ordinary high-water mark (OHWM) on the south bank. Minor offsite improvements may include pavement markings, drainage improvements, permanent signing, illumination, intelligent transportation systems and ramp metering, barriers, and tolling gantries. Construction work is anticipated to start in 2019 and the project is expected to open to traffic in 2024. The project would use the design-build project delivery method, the proposed plan does not require adding fill materials within the Cedar River floodplain. Disturbed areas are to be restored to the existing grade. There may be minor amounts of fill (approximately 100 cubic yards) in some locations associated with final grading. I-405 bridge widening and DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 2 of 27 relocation work is part of the larger I-405 Renton to Bellevue Express Toll Lanes Project for which the total cost is estimated at $890 million. The Tukwila to Renton Improvement Project, from I-5 to SR 169, has an estimated construction cost is $308 million. The proposed work area is part of a complex of multiple transportation crossings that include the Houser Way bridge and a BNSF bridge to the west of the I-405 north and southbound lanes. Land use and ownership adjacent to the I-405 corridor includes Renton Old City Hall on the south bank and Liberty Park and Cedar River Park on the north bank. The subject site area along I-405, which is not within WSDOT ROW, has residential, commercial, and industrial zoning. The Cedar River area improvements are located within the following Critical Areas: floodway and 100-year Special Flood Hazard Area (FEMA Zone AE), Cedar River Regulated Shoreline Reaches B and C, high seismic hazard area, moderate landslide hazard area, regulated slopes, and Wellhead Protection Area Zones 1 and 2. Many of the potential impacts to critical areas would be avoided entirely. Only minor fill and excavation is planned within the Shoreline jurisdiction and therefore little to no disturbance to seismically sensitive areas or steep slopes. No work would be done within the Cedar River and no structures would be placed within the floodplain that would be expected to increase flood levels. WSDOT, as the lead agency, issued a Determination of Non-significance (DNS) and Adoption of Existing Environmental Document for the I-405 Corridor Program on March 31, 2008. This decision was made after review of a completed Environmental Checklist and other information on file (Exhibit 1). A preliminary estimate of fourteen (14) trees on the river banks would be removed during the bridge widening work and replaced elsewhere along the Cedar River corridor. WSDOT would obtain a Hydraulic Permit Application (HPA) from Washington Department of Fish and Wildlife (WDFW). A tree inventory and replacement plan would be prepared by the design builder and final mitigation would adhere to mitigation ratios for critical areas disturbed and trees removed. A landscape architect would prepare a roadside restoration plan at the time of construction permit. FINDINGS OF FACT: 1. The Planning Division of the City of Renton accepted the above master application for review on November 28, 2017 and determined the application complete on December 8, 2017. The project was placed on hold on January 18, 2018 and taken off hold on March 6, 2018. The project complies with the 120 -day review period. 2. The applicant, Washington State Department of Transportation (WSDOT) Northwest Region, is requesting a Shoreline Substantial Development Permit and Critical Areas Permit to widen Interstate 405 (I-405) from Tukwila to Renton by adding one new lane in each direction. 3. The Tukwila to Renton Project would extend approximately four miles along I-405 from mile post (MP) 0.0 to SR 169 mile post 4.0 in Renton (Exhibit 2) to accommodate an extra lane in each direction. The project is located in the lower elevations of Water Resource Inventory Area 8 – Lake Washington Watershed. 4. The I-405 bridge widening and relocation work is part of the larger I-405 Renton to Bellevue Express Toll Lanes Project. Between SR 167 and SR 169, Stage 3 improvements include combining the two (2) exiting interior lanes (the existing High Occupancy Vehicle (HOV) lane and adjacent general-purpose lanes) to create a new dual lane express toll system in both directions. Southbound I-405 would be widened to the outside including widening the existing southbound I-405 bridge over the Cedar River with a single span bridge to add one (1) new southbound lane, and the existing northbound outside shoulder would be converted into a northbound peak-use shoulder lane (Exhibit 3). Structures over I-405 at Cedar Ave S and Renton Ave S would be replaced to accommodate the widening of the Southbound I-405 roadway. 5. Minor offsite improvements may include pavement markings, drainage improvements, permanent signing, illumination, intelligent transportation systems and ramp metering, barriers, and tolling gantries. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 3 of 27 6. The nearby zoning, which is not within WSDOT ROW, is zoned Residential-6 (R-6), Residential-8 (R-8), Residential-10 (R-10), Residential-14 (R-14), Residential Multi-Family (RMF), Commercial Office Residential (COR), Commercial Arterial (CA), Center Downtown (CD), Medium Industrial (IM) and Resource Conservation (RC). 7. Project improvements includes roadway and bridge work (Exhibit 4). The site is located within a floodway and 100-year Special Flood Hazard Area (FEMA Zone AE), Cedar River Regulated Shoreline Reaches (CR-B and CR-C), high seismic hazard area, moderate landslide hazard area, regulated slopes, and Wellhead Protection Area Zones 1 and 2. Many of the potential impacts to critical areas would be avoided entirely. 8. Only minor fill and excavation is planned within the shoreline jurisdiction and therefore little to no disturbance to seismically sensitive areas or steep slopes (Exhibit 11). Trees on the river banks would be removed during the bridge widening work and replaced at the northern portion of Ron Regis Park within the Cedar River shoreline buffer (Exhibits 6 and 18). 9. No work is proposed within the Cedar River and no structures would be placed with the floodplain that would be expected to increase flood levels. The total riparian impacts, on either side of the Cedar River, would amount to 6,000 square feet. 10. The majority of potential adverse effects associated with the construction and operation of the project would be avoided or minimized through the use of Best Management Practices (BMPs). WSDOT contractors would follow procedures outlined in the WSDOT Geotechnical Design Manual (GDM) and Bridge Design Manual. Unavoidable effects to local soils and geology resulting from project construction would be mitigated by following standard WSDOT construction practices and the I-405 Programmatic Commitments. 11. The project would reconstruct or replace two (2) local bridges to the Renton Hill Neighborhood (Cedar Ave S Bridge and Renton Ave S Bridge). 12. Associated noise wall construction, stormwater management facilities to provide water quality treatment, and detention and upgrade the conveyance system are part of the overall I-405 improvement project. 13. A Summary of Stormwater Management Concepts was submitted with the application (Exhibit 9). 14. A Geology and Soils Report was submitted with the application (Exhibit 10). The Tukwila to Renton Project lies in a heavily populated area located within the Green-Duwamish River Valley. The majority of the near- surface soil material in the study area along the I-405 corridor have been modified by the addition of fill material and is classified as Urban Land or Modified Fill. The fill is underlain by relatively loose, soft soil with a shallow groundwater table. The local surface geology in the study area also includes wetland deposits, glacial deposits, and sandstone bedrock. 15. Comments were received from The Muckleshoot Indian Tribe Fisheries Division (“Muckleshoot Indian Tribe”) from Karen Walter on December 22, 2017 (Exhibit 12); response comments from WSDOT were forwarded to the Muckleshoot Indian Tribe on March 6, 2018 (Exhibit 13). 16. Comments were received from King County Department of Natural Resources and Parks, Wastewater Treatment Division (WTD) on December 20, 2017 (Exhibit 14). 17. On March 31, 2008, WSDOT (SEPA lead agency), issued a Determination of Non-significance (DNS) and Adoption of Existing Environmental Document for the I-405 Corridor Program on March 31, 2008. This decision was made after review of a completed Environmental Checklist, the Environmental Assessment (EA) prepared in accordance with the National Environmental Policy Act (NEPA), and other information on file with the lead agency. This information is available to the public upon request. 18. The proposed replacement of existing utility systems would be considered a replacement and/or rehabilitation of existing utilities and would be permitted outright in Table 4-3-050C.3 Exemptions – Critical Areas and Buffers. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 4 of 27 19. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments have been incorporated into the appropriate sections of this report and are attached to this report (Exhibit 19). 20. Comprehensive Plan Compliance: The site is designated Residential Low Density (RLD), Residential Medium Density (RMD), Residential High Density (RHD), Commercial & Mixed Use (CMU), Employment Area, and Commercial-Office-Residential (COR). The proposal is compliant with the following Comprehensive Plan Policies and Goals if all conditions of approval are met: Compliance Comprehensive Plan Analysis A. LAND USE ELEMENT: Under the Growth Management Act (RCW 36.70a) Renton has an obligation to meet the demands of local and regional growth. Managing growth is not an endeavor that Renton takes on alone. The Puget Sound Regional Council’s VISION 2040 establishes goals and policies that tie the region together and support people, prosperity, and the environment. Through the Countywide Planning Policies, King County jurisdictions further define their roles in accommodating growth using sustainable and environmentally responsible development practices.  Goal L-U: Preserve, protect, and enhance the quality and functions of the City’s sensitive areas including: lakes, rivers, major and minor creeks, intermittent stream courses and their floodplains, wetlands, ground water resources, wildlife habitats, and areas of seismic and geological hazards.  Policy L-29: Protect the integrity of natural drainage systems and existing land forms, and maintain wildlife habitat values by preserving and enhancing existing vegetation and tree canopy coverage to the maximum extent possible and by restoring hydrological flows and improving the condition of shorelines.  Policy L-34: Ensure buildings, roads, and other features are located on less sensitive portions of a site when sensitive areas are present.  Policy L-36: Land uses in areas subject to flooding, seismic, geologic, and coal mine hazards should be designed to prevent property damage and environmental degradation before, during, and after construction.  Policy L-54: Protect public scenic views and public view corridors, including Renton’s physical, visual and perceptual linkages to Lake Washington and the Cedar River.  Policy L-55: Preserve natural landforms, vegetation, distinctive stands of trees, natural slopes, and scenic areas that contribute to the City’s identity, preserve property values, and visually define the community and neighborhoods. B. TRANSPORTATION ELEMENT:  Goal T-A: Continue to develop a transportation system that stimulates, supports, and enhances the safe, efficient and reliable movement of people, vehicles, and goods. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 5 of 27  Goal T-B: Balance transportation needs with other community values and needs by providing facilities that promote vibrant commerce, clean air and water, and health and recreation.  Goal T-C: Maintain, preserve, and extend the life and utility of transportation investments.  Policy T-25: Develop and designate appropriate pedestrian and bicycle commuter routes along minor arterial and collector arterial corridors.  Policy T-27: Promote non-motorized travel not only as a viable means of transportation but as an important method for maintaining overall health and fitness.  Policy T-33: Construct improvements and implement actions to facilitate the flow of HOV’s into, out of, and through Renton.  Policy T-34: Support exclusive freeway/arterial HOV facilities that improve transit travel times by enabling buses to bypass congestion.  Policy T-49: Encourage development that can be supported by transit and other non- single occupant vehicle modes.  Policy T-74: Develop and maintain relationships between Renton and other agencies and local jurisdictions for cooperative planning of common transportation improvements. 21. Zoning Development Standard Compliance: The nearby zoning, which is not within WSDOT ROW, is zoned Residential-6 (R-6), Residential-8 (R-8), Residential-10 (R-10), Residential-14 (R-14), Residential Multi-Family (RMF), Commercial Office Residential (COR), Commercial Arterial (CA), Center Downtown (CD), Medium Industrial (IM) and Resource Conservation (RC). The proposed project would not be subject to zoning development standards. 22. The following table contains project elements intended to comply with the Shoreline Master Program (SMP) bulk and dimensional standards and policies, as outlined in RMC 4-3-090: SHORELINE MASTER PROGRAM CRITERA: A. COMPREHENSIVE PLAN COMPLIANCE AND CONSISTENCY, SHORELINE ELEMENT: Portions of the project are located in the Urban Conservancy Overlay District and the Shoreline High- Intensity Overlay District. The objective of the Urban Conservancy environment is to protect, conserve, restore, and manage existing areas with ecological functions of open space, floodplain, and other sensitive lands where they exist in urban and developed settings, while allowing compatible uses. The objective of the High Intensity Overlay is to provide opportunities for large-scale office and commercial employment centers, as well as, multi-family residential use and public services. This district provides opportunities for water-dependent and water-oriented uses while protecting existing ecological functions and restoring ecological functions in areas that have been previously degraded. Development may also provide for public use and/or community use, especially access to and along the water's edge. The proposal is compliant with the following Shoreline policies:  Policy SH-14. Shoreline use and development should be carried out in a manner that prevents or mitigates adverse impacts so that the resulting ecological condition does not DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 6 of 27 become worse than the current condition. This means ensuring no net loss of ecological functions and processes in all development and use. Permitted uses should be designed and conducted to minimize, in so far as practical, any resultant damage to the ecology and environment (RCW 90.58.020). Shoreline ecological functions that should be protected include, but are not limited to, fish and wildlife habitat, food chain support, and water temperature maintenance. Shoreline processes that shall be protected include, but are not limited to, water flow; littoral drift; erosion and accretion; infiltration; ground water recharge and discharge; sediment delivery, transport, and storage; large woody debris recruitment; organic matter input; nutrient and pathogen removal; and stream channel formation/maintenance.  Objective SH-E. Existing economic uses and activities on the shorelines should be recognized and economic uses or activities that are water-oriented should be encouraged and supported.  Policy SH-18. All economic activities on the shoreline shall provide for no net loss of ecological functions during construction and operation.  Policy SH-F. Increase public accessibility to shorelines and preserve and improve the natural amenities.  Policy SH-24. Public access to and along the water's edge should be located, designed, and maintained in a manner that protects the natural environment and shoreline ecological functions and is consistent with public safety, as well as, compatible with water-dependent uses. Preservation or improvement of the natural processes shall be a basic consideration in the design of shoreline areas to which public access is provided, including trail systems.  Policy SH-26. Both passive and active public areas should be designed and provided.  Policy SH-30: Development and management of public access should recognize the need to address adverse impacts to adjacent private shoreline properties and should recognize and be consistent with legal property rights of the owner. Just compensation shall be provided to property owners for land acquired for public use. Private access to the publicly owned shoreline corridor shall be provided to owners of property contiguous to said corridor in common with the public.  Policy SH-39: Viewpoints, parking, trails, and similar improvements should be considered for transportation system projects in shoreline areas. Bridge abutments should incorporate stairs or trails to reach streams where appropriate.  Policy SH-43: Trails should be developed to enhance public enjoyment of and access to the shoreline: 1) Trails within the shoreline should be developed as an element of non-motorized circulation, the City’s Parks, Recreation and Natural Areas Plan, Trails and Bicycle Master Plan, and the Shoreline Public Access program. Trails provide the potential for low impact public physical and visual access to the shoreline. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 7 of 27 2) Trails should be developed as an element of a system that links together shoreline public access into an interconnected network including active and passive parks, schools, public and private open space, native vegetation easements with public access, utility rights of way, waterways, and other opportunities. 3) Public access to and along the water's edge should be linked with upland community facilities and the comprehensive trail system that provides non-motorized access throughout the City. 4) A system of trails on separate rights of way and public streets should be designed and implemented to provide linkages along shorelines including the Lake Washington Loop, the Cedar River, the Black River, Springbrook Creek, and the Green River.  Policy SH-44: Road standards should meet roadway function and emergency access standards and provide for multiple modes, while reducing impervious surfaces, where feasible, and managing surface water runoff to achieve appropriate water quality.  Objective SH-J. Provide for the timely restoration enhancement of shorelines with impaired ecological functions. Such restoration should occur through a combination of public and private programs and actions. This Master Program includes a restoration element that identifies restoration opportunities and facilitates appropriate publicly and privately initiated restoration projects. The goal of this effort is to improve shoreline ecological functions. B. GENERAL DEVELOPMENT STANDARDS: The subject site is classified as Shoreline High Intensity and Urban Conservancy on the City of Renton Shoreline Overlay Map. The following development standards are applicable to the proposal: 1. Environmental Effects: a. No Net Loss of Ecological Functions:  Shoreline use and development shall be carried out in a manner that prevents or mitigates adverse impacts to ensure no net loss of ecological functions and processes in all development and use. Permitted uses are designed and conducted to minimize, in so far as practical, any resultant damage to the ecology and environment of the shoreline area and any interference with the public's use of the water (RCW 90.58.020). Shoreline ecological functions that shall be protected include, but are not limited to, fish and wildlife habitat, food chain support, and water temperature maintenance. Shoreline processes that shall be protected include, but are not limited to, water flow; erosion and accretion; infiltration; groundwater recharge and discharge; sediment delivery, transport, and storage; large woody debris recruitment; organic matter input; nutrient and pathogen removal; and stream channel formation/maintenance. Staff Comment: The applicant is proposing only minor amounts of fill (approximately 100 cubic yards) and excavation within the shoreline jurisdiction (Exhibits 5 and 7). No work would be done within the Cedar River and no structures would be placed within the floodplain that would be expected to increase flood levels. The proposed plan does not require added fill materials within the Cedar River floodplain. The closest bridge pier would be approximately 30 feet landward of the ordinary high-water mark (OHWM) on the left (south) bank and 80 feet on the right (north) bank. The exiting 82,500 square foot existing I-405 Bridge over the Cedar River would be increased by 9,500 square feet. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 8 of 27 Vegetation under the bridge over the Cedar River is limited to shrubs, blackberry and a few trees. River banks downstream and on the south side of the upstream channel support mixed vegetation consisting of Douglas fir, big-leaf maple, red alder, black cottonwood, and blackberry. There is approximately 2,000 square feet of vegetation within the project impact area. A preliminary estimate of fourteen (14) trees would need to be removed during the bridge replacement work, including one (1) tree with a diameter greater than 30 inches (30”). The species impacted include big leaf maple and black cottonwood. According to the applicant, this reach of the lower Cedar River is highly disturbed. The river is completely constrained between levees and revetments and it was regularly dredged to prevent flooding from 1912 until the mid-1979s. Portions of this reach were again dredged in 1999. The applicant maintains that this reach of the Cedar River is essentially one long riffle with little habitat complexity. Urban and residential uses along this reach contribute to local water quality problems, eliminate natural floodplain connections, prevent the establishment of a riparian buffer, and eliminate the opportunity for large wood material (LWM) accumulations in the channel. Despite its limitations, this reach of river serves as a migration route for many salmonid fishes and is used for extensive spawning and limited rearing by sockeye (Oncorhynchus nerka), Puget Sound (PS) Chinook (O. tshawytscha), and coho (O. kisutch) salmon; PS steelhead (O. mykiss) and cutthroat trout (O. clarki); as well as longfin smelt (Spirinchus thaleichthys) (WSDOT Biological Assessment, Kerwin and Nelson 2000). Within the project vicinity, the Cedar River watershed has been substantially altered to accommodate residential, commercial, and industrial land uses. Alterations include bank hardening with riprap and concrete, channelization, removal of riparian vegetation, and alteration of instream habitat. Channelization has isolated much of the river from its historic floodplain. Significant changes have also occurred in the riparian composition of the watershed. Mature forests of native vegetation have been replaced by a mix of immature native vegetation and non-native invasive and ornamental plant species. Vegetation in the vicinity of the lower Cedar River consists of Japanese knotweed (Fallopia japonica), Himalayan blackberry (Rubus armeniacus), wild clematis (Clematis vitalba), black cottonwood (Populus trichocarpa), bigleaf maple (Acer macrophyllum), and other deciduous trees and shrubs. According to the applicant, shoreline and critical area impacts were avoided and minimized by the project to the greatest extent feasible; however, the Design Builder may identify further minimization measures through final design and construction of the project. The preliminary design utilizes several avoidance and minimization opportunities including selective widening, widening to the median, and use of over steepened slopes and retaining walls. The applicant contends that the proposed Cedar River stream buffer enhancements and mitigation plantings at Ron Regis Park would increase the structural complexity of the vegetation canopy and provide cover and forage material for wildlife (Exhibit 17). Over time, these enhancements are expected to improve shoreline ecological functions by reducing permanent erosion and accretion; increasing infiltration, large woody material recruitment, and organic matter input; enhancing nutrient and pathogen removal; and DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 9 of 27 supporting stream channel formation/maintenance, fish and wildlife habitat, and food chain complexity consistent with the City of Renton’s Shoreline Master Program. b. Burden on Applicant:  Applicants for permits have the burden of proving that the proposed development is consistent with the criteria set forth in the Shoreline Master Program and the Shoreline Management Act, including demonstrating all reasonable efforts have been taken to provide sufficient mitigation such that the activity does not result in net loss of ecological functions. 2. Use Compatibility and Aesthetic Effects: Shoreline use and development activities shall be designed and operated to allow the public’s visual access to the water and shoreline and maintain shoreline scenic and aesthetic qualities that are derived from natural features, such as shoreforms and vegetative cover. a. View Obstruction and Visual Quality: N/A View Corridors Required: Where commercial, industrial, multiple use, multi-family and/or multi-lot developments are proposed, primary structures shall provide for view corridors between buildings where views of the shoreline are available from public right- of-way or trails. N/A Maximum Building Height: Buildings shall be limited to a height of no more than 35 feet above average finished grade level except at specific locations. Staff Comment: The Project does not include construction of buildings.  Minimum Setbacks for Commercial Development Adjacent to Residential or Park Uses: All new or expanded commercial development adjacent to residential use and public parks shall provide fifteen feet (15') setbacks from adjacent properties to attenuate proximity impacts such as noise, light and glare, and may address scale and aesthetic impacts. Fencing or landscape areas may be required to provide a visual screen. Staff Comment: The bridge replacement and road widening activities would be located more than 15 feet from the residential use and would continue to allow for public shoreline access and recreational opportunities at Cedar River Trail. Compliant if condition of approval is met Lighting Requirements: Display and other exterior lighting shall be designed and operated so as to prevent glare, to avoid illuminating nearby properties used for noncommercial purposes, and to prevent hazards for public traffic. Methods of controlling spillover light include, but are not limited to, limits on the height of light structure, limits on light levels of fixtures, light shields, and screening. Staff Comment: Street lighting located outside of WSDOT limited access right-of-way (ROW) would be subject to City of Renton illumination requirements. The lighting affixed to the underside of the existing bridge is required to illuminate the pedestrian bridge and walking paths on both sides of the Cedar River. According to the applicant, the widened bridge would not require any additional luminaires and would increase the shielding effect from the existing illumination system. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 10 of 27 The lights nearest the river channel were originally fitted with sleeve-like attachments to direct lighting to the walking paths and minimize ambient lighting of the channel. The City is not sure if all of the sleeve-like attachments are all still in place. These attachments are showing signs of failure following their installation. In order to ensure pedestrian safety and reduce nighttime lighting within the Cedar River channel, staff recommends, as a condition of approval, that the applicant replace the existing non-factory lights with a lighting product that reduces fish predation and provides for pedestrian safety. A lighting plan shall be submitted with the construction permit application to be reviewed and approved by the Current Planning Project Manager prior to construction permit approval.  Reflected Lights to Be Limited: Building surfaces on or adjacent to the water shall employ materials that limit reflected light. Staff Comment: The road improvements would be constructed with materials that limit reflected light, such as asphalt, concrete and vegetation. There new bridge over Cedar River would not include any light penetrating materials in the design. N/A Integration and Screening of Mechanical Equipment: Building mechanical equipment shall be incorporated into building architectural features, such as pitched roofs, to the maximum extent feasible. Where mechanical equipment cannot be incorporated into architectural features, a visual screen shall be provided consistent with building exterior materials that obstructs views of such equipment.  Visual Prominence of Freestanding Structures to Be Minimized: Facilities not incorporated into buildings including fences, piers, poles, wires, lights, and other freestanding structures shall be designed to minimize visual prominence. Staff Comment: Project improvements have been designed to minimize visual prominence along the shoreline while enhancing safety for the public. The project includes expanding the southbound I-405 Cedar River Bridge over Cedar River and reconstructing or replacing the fly-over bridges to the Renton Hill Neighborhood. There would be no in-water structures constructed as part of the I-405 Tukwila to Renton Improvement Project, Stage 3.  Maximum Stair and Walkway Width: Stairs and walkways located within shoreline vegetated buffers shall not exceed four feet (4') in width; provided, that where ADA requirements apply, such facilities may be increased to six feet (6') in width. Stairways shall conform to the existing topography to the extent feasible. Staff Comment: The applicant is not proposing stairs or walkways within shoreline vegetated buffer areas. b. Community Disturbances:  Noise, odors, night lighting, water and land traffic, and other structures and activities shall be considered in the design plans and their impacts avoided or mitigated. Staff Comment: Noise and vibration impacts would primarily result from demolition and construction work. Equipment used onsite may include, but is not limited to, back hoes, DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 11 of 27 excavators, loaders, graders, rollers, dump trucks, concrete trucks, vactors, mobile and stationary cranes, drilling machines, pile drivers, and hand tools. Construction is anticipated to start in 2019 and the Project is expected open to traffic in 2024. Construction hours would conform to the City of Renton’s noise daytime ordinance requirements to the extent possible. For nighttime work, WSDOT would obtain a noise variance at a future date. Existing traffic capacity would be maintained during construction activities to the extent possible. To the extent feasible, lane or roadway closures would be minimized and scheduled to occur when there is the least effect on traffic within the project corridor, such as overnight and weekend time periods. WSDOT would coordinate with the local agencies and other projects to prepare a Traffic Management Plan prior to making any changes to the traffic flow or lane closures. Local agencies, the public, school districts, emergency service providers, and transit agencies would be informed of the changes in advance through the media, the website, and an email listserv. Pedestrian and bicycle circulation would also be maintained as much as possible throughout construction. 3. Public Access: Physical or visual access to shorelines shall be incorporated in all new development when the development would either generate a demand for one or more forms of such access, would impair existing legal access opportunities or rights, or is required to meet the specific policies and regulations of the Shoreline Master Program. a. Design Criteria for Public Access Sites:  Walkways or Trails Required in Vegetated Open Space: Public access on sites where vegetated open space is provided along the shoreline shall consist of a public pedestrian walkway parallel to the Ordinary High Water Mark (OHWM) of the property. The walkway shall be buffered from sensitive ecological features, may be set back from the water’s edge, and may provide limited and controlled access to sensitive features and the water’s edge where appropriate. Fencing may be provided to control damage to plants and other sensitive ecological features and where appropriate. Trails shall be constructed of permeable materials and limited to four feet (4') to six feet (6') in width to reduce impacts to ecologically sensitive resources. Staff Comment: The existing Cedar River Trail is located within the project site. Only minor realignment of the paved trail is proposed to accommodate the new bridge pier located in the Cedar River shoreline. The realignment would be located outside of the OHWM, immediately adjacent to the existing trail (Exhibit 18). b. Public Access Development Standards:  Planned Trails to Be Provided: Where public trails are indicated on the City’s transportation, park, or other plans, construction of trails shall be provided within shoreline and non-shoreline areas of a site. Staff Comment: The Project proposes to realign a small portion of Cedar River Trail, designated a regional trail by King County, under I-405 Cedar River Bridge. The Cedar River Trail is the longest non-motorized facility in the City, and because of its central DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 12 of 27 location within the City, can therefore be seen as the spine of the City’s trails and bicycle network. c. Public Access Requirements by Reach:  May Creek Reach (CR-B): Public access should generally be provided within the corridor of public lands adjacent to the river; however, adjacent private parcels not separated by public streets should provide active open space and other facilities to provide gathering places to enjoy the shoreline environment, together with water- oriented uses. Revisions to the existing trail to relocate further from the water’s edge to allow revegetation should be considered in the future as part of public park and river maintenance plans.  May Creek Reach (CR-C): Public/community access along the waterfront should be provided as private lands on the north side of the river redevelop, considered along with the goal of restoration of ecological functions. Public or community access shall be provided when residential development occurs consistent with standards of the Shoreline Master Program. 4. Building and Development Location – Shoreline Orientation: Shoreline developments shall locate the water-dependent, water-related, and water-enjoyment portions of their developments along the shoreline. Development and use shall be designed in a manner that directs land alteration to the least sensitive portions of the site to maximize vegetation conservation; minimize impervious surfaces and runoff; protect riparian, nearshore and wetland habitats; protect wildlife and habitats; protect archaeological, historic and cultural resources; and preserve aesthetic values. a. Design and Performance Standards:  Location of Development: Development and use shall be designed in a manner that directs land alteration to the least sensitive portions of the site. Staff Comment: WSDOT’s design directs land alteration to the least sensitive portion of the site.  Location for Accessory Development: Accessory development or use that does not require a shoreline location shall be located outside of shoreline jurisdiction unless such development is required to serve approved water-oriented uses and/or developments or unless otherwise allowed in a High Intensity designation. When sited within shoreline jurisdiction, uses and/or developments such as parking, service buildings or areas, access roads, utilities, signs and storage of materials shall be located inland away from the land/water interface and landward of water-oriented developments and/or other approved uses unless a location closer to the water is reasonably necessary.  Navigation and Recreation to Be Preserved: Shoreline uses shall not deprive other uses of reasonable access to navigable waters. Existing water-related recreation shall be preserved. Staff Comment: The project would not deprive other uses of reasonable access to navigable waters and existing water-related recreation would be preserved. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 13 of 27 5. Archaeological, Historical, and Cultural Resources: Compliant if conditions of approval are met Detailed Cultural Assessments May Be Required: The City will work with tribal, State, Federal, and other local governments as appropriate to identify significant local historical, cultural, and archaeological sites in observance of applicable State and Federal laws protecting such information from general public disclosure. Detailed cultural assessments may be required in areas with undocumented resources based on the probability of the presence of cultural resources. Staff Comment: The project proposal and notice of application were provided to reviewing agencies including, but not limited to, the State Department of Archaeology & Historic Preservation (DAHP), the Muckleshoot Indian Tribe, and King County Wastewater Treatment Division (WTD). Comments were received from the Muckleshoot Indian Tribe and WTD. No other agency comments were received as part of the notice of application. If archaeological deposits of unevaluated significance are encountered during construction activities, ground disturbance should be halted and activities directed away from the area. In order to protect archaeological resources, staff recommends, as a condition of approval, that if any Native American grave(s) or archaeological/cultural resources (Indian artifacts) are found, all construction activity shall stop and the owner/developer shall immediately notify the City of Renton planning department, concerned Tribes’ cultural committees, and the Washington State Department of Archeological and Historic Preservation.  Coordination Encouraged: Owners of property containing identified or probable historical, cultural, or archaeological sites are encouraged to coordinate well in advance of application for development to assure that appropriate agencies such as the Washington State Department of Archaeology and Historic Preservation, affected tribes, and historic preservation groups have ample time to assess the site and identify the potential for cultural resources. Staff Comment: See comment above.  Detailed Cultural Assessments Required: Upon receipt of application for a development in an area of known or probable cultural resources, the City shall require a site assessment by a qualified professional archaeologist or historic preservation professional and ensure review by qualified parties including the Washington State Department of Archaeology and Historic Preservation, affected tribes, and historic preservation groups. Staff Comment: See comment above.  Work to Stop Upon Discovery: If historical, cultural, or archaeological sites or artifacts are discovered in the process of development, work on that portion of the site shall be stopped immediately, the site secured, and the find reported as soon as possible to the Administrator of the Department of Community and Economic Development or designee. Upon notification of such find, the property owner shall notify the Washington State Department of Archaeology and Historic Preservation and affected tribes. The Administrator of the Department of Community and Economic Development or designee shall provide for a site investigation by a qualified professional and may provide for avoidance, or conservation of the resources, in coordination with appropriate agencies. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 14 of 27 Staff Comment: See comment above.  Access for Educational Purposes Encouraged: Land owners are encouraged to provide access to qualified professionals and the general public if appropriate for the purpose of public education related to a cultural resource identified on a property. Staff Comment: See comment above. 6. Standards for Density, Setbacks, and Height – Activities Exempt from Buffers and Setbacks: The following development activities are not subject to buffers and setbacks; provided, that they are constructed and maintained in a manner that minimizes adverse impacts on shoreline ecological functions; and provided further, that they comply with all the applicable regulations in RMC Title IV. N/A Water-Dependent Development: Those portions of approved water-dependent development that require a location waterward of the OHWM of streams, rivers, lakes, ponds, marine shorelines, associated wetlands, and/or within their associated buffers. Compliant if conditions of approval are met Vegetation Conservation Buffer: Water bodies defined as shorelines shall have a minimum one hundred-foot (100') vegetation management buffer measured from the OHWM of the regulated shoreline of the State. Areas approved for water-dependent use or public access may be excluded from vegetated buffer if the approval is granted through review of a Substantial Development Permit; provided, that the area excluded is the minimum needed to provide for the water-dependent use or public access. Staff Comment: Access to May Creek Bridge would be approximately 30 feet landward of the OHWM. WSDOT is proposing to realign Cedar River Trail as a result of the new pier required for the I-405 Cedar River Bridge widening to accommodate additional traffic lanes. Disturbed areas would be restored onsite as much as feasible; however, up to 6,000 square feet of total riparian impacts would be mitigated for offsite at Ron Regis Park in Renton as potential Cedar River buffer enhancements. The location is close to a cut bank of the Cedar River where long-term recruitment is highly likely and is adjacent to a riparian mitigation site being restored by Forterra, a land conservation organization. Currently European blackberry and mature cottonwood trees are among the dominant species. Based on the surrounding vegetation, the site would likely support western red cedar, hemlock, fir Oregon ash, big-leaf maple and an understory of salmonberry, snowberry, red-osier dogwood and pacific nine bark. Clearing the invasive blackberry and planting indigenous trees and shrubs would provide both trees for recruitment, and riparian shade as well as deterring the re-establishment of non-native vegetation. WSDOT has indicated that the monitoring period for the replanting work would be for five years. As a condition of approval, staff is recommending that applicant complete an inter-local agreement (ILA) between the WSDOT and the City of Renton for the tree planting mitigation work at Ron Regis Park. In addition, the applicant shall submit a detailed landscape plan with maintenance and temporary irrigation for review and approval by the Current Planning Project Manager prior to construction permit approval. N/A Aquatic Building Height – Maximum: In water – 35 ft. Additional height may be allowed if essential to the function of a water-dependent use. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 15 of 27 N/A High Intensity Building Height – Maximum: In water – 35 ft. Within 100 feet of OHWM – 35 ft. More than 100 feet from the OHWM – 35 ft. Additional height may be allowed if essential to the function of a water-dependent use. Height up to that established in chapter 4-2 RMC, Zoning Districts – Uses and Standards, may be allowed for non-water-dependent uses in the following reaches: Lake Washington Reaches C, H, I, and J; Cedar River Reaches A, B, and C; Black River Reach A; May Creek Reach B; and Springbrook Creek Reaches B, C, and D: For buildings landward of one hundred feet (100') from OHWM, the maximum building height shall be defined by a maximum allowable building height envelope that shall: i. Begin along a line laying parallel to and one hundred feet (100') from OHWM at a height of either thirty-five feet (35') or one half (1/2) the maximum height allowed in the underlying zone, whichever is greater; and ii. Have an upward, landward transition at a slope of one vertical to one horizontal from the beginning height either (a) until the line at which the maximum height allowed in the underlying zoning in chapter 4-2 RMC is reached (from which line the height envelope shall extend landward at the maximum height allowed in the underlying zoning), or (b) to the end of shoreline jurisdiction, whichever comes first. N/A Impervious area within the Buffer/Setback: 5%  Impervious area within 100 feet of the OHWM: 75% Staff Comment: See comments above under “Vegetation Conservation Buffer” in Section B.6. 7. Use Regulations: a. Public Hiking and Bicycle Trails, Over Land:  A public trail is permitted outright, provided that the use does not degrade the ecological functions or natural character of the shoreline area. Staff Comment: The proposed improvements to I-405 were designed to retain public trail access and recreational opportunities. The realignment of Cedar River Trail would not degrade the ecological functions or natural character of the shoreline area. 8. Recreation: a. Recreation activities are allowed when:  i. There is no net loss of ecological functions, including on- and offsite mitigation. ii. Water-related and water-enjoyment uses do not displace water-dependent uses and are consistent with existing water-related and water-enjoyment uses. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 16 of 27 iii. The level of human activity involved in passive or active recreation shall be appropriate to the ecological features and shoreline environment. iv. State-owned shorelines shall be recognized as particularly adapted to providing wilderness beaches, ecological study areas, and other recreational uses for the public in accordance with RCW 90.58.100(4). Staff Comment: See comments above under “No Net Loss of Ecological Functions,” Section B.1.a. b. Location Relative to the Shoreline: Activities provided by recreational facilities must bear a substantial relationship to the shoreline, or provide physical or visual access to the shoreline.  ii. Water-related recreation such as picnicking, hiking, and walking should be located near the shoreline. Staff Comment: The existing Cedar River Trail is located parallel to the shoreline. c. Public Recreation: Public recreation uses shall be permitted within the shoreline only when the following criteria are considered:  i. The natural character of the shoreline is preserved and the resources and ecology of the shoreline are protected. ii. Accessibility to the water’s edge is provided consistent with public safety needs and in consideration of natural features. iii. Recreational development shall be of such variety as to satisfy the diversity of demands of the local community. iv. Water-related and water-enjoyment uses do not displace water-dependent uses and uses are consistent with existing water-related and water-enjoyment uses. v. Recreational development is located and designed to minimize detrimental impact on the adjoining property. vi. The development provides parking and other necessary facilities to handle the designed public use. vii. Effects on private property are consistent with all relevant constitutional and other legal limitations on regulation or acquisition of private property. viii. Public parks and other public lands shall be managed in a manner that provides a balance between providing opportunities for recreation and restoration and enhancement of the shoreline. Major park development shall be approved only after a master planning process that provides for a balance of these elements. Staff Comment: See comments under “Recreation activities are allowed when,” Section B.8.a. 9. Transportation: a. Roads: DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 17 of 27  i. New public or private roads and driveways shall be located inland from the land/water interface, preferably out of the shoreline, unless: (a) Perpendicular water crossings are required for access to authorized uses consistent with the Shoreline Master Program; or (b) Facilities are primarily oriented to pedestrian and nonmotorized use and provide an opportunity for a substantial number of people to enjoy shoreline areas, and are consistent with policies and regulations for ecological protection. ii. Road locations shall be planned to fit the topography, where possible, in order that minimum alteration of existing natural conditions will be necessary. iii. RCW 36.87.130 prohibits vacation of any right-of-way that abuts freshwater except for port, recreational, educational or industrial purposes. Therefore, development, abandonment, or alteration of undeveloped road ends within Shoreline Master Program jurisdiction is prohibited unless an alternate use is approved in accordance with the Shoreline Master Program. Staff Comment: According to WSDOT, Interstate 405 is one of the state’s most congested corridors. The I-405 Widening and Express Toll Lanes project would add new capacity to create a two-lane express toll lane system between SR 167 and Bellevue. In general, the project would add one new land in each direction. This project is designed to improve speeds and trip reliability for all travelers. The proposed work area is part of a complex of multiple transportation crossings that include the Houser Way bridge and a BNSF bridge to the west of the I-405 north and southbound lanes. Land use and ownership adjacent to the I-405 corridor includes Renton Old City Hall on the south bank and Liberty Park and Cedar River Park on the north bank. The alignment also crosses or runs adjacent to several drainages, most notably the Cedar River, May Creek, and Coal Creek. I-405 crosses the Cedar River, an anadromous fish- bearing stream, approximately 1.62 miles upstream of its outlet into Lake Washington. The improvements maintain perpendicular water crossings and access to shoreline areas. WSDOT would meet American Association of State Highway and Transportation Officials (AASHTO) design standards. b. Trails:  i. Trails that provide public access on or near the water shall be located, designed, and maintained in a manner that protects the existing environment and shoreline ecological functions. Preservation or improvement of the natural amenities shall be a basic consideration in the design of shoreline trails. ii. The location and design of trails shall create the minimum impact on adjacent property owners including privacy and noise. iii. Over-water structures may be provided for trails in cases where: (a) Key trail links for local or regional trails must cross streams, wetlands, or other water bodies. (b) For interpretive facilities. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 18 of 27 (c) To protect sensitive riparian and wetland areas from the adverse impacts of at grade trails, including soil compaction, erosion potential and impedance of surface and groundwater movement. iv. Trail width and surface materials shall be appropriate for the context with narrow soft surface trails in areas of high ecological sensitivity where the physical impacts of the trail and the number of users should be minimized with wider hard-surfaced trails with higher use located in less ecologically sensitive areas. Staff Comment: Realignment of the Cedar River Trail would be designed to protect the existing environment and shoreline ecological functions and minimize the impact on adjacent properties. WSDOT is proposing to realign the City’s Cedar River Trail under the I-405 Cedar River Bridge as a result of the bridge widening into the existing trail’s path. 28. The following table contains project elements intended to comply with the Critical Areas Regulations and policies, as outlined in RMC 4-3-050: CRITICAL AREA REGULATIONS CRITERA: A. COMPREHENSIVE PLAN COMPLIANCE AND CONSISTENCY, CRITICAL AREA ELEMENT: Critical areas are defined as wetlands, aquifer recharge areas, fish and wildlife habitat, frequently flooded, and geologically hazardous areas regulated by the City of Renton’s Critical Areas Ordinance. Sustainability recognizes that natural systems are essential to providing both economic needs and quality of life and that actions of today have an impact on the environment which impacts the future. The quality of Renton’s land, air, and water affect the health and resiliency of everyone in the community. The proposal is compliant with the following goals:  Goal L-P: Minimize adverse impacts to natural systems, and address impacts of past practice where feasible, through leadership, policy, regulation, and regional coordination.  Goal L-U: Preserve, protect, and enhance the quality and functions of the City’s sensitive areas including: lakes, rivers, major and minor creeks, intermittent stream courses and their floodplains, wetlands, ground water resources, wildlife habitats, and areas of seismic and geological hazards.  Goal L-V: Protect the natural functions of 100 year floodplains and floodways to prevent threats to life, property, and public safety associated with flooding hazards. B. ALTERATIONS TO CRITICAL AREAS: The subject site is classified as a Critical Area on the City of Renton (COR) Map. Stream relocation may be allowed when analyzed in an accepted stream or lake assessment. The following criteria and conditions to the proposal must be met: 1. Onsite Mitigation:  Onsite mitigation is required unless a finding is made that onsite mitigation is not feasible or desirable. Staff Comment: I-405 road widening work would result in impacts to Cedar River, 0.089- acres of permanent stream buffer impacts and 0.035-acres of temporary stream buffer impacts. Temporary impacts would be restored in-place and permanent impacts would DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 19 of 27 be mitigated for via coordination between WSDOT and the City of Renton. Ron Regis Park, near the Cedar River, has been selected as the receiving site for unavoidable riparian impacts. This project is proposing to utilize the “Design-Build” method of delivery, meaning that all of the impacts and corresponding mitigation discussed in the reports are based on low-level conceptual project design, which would be refined and finalized by a Design- Build contractor prior to construction. See also comments under “No Net Loss of Ecological Functions,” Section B.1.a. 2. Offsite Mitigation:  Offsite mitigation may be allowed when located within the same drainage sub-basin as the subject site and if it achieves equal or improved ecological functions over mitigation on the subject site. Staff Comment: To fully compensate for unavoidable permanent impacts to Cedar River, WSDOT proposes to plant offsite at Ron Regis Park in Renton as Cedar River buffer enhancements. See also comments under “Vegetation Conservation Buffer,” under FOF 22, Section B.6 above. 3. Mitigation Type: In all cases, mitigation shall provide for equivalent or greater biological functions. Additionally, there shall be no net loss of riparian area or shoreline ecological function resulting from any activity or land use occurring within the regulated buffer area. Types of mitigation include: daylighting, removal of impervious surfaces and in-stream mitigation.  Daylighting (returning to open channel) of streams or removal of manmade salmonid migration barriers. Staff Comment: Cedar River flows under a bridge at I-405 just south of Maple Valley Highway (SR 169). The bridge is being widened as part of the project and one additional bridge pier and footing would be added. The proposed plan does not require added fill materials within the Cedar River floodplain and disturbed areas are to be restored to the existing grade. According to the applicant, there may be minor amounts of fill (approximately 100 cubic yards) in some locations associated with final grading. All fill material shall be obtained from approved fill sources. The applicant would be required to provide a fill source statement to the City to ensure clean fill used with the construction permit application. See also comments under “No Net Loss of Ecological Functions,” Section B.1.a. 4. Development Standards: No proposal shall result in a loss of critical area functions or values. If the application of these provisions would deny all reasonable use of the property, the applicant may apply for a variance as identified in RMC 4-9-250.  Setbacks and buffers from critical area buffers: DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 20 of 27 Type F streams require a 115-foot critical area buffer width, Type Np require a 75 foot buffer, and Type Ns require a 50 foot buffer. In additional a 15-foot structure setback is required beyond the buffer. Landscaping is allowed in the building setback area. Critical Area Buffers and Structure Setbacks form Buffers (Table 4-3-050G.2): Critical Area Category or Type Critical Area Buffer Width Structure Setback beyond Buffer Wetlands6 Low Impact Land Uses:7 High Habitat Function (8-9 points) Moderate Habitat Function (5-7 points) Low Habitat Function (3-4 points) All Other Scores 15 ft. Category I – Bogs & Natural Heritage Wetlands 175 ft. Category I – All Others 175 ft. 125 ft. 75 ft. 75 ft. Category II 150 ft. 100 ft. 75 ft. n/a Category III 100 ft. 75 ft. 50 ft. n/a Category IV 40 ft. n/a All Other Land Uses: High Habitat Function (8-9 points) Moderate Habitat Function (5-7 points) Low Habitat Function (3-4 points) All Other Scores 15 ft. Category I – Bogs & Natural Heritage Wetlands 200 ft. Category I – All Others 200 ft. 150 ft. 115 ft. 115 ft. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 21 of 27 Category II 175 ft. 150 ft. 100 ft. n/a Category III 125 ft. 100 ft. 75 ft. n/a Category IV 50 ft. n/a Footnotes: 6. Areas that are functionally and effectively disconnected from the wetland by a permanent road or other substantially developed surface of sufficient width and with use characteristics such that buffer functions are not provided shall not be counted toward the minimum buffer unless these areas can be feasibly removed, relocated or restored to provide buffer functions. 7. Low intensity land uses include but are not limited to the following: unpaved trails, low intensity open space (hiking, bird-watching, preservation of natural resources, etc.) and utility corridor without a maintenance road and little or no vegetation management. Staff Comment: The Critical Areas Regulations, Table 4-3-050G.2 establishes development standards for critical areas based on category or type. Completion of the I- 405 corridor work would require construction of embankments, ramps, overpasses, noise walls, drainage systems, stormwater detention and treatment facilities, sanitary sewer mains and a fish passable stream crossing. Drainage plans and a drainage report complying with the adopted 2017 Renton Surface Water Design Manual would be required. Furthermore, pursuant to RMC 4-3-050C.3 “Exemptions – Critical Areas and Buffers,” indicate exempt activities within critical areas and associated buffers, such as roads and utilities where critical area and required buffer impacts are minimized and disturbed areas are restored. The Project, as proposed, is expected to result in temporary and permanent impacts to riparian buffers. There are no significant adverse impacts associated with the project. WSDOT, as lead agency, adopted a Determination of Nonsignificant Impact on March 31, 2008 (Exhibit 1). The environmental impacts to shoreline buffers were avoided and minimized to the greatest extent feasible and/or mitigation measure have been recommended.  Flood Hazard Areas: Flood hazard areas are defined as the land in the floodplain subject to one percent (1%) or greater chance of flooding in any given year. Encroachments, including fill, new construction, substantial improvements, and other development are prohibited unless certification by a registered professional engineer demonstrates through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that: (a) Encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge; and (b) There are no adverse impacts to the subject property or abutting or adjacent properties; and DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 22 of 27 (c) There are no higher flood elevations upstream; and (d) The impact due to floodway encroachment shall be analyzed using future land use condition flows. Staff Comment: Within the floodway, encroachments including fill, new construction, substantial improvements, and other development are prohibited unless certification by a registered professional engineer demonstrates through hydrologic and hydraulic analyses, performed in accordance with standard engineering practice, that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge, that there are no adverse impacts to the subject property or abutting or adjacent properties, that there are no higher flood elevations upstream, and that the impact due to floodway encroachment shall be analyzed using future land use condition flows. Future flow conditions should be considered for proposed bridge proposals crossing floodways. The City of Renton’s Municipal Code (RMC) 4-3-050 Critical Areas Regulations, backed by Executive Order 11988 Floodplain Management, require zero-rise in floodplain elevations due to construction projects. The project is being developed at a conceptual level in advance of final design and construction through design-build contracting. WSDOT has been developing conceptual designs in coordination with the City of Renton’s stormwater utility staff, with the intent to establish and verify performance criteria that would be met by the final design. WSDOT would need to provide a zero-rise hydraulic analysis of the existing and proposed site conditions within the floodplain of the Cedar River per section 4.4.2 of the 2017 City of Renton Surface Water Design Manual. The current flood insurance rate map for the Green River is dated May 16, 1995. The Federal Emergency Management Agency (FEMA) has converted all flood insurance rate maps into digital flood insurance rate maps. FEMA published a preliminary Digital Flood Insurance Rate Maps (DFIRM) in September 2017. The proposed floodplain maps reflect changes to the current effective Federal Emergency Management Agency DFIRM. Within Renton, the floodplain map changes are in the Cedar River valley. WSDOT based the existing site conditions on the 2017 Preliminary FEMA DFIRM Floodplain/Floodway data. The FEMA Floodplain Map in effect at the time of final design by the Design Builder shall be used. The anticipated effective date of King County Communities’ FEMA Flood Insurance Rate Map is Summer 2019. If the final grading plan, filling, or any other activity reduces the effective storage volume of the floodplain, compensatory storage shall be created per section 4-3-050 of the Renton Municipal Code (RMC). The project shall not result in any change to the floodplain or floodway.  Impervious area impacts: Staff Comment: Between SR 167 and SR 169, Stage 3 improvements include combining the two existing interior lanes (the existing HOV and adjacent general-purpose lanes) to create a new dual lane express toll system in both directions. Southbound I-405 would be widened to the outside including widening the southbound I-405 bridge over the Cedar River to add one new southbound lane, and the existing northbound outside shoulder would be converted into a northbound peak-use shoulder lane. Structures over DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 23 of 27 I-405 at Cedar Ave S and Renton Ave S would be rebuilt to accommodate the widened southbound I-405 roadway. The work at the Cedar River Bridge is Stage 3 of I-405 Tukwila to Renton Improvement Project and is currently funded for construction during the same timeframe as the I-405 Renton to Bellevue Project, Stage 1. The Stage 3 stormwater concepts have changes from those that were developed to support the 2008 I-405, Tukwila to Renton Improvement Project (I-5 to SR 169 Phase 2) Environmental Assessment. The smaller scope of Stage 3 does not support the advancing the larger concepts associated with full build-out. Within the Cedar River Threshold Discharge Area (TDA), the large constructed stormwater treatment wetland and the new discharge to the Cedar River would not be constructed (Exhibit 15). Stage 3 would increase the pollutant generating impervious surface area (PGIS) by 0.35 acre within the City of Renton. However, the Project would treat both the full 0.35 acre of new PGIS and the remaining PGIS south of the Cedar River (Exhibit 9). The work falls within the Cedar River drainage basin and extends from Mile Post (MP) 3.04 to MP 4.00. The project evaluation includes TDAs which represent individual highway drainage areas that outlet to a single natural discharge location or multiple natural discharge locations that combine within ¼ mile downstream (as determined by the shortest flow path). I-405 runoff is collected within independent WSDOT storm drainage systems. Those systems discharge on each side of the Cedar River. They are considered one TDA because the outfalls combine in the Cedar River at the point along the River just downstream of the I-405 crossing. The WSDOT Highway Runoff Manual provides a variety of enhanced runoff treatment BMPs that focus on removal of sediment and metals. The conceptual design proposes to install compost-amended biofiltration swales (CABS) runoff treatment to treat 10.50 acres of highway runoff that currently flows through the spill containment pond located between Cedar Ave S and Renton Ave S at Mile Post (MP) 3.60 (Exhibit 16). These new facilities fall within the City of Renton Cedar Valley Aquifer Groundwater Protection Zones 1 and would be designed in accordance with Renton Municipal Code 4-3-050 Critical Areas Regulation. A concrete liner is anticipated, and WSDOT is working through the details of gaining approval for them to be open top to facilitate maintenance. The existing media filter drain type 4 runoff treatment facility would remain on west side of I-405 at MP 3.90. The spill containment pond and runoff treatment on the north side of the Cedar River at MP 3.95 would also remain. The projects would replace many structures within the project limits in areas of pavement widening. Closed conveyance systems would be used as the preferred conveyance method along the I-405 corridor due to the site constraints. Roadway widening would require new collection structures along the new edge of pavement. These new structures would connect to the existing drainage systems. Existing conveyance would be modified as required to satisfy water quality treatment and flow control measures. The conceptual design has only considered conveyance as it relates to the feasibility of establishing collection areas for runoff treatment and flow control. Detailed conveyance plans would be produced during the final design. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 24 of 27 Note that the final design would continue to develop these stormwater management concepts. The design-build contract would specify performance standards based on the Washington State Department of Transportation (WSDOT) Highway Runoff Manual requirements. This design is one solution that would meet that standard, but this information is subject to change during final design, using equivalent mitigation measures. 5. Use Regulations: a. Utilities: Compliant if conditions of approval are met Local utility services needed to serve water-dependent and other permitted uses within critical areas and associated buffers are subject to standards for ecological protection and ensure that activities do not threaten public safety, cause nuisances, or destroy or degrade critical area functions and values. Staff Comment: A King County facility, the Cedar River Trunk Section 1, is located near the project site (Exhibit 14). King County has a permanent easement for this facility on the proposed development site and must be assured the right to maintain and repair the facility. In the event that the facility must be relocated, a new permanent easement must be provided. Construction drawing for the project would be provided to WTD when they become available. A portion of the project is within Zone 1 (1-year capture zone) and also in Zone 2 (5-year capture zone) of the City’s Sole Source Aquifer Protection Area (Exhibit 11). The project is subject to applicable City codes, development regulations and standards as described under RMC 4-3-050 Critical Areas Regulations that are related to Wellhead Protection Areas. The installation of deep piling and new bridge pier adjacent to the Cedar River can adversely impact the water quality of the shallow drinking water aquifer. Staff recommends, as a condition of approval, that the applicant be required to install a shallow footing system that minimizes the impact and degradation of the ground water. In addition, the applicant would be responsible for developing and submitting to the City a groundwater monitoring plan to monitor for the presence of contaminants resulting from construction activities near the City’s drinking water wells. Finally, the applicant would be accountable for developing and submitting to the City a water pollution control, spill prevention and emergency response plans and aquifer protection measures to be implemented during various stages of construction. Spill containment ponds shall be made of concrete and lined with a landfill liner material. A leak detection and monitoring system shall also be provided by WSDOT to the City of Renton.  Modifications to existing regional stormwater management facilities operated and maintained under the direction of the City Surface Water Utility that are designed consistent with the current version of the Washington State Department of Ecology Wetlands and Stormwater Management Guidelines or meeting equivalent objectives. Compliant if conditions of approval are met New utility lines and facilities may be permitted to cross water bodies in accordance with an approved stream/lake study, if they comply with the following criteria: i. Fish and wildlife habitat areas shall be avoided to the maximum extent possible; and ii. The utility is designed consistent with one or more of the following methods: DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 25 of 27 CONCLUSIONS: The proposed development is consistent with the following findings pursuant to RMC section 4-3-050: 1. A proposed action meets alternative administrative standards pursuant to this Section and the proposed activity results in no net loss of regulated riparian area or shoreline ecological function in the drainage basin where the site is located if submitted plans are followed and the conditions of approval are met. 2. The activity will be conducted using best management practices as specified by industry standards or applicable Federal agencies or scientific principles if submitted plans are followed and the conditions of approval are met. 3. Impacts will be minimized and disturbed areas will be immediately restored if submitted plans are followed and the conditions of approval are met. 4. Both onsite and offsite mitigation will be provided for this project if submitted plans are followed and the conditions of approval are met. (a) Installation shall be accomplished by boring beneath the scour depth and hyporheic zone of the water body and channel migration zone; or (b) The utilities shall cross at an angle greater than sixty (60) degrees to the centerline of the channel in streams or perpendicular to the channel centerline; or (c) Crossings shall be contained within the footprint of an existing road or utility crossing; and iii. New utility routes shall avoid paralleling the stream or following a down-valley course near the channel; and iv. The utility installation shall not increase or decrease the natural rate of shore migration or channel migration; and v. Seasonal work windows are determined and made a condition of approval; and vi. Mitigation criteria of RMC 4-3-050L are met. Staff Comment: The preliminary design utilizes several avoidance and minimization opportunities including selective widening, widening to the median, and use of over steepened slopes and retaining walls. As a condition of approval, staff is recommending that the applicant submit monitoring reports detailing the adherence to performance standards and success standards with respect to the preservation, enhancement and functionality of fish and wildlife habitat to the City of Renton annually during construction and for a period of five (5) years from project completion for City review and comment. WSDOT would report if performance measures and success standards have been met. If the performance measures or success standards have not been met, the City would require adaptive management strategies to be deployed to achieve the final success standards. Staff also recommends, as a condition of approval, that the I-405 Tukwila to Renton Improvement Project, Stage 3 shall be located and designed to avoid natural, historic, archaeological or cultural resources to the maximum extent feasible and mitigate adverse impacts where unavoidable. If any cultural resources are found all construction activity shall stop and the owner/developer shall immediately notify the City of Renton planning department, concerned Tribes’ cultural committees, and the Washington State Department of Archeology and Historic Preservation. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 26 of 27 5. Compensatory mitigation projects will be monitored for a period necessary to establish that performance standards have been met, but generally not for a period less than five (5) years, if submitted plans are followed and the conditions of approval are met. Development of this project shall be undertaken pursuant to the following conditions: 1. The applicant, Washington State Department of Transportation (WSDOT) Northwest Region, shall provide a lighting plan that adequately provides for pedestrian safety and reduces artificial lighting from I-405 Cedar River Bridge that negatively impacts juvenile salmon out-migrating from the Cedar River. The lighting plan shall be submitted with the construction permit application to be reviewed and approved by the Current Planning Project Manager prior to construction permit approval. 2. I-405 Tukwila to Renton Improvement Project, Stage 3 shall be located and designed to avoid natural, historic, archaeological or cultural resources to the maximum extent feasible and mitigate adverse impacts where unavoidable. If any Native American grave(s) or archaeological/cultural resources (Indian artifacts) are found, all construction activity shall stop and the owner/developer shall immediately notify the City of Renton planning department, concerned Tribes’ cultural committees, and the Washington State Department of Archeological and Historic Preservation. 3. The applicant shall complete an inter-local agreement (ILA) for offsite mitigation planting at Ron Regis Park. Elements of the agreement would include a detailed landscape plan with maintenance and temporary irrigation. The ILA and detailed landscape plan shall be submitted with the construction permit application to be reviewed and approved by the Current Planning Project Manager prior to construction permit approval. 4. The applicant shall be required to install a shallow footing system that minimizes the impact and degradation of the ground water. In addition, the applicant would be responsible for developing and submitting to the City a groundwater monitoring plan to monitor for the presence of contaminants resulting from construction activities near the City’s drinking water wells. Finally, the applicant would be accountable for developing and submitting to the City a water pollution control, spill prevention and emergency response plans and aquifer protection measures to be implemented during various stages of construction. Spill containment ponds shall be made of concrete and lined with a landfill liner material. A leak detection and monitoring system shall also be provided by WSDOT to the City of Renton. 5. The applicant shall submit monitoring reports detailing the adherence to performance standards and success standards with respect to the preservation, enhancement and functionality of fish and wildlife habitat to the City of Renton annually during construction and for a period of five (5) years from project completion for City review and comment. WSDOT shall report if performance measures and success standards have been met. If the performance measures or success standards have not been met, the City would require adaptive management strategies to be deployed to achieve the final success standards. This Permit is granted pursuant to the Shoreline Management Action of 1971 and pursuant to the following: 1. The issuance of a license under the Shoreline Management Act of 1971 shall not release the applicant from compliance with federal, state, and other permit requirements. 2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management Act of 1971 in the event the permittee fails to comply with any condition(s) hereof. 3. Construction permits shall not be issued until twenty-one (21) days after approval by the Washington State Department of Ecology or until any review proceedings initiated within this twenty-one (21) day review period have been completed. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 City of Renton Department of Community & Economic Development Shoreline Management Permit I-405, TUKWILA TO RENTON IMPROVEMENT PROJECT, STAGE 3 LUA17-000810, SM, CAR DATE OF PERMIT: July 11, 2018 Page 27 of 27 DATE OF DECISION ON LAND USE ACTION: SIGNATURE: Jennifer Henning, AICP, Planning Director Department of Community & Economic Development Date APPEALS: Appeals of Shoreline Substantial Development Permit issuance must be made directly to the Shorelines Hearings Board. Appeals are made by filing a request in writing within the twenty-one (21) days of receipt of the final order and concurrently filing copies of such request with the Washington State Department of Ecology and the Attorney General’s office as provided in section 18(1) of the Shorelines Management Act of 1971. All copies of appeal notices shall also be filed with the City of Renton Planning Division and the City Clerk’s office. EXPIRATION: Unless a different time period is specified in the shoreline permit as authorized by RCW 90.58.143 and subsection J1 of RMC 4-9-190, construction activities, or a use or activity, for which a permit has been granted pursuant to this Master Program must be commenced within two (2) years of the effective date of a shoreline permit, or the shoreline permit shall terminate, and a new permit shall be necessary. However, the Planning Division may authorize a single extension for a period not to exceed one year based on reasonable factors, if a request for extension has been filed with the Planning Division before the expiration date, and notice of the proposed extension is given to parties of record and the Washington State Department of Ecology. DEFINITION OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES: the construction applications must be submitted, permits must be issued, and foundation inspections must be completed before the end of the two (2) year period. Attachments: Project Exhibits 1-19 cc: Kimberly Toal / Contact Linda Cooley / Applicant Karen Walter / Muckleshoot Indian Tribe Fisheries Division Ebert, Lampard, Olson, Ziegler / Parties of Record Attorney General’s Office DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 7/11/2018 | 2:13 PM PDT CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ADMINISTRATIVE DECISION REPORT EXHIBITS Project Name: I-405, Tukwila to Renton Improvement Project, Stage 3 Project Number: LUA17-000810, SM, CAR Date of Decision July 11, 2018 Staff Contact Clark H. Close Senior Planner Project Contact/Applicant Kimberly Toal, I-405 Team / 600 108th Ave NE Suite 900, Bellevue, WA 98004 Project Location I-405 MP 0.0 to MP 4.0, Cedar River Crossing, Renton, WA 98057 The following exhibits are included with the Shoreline Management/Critical Areas Report: Exhibit 1: Environmental (SEPA) Determination of Nonsignificance (DNS) for the I-405 Renton to Bellevue Project Exhibit 2: Project Description Maps Exhibit 3: Vicinity Map Exhibit 4: Conceptual Site Plan Exhibit 5: Topographic Map Exhibit 6: Tree Removal and Planting Plan Exhibit 7: Grading Plan Exhibit 8: Utility Plan Exhibit 9: Summary of Stormwater Management Concepts Exhibit 10: Geology and Soils Technical Report (dated March 2006) Exhibit 11: City of Renton (COR) Maps – Critical Areas Maps (Aquifer Protection Areas, Flood Areas, Flood Hazard Areas, Geologic Hazard Ares, and Regulated Slopes) Exhibit 12: Muckleshoot Indian Tribe Fisheries Division Comments Exhibit 13: Response Comments to the Muckleshoot Indian Tribe Fisheries Division Exhibit 14: King County Wastewater Treatment Division (WTD) Comments Exhibit 15: Proposed Post-Project TDA Boundaries Exhibit 16: Impervious Area Map Exhibit 17: Stream Buffer Mitigation at Cedar River Exhibit 18: Cedar River Trail Reroute Exhibit 19: Advisory Notes to Applicant DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 1 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! !! ! ! §¨¦405 §¨¦5 UV518 WesternProjectLimit Gillam Creek Southcenter Blvd Klickitat Dr SouthcenterParkwayW e s t f i e l dSouthcente r T u k w i l aCityHall Tukwila Parkway S 1 5 2 n d S t51st Ave SC r y s t a lSpringsPark 51st Ave SS 1 6 0 t h S t 62nd Ave ST U K W I L A S E A T A C Sl adeWayI-405 SouthboundExtend southbound HOV to west MP 0.1 MP 0.2 MP 0.3 MP 0.4 MP 0.5 MP 0.6 TUKWILA RENTON§¨¦405 UV169§¨¦5 UV167UV181 UV518 SEATAC 1 2 3 !Mile Post (MP) Proposed LaneStriping Proposed RetainingWall Proposed AdditionalPavement ProposedStormwaterTreatment Facility Proposed BridgeStructure Railroad Trail Stream or NaturalDrainage Park Muncipality TRIP Stage 2 Lane Striping Stream Realignment / 0 500 FeetEXHIBIT 2 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! ! ! ! ! ! ! ! ! ! !§¨¦405 UV167 SW 19th St Lake Ave S S 15th St Benson Rd S S Grady Wa yRainierAveS RentonCityHall S 6th St BurnettLinear Park Talbot HillReservoirPark S Puge t D r T h u n d e r Hill s Cr e e kRollingHillsCreek S 19th StShattuckAveS TalbotRdSBensonDrSEagleRidgeDrSUV515 I-405 MainlineConstruct one new lane inboth the southboundand northbound directions R o lli n gHillsCreekMP 2.2 MP 2.3 MP 2.4 MP 2.5 MP 2.6 MP 2.7 MP 2.8 MP 2.9 MP 3.0 MP 3.1 MP 3.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 UV167UV181 UV518 SEATAC 1 2 3 !Mile Post (MP) Proposed LaneStriping Proposed RetainingWall Proposed AdditionalPavement ProposedStormwaterTreatment Facility Proposed BridgeStructure Railroad Trail Stream or NaturalDrainage Park Muncipality TRIP Stage 2 Lane Striping Stream Realignment / 0 500 Feet DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! ! ! ! ! ! ! ! ! ! ! §¨¦405 UV169 NarcoProperty I-405 SouthboundWiden bridge structureover Cedar River Renton AveReconstruct bridge structure Cedar AveReconstruct bridge structure NorthernProjectLimit RentonCityHall BurnettLinear Park Cedar RiverNatural Area Cedar RiverPark LibertyPark JonesPark PiazzaPark TonkinsPark VeteransMemorialParkWilliam Ave SWells Ave SBronson Way NN 2nd St M aple Valley H wy NE3rdSt Ceda r R i v e r T r a i l CedarRiver Main Ave SS 7th St Beacon W ay S JonesPark I-405 MainlineConstruct one new lanein both the southboundand northbound directions SGradyWayMP 3.2 MP 3.3 MP 3.4 MP 3.5 MP 3.6 MP 3.7 MP 3.8 MP 3.9 MP 4.0 MP 4.1 MP 4.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 UV167UV181 UV518 SEATAC 1 2 3 !Mile Post (MP) Proposed LaneStriping Proposed RetainingWall Proposed AdditionalPavement ProposedStormwaterTreatment Facility Proposed BridgeStructure Railroad Trail Stream or NaturalDrainage Park Muncipality TRIP Stage 2 Lane Striping Stream Realignment / 0 500 Feet DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 3 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 4 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 5 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 6 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 7 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 8 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ^hDDZzK&^dKZDtdZDE'DEdKEWd^ /ͲϰϬϱ dh<t/>dKZEdKE/DWZKsDEdWZK:dͲ ^d'ϯ dŚŝƐĚŽĐƵŵĞŶƚƐƵŵŵĂƌŝnjĞƐƚŚĞĐŽŶĐĞƉƚƵĂů ƐƚŽƌŵǁĂƚĞƌ ƉůĂŶŶŝŶŐ ĂŶĚ ĚĞƐŝŐŶ ĨŽƌ ƚŚĞ ƉƵƌƉŽƐĞƐ ŽĨ ƐƵƉƉŽƌƚŝŶŐŝƚLJŽĨZĞŶƚŽŶƉĞƌŵŝƚƐ ĨŽƌ ƚŚĞ/ͲϰϬϱdƵŬǁŝůĂƚŽZĞŶƚŽŶ/ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚʹ ^ƚĂŐĞϯ ;^ƚĂŐĞ ϯͿ͘dŚŝƐǁŽƌŬǁŝůůďĞŝŶĐůƵĚĞĚ ǁŝƚŚ /ͲϰϬϱZĞŶƚŽŶƚŽĞůůĞǀƵĞWƌŽũĞĐƚʹ ^ƚĂŐĞϭWƌŽũĞĐƚ ;^ƚĂŐĞϭͿ ĂƐŽŶĞ ĐŽŶƐƚƌƵĐƚŝŽŶƉƌŽũĞĐƚ ďLJt^KdƚŚƌŽƵŐŚĚĞƐŝŐŶͲďƵŝůĚĐŽŶƚƌĂĐƚŝŶŐ͘ dŚĞƐĐŽƉĞŽĨ^ƚĂŐĞϯ ĨĂůůƐĞŶƚŝƌĞůLJ ǁŝƚŚŝŶƚŚĞŝƚLJŽĨZĞŶƚŽŶ͘ WƌŽũĞĐƚĞƐĐƌŝƉƚŝŽŶ dŚĞƉƌŽũĞĐƚǁŝůůĐŽŵƉůĞƚĞŽŶĞŵŽƌĞƐƚĂŐĞŽĨƚŚĞƉƌŽũĞĐƚƐƚƵĚŝĞĚŝŶƚŚĞϮϬϬϴ/ͲϰϬϱ͕dƵŬǁŝůĂƚŽZĞŶƚŽŶ /ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚ;/ͲϱƚŽ^ZϭϲϵWŚĂƐĞϮͿŶǀŝƌŽŶŵĞŶƚĂůƐƐĞƐƐŵĞŶƚ͘dŚĞ/ͲϰϬϱ͕dƵŬǁŝůĂƚŽZĞŶƚŽŶ /ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚŝŵƉƌŽǀĞƐĂƉƉƌŽdžŝŵĂƚĞůLJϰ ŵŝůĞƐŽĨ/ͲϰϬϱďĞƚǁĞĞŶ/ͲϱŝŶdƵŬǁŝůĂ;D͘W͘Ϭ͘ϬͿĂŶĚ^Z ϭϲϵ;D͘W͘ϰ͘ϬͿŝŶZĞŶƚŽŶ͘ KƚŚĞƌ/ͲϰϬϱ͕dƵŬǁŝůĂƚŽZĞŶƚŽŶ/ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚƐƚĂŐĞƐĂƌĞĂƐĨŽůůŽǁƐ͗ ^ƚĂŐĞϭ͕ǁŚŝĐŚĂĚĚĞĚƚŚĞЪͲĚŝĂŵŽŶĚŝŶƚĞƌĐŚĂŶŐĞĂƚ^Zϱϭϱ;dĂůďŽƚZŽĂĚͿ ĂŶĚ ǁĂƐƉƌĞǀŝŽƵƐůLJ ĐŽŵƉůĞƚĞĚ͘ ^ƚĂŐĞϮ͕ǁŚŝĐŚĂĚĚƐ,KsĚŝƌĞĐƚͲĐŽŶŶĞĐƚŽƌƌĂŵƉƐĨƌŽŵƐŽƵƚŚďŽƵŶĚ/ͲϰϬϱƚŽƐŽƵƚŚďŽƵŶĚ^Zϭϲϳ ĂŶĚĨƌŽŵŶŽƌƚŚďŽƵŶĚ^ZϭϲϳƚŽŶŽƌƚŚďŽƵŶĚ/ͲϰϬϱ͕ĂŶĚŝƐƵŶĚĞƌĐŽŶƐƚƌƵĐƚŝŽŶǁŝƚŚĂŶĂŶƚŝĐŝƉĂƚĞĚ ĐŽŵƉůĞƚŝŽŶŝŶϮϬϭϴ͘ ^ƚĂŐĞϯ ŝƐĐƵƌƌĞŶƚůLJĨƵŶĚĞĚƚŽďĞĐŽŶƐƚƌƵĐƚĞĚĚƵƌŝŶŐƚŚĞƐĂŵĞƚŝŵĞĨƌĂŵĞĂƐƚŚĞ/ͲϰϬϱZĞŶƚŽŶƚŽ ĞůůĞǀƵĞ/ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚʹ ^ƚĂŐĞϭ͘ ^ƚĂŐĞϰĂŶĚŽƚŚĞƌĨƵƚƵƌĞƐƚĂŐĞƐĂƌĞƵŶĨƵŶĚĞĚĂŶĚǁŝůůďĞĐŽŵƉůĞƚĞĚĂƚĂƚŝŵĞLJĞƚƚŽďĞ ĚĞƚĞƌŵŝŶĞĚ͘ :ƵƐƚĞĂƐƚŽĨ/Ͳϱ͕^ƚĂŐĞϯŝŵƉƌŽǀĞŵĞŶƚƐŝŶĐůƵĚĞǁŝĚĞŶŝŶŐĂůŽŶŐƐŽƵƚŚďŽƵŶĚ/ͲϰϬϱƚŽƚŚĞŝŶƐŝĚĞĨŽƌ ĂƉƉƌŽdžŝŵĂƚĞůLJϱϬϬĨĞĞƚƚŽĞdžƚĞŶĚƚŚĞƐŽƵƚŚďŽƵŶĚ,KsůĂŶĞǁĞƐƚ͘tŝƚŚƚŚŝƐǁŝĚĞŶŝŶŐ͕ƚŚĞ,KsůĂŶĞǁŝůů ďĞĞdžƚĞŶĚĞĚĂƉƉƌŽdžŝŵĂƚĞůLJϱϬϬĨĞĞƚƉĂƐƚƚŚĞƐƉůŝƚƚŽƚŚĞƐŽƵƚŚďŽƵŶĚ/ͲϰϬϱƚŽŶŽƌƚŚďŽƵŶĚ/ͲϱŽĨĨͲ ĐŽŶŶĞĐƚŝŽŶ͘ƵƌƌĞŶƚůLJ͕ƚŚĞƐŽƵƚŚďŽƵŶĚ,KsůĂŶĞĞŶĚƐĂƚƚŚĞŽĨĨͲĐŽŶŶĞĐƚŝŽŶƚŽŶŽƌƚŚďŽƵŶĚ/Ͳϱ͘ ĞƚǁĞĞŶ^ZϭϲϳĂŶĚ^Zϭϲϵ͕^ƚĂŐĞϯ ŝŵƉƌŽǀĞŵĞŶƚƐŝŶĐůƵĚĞĐŽŵďŝŶŝŶŐƚŚĞƚǁŽĞdžŝƐƚŝŶŐŝŶƚĞƌŝŽƌůĂŶĞƐ ;ƚŚĞĞdžŝƐƚŝŶŐ,KsĂŶĚĂĚũĂĐĞŶƚŐĞŶĞƌĂůͲƉƵƌƉŽƐĞůĂŶĞƐͿƚŽĐƌĞĂƚĞĂŶĞǁĚƵĂůůĂŶĞĞdžƉƌĞƐƐƚŽůůƐLJƐƚĞŵŝŶ ďŽƚŚĚŝƌĞĐƚŝŽŶƐ͘^ŽƵƚŚďŽƵŶĚ/ͲϰϬϱǁŝůůďĞǁŝĚĞŶĞĚ ƚŽƚŚĞŽƵƚƐŝĚĞŝŶĐůƵĚŝŶŐǁŝĚĞŶŝŶŐƚŚĞƐŽƵƚŚďŽƵŶĚ/Ͳ ϰϬϱďƌŝĚŐĞŽǀĞƌƚŚĞĞĚĂƌZŝǀĞƌƚŽĂĚĚŽŶĞŶĞǁƐŽƵƚŚďŽƵŶĚůĂŶĞ͕ĂŶĚƚŚĞĞdžŝƐƚŝŶŐŶŽƌƚŚďŽƵŶĚŽƵƚƐŝĚĞ ƐŚŽƵůĚĞƌǁŝůůďĞĐŽŶǀĞƌƚĞĚŝŶƚŽĂŶŽƌƚŚďŽƵŶĚƉĞĂŬͲƵƐĞƐŚŽƵůĚĞƌ ůĂŶĞ͘^ƚƌƵĐƚƵƌĞƐŽǀĞƌ/ͲϰϬϱĂƚĞĚĂƌ ĂŶĚZĞŶƚŽŶǀĞŶƵĞƐǁŝůůďĞƌĞĐŽŶƐƚƌƵĐƚĞĚƚŽĂĐĐŽŵŵŽĚĂƚĞƚŚĞǁŝĚĞŶĞĚƐŽƵƚŚďŽƵŶĚ/ͲϰϬϱƌŽĂĚǁĂLJ͘ EŽƚĞƚŚĂƚƚŚĞĨŝŶĂůĚĞƐŝŐŶǁŝůůĐŽŶƚŝŶƵĞƚŽĚĞǀĞůŽƉƚŚĞƐĞƐƚŽƌŵǁĂƚĞƌŵĂŶĂŐĞŵĞŶƚĐŽŶĐĞƉƚƐ͘dŚĞĚĞƐŝŐŶͲ ďƵŝůĚĐŽŶƚƌĂĐƚ ǁŝůů ƐƉĞĐŝĨLJ ƉĞƌĨŽƌŵĂŶĐĞ ƐƚĂŶĚĂƌĚƐ ďĂƐĞĚŽŶƚŚĞtĂƐŚŝŶŐƚŽŶ ^ƚĂƚĞ ĞƉĂƌƚŵĞŶƚ ŽĨ dƌĂŶƐƉŽƌƚĂƚŝŽŶ;t^KdͿ ,ŝŐŚǁĂLJZƵŶŽĨĨDĂŶƵĂů ƌĞƋƵŝƌĞŵĞŶƚƐ͘dŚŝƐĚĞƐŝŐŶŝƐŽŶĞƐŽůƵƚŝŽŶƚŚĂƚǁŝůůŵĞĞƚ ƚŚĂƚƐƚĂŶĚĂƌĚ͕ďƵƚƚŚŝƐŝŶĨŽƌŵĂƚŝŽŶŝƐƐƵďũĞĐƚƚŽĐŚĂŶŐĞĚƵƌŝŶŐĨŝŶĂůĚĞƐŝŐŶ͕ƵƐŝŶŐĞƋƵŝǀĂůĞŶƚŵŝƚŝŐĂƚŝŽŶ ŵĞĂƐƵƌĞƐ͘ EXHIBIT 9 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ,7XNZLODWR5HQWRQ,PSURYHPHQW3URMHFW ,WR65²3KDVH  *(2/2*<$1'62,/6 7(&+1,&$/0(025$1'80 -XO\  G D § B B à  G / D N H : D V K L Q J W R Q ¨ ® Ë Ñ ª Ê Ä £ ¿  EXHIBIT 10 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 11 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! !! ! ! §¨¦405 §¨¦5 UV518 WesternProjectLimit Sout h c e n t e r B l v d Klic k i t a t D r Southcenter Parkway Tukwila Parkway S 152nd St51st Ave S51st Ave SS 1 6 0 t h S t 62nd Ave ST U K W I L A S E A T A C Sl adeWayI-405 SouthboundExtend southboundHOV to west MP 0.1 MP 0.2 MP 0.3 MP 0.4 MP 0.5 MP 0.6 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3 Legend !Mile Post (MP) Existing Right of Way Muncipality Shoreline FEMA 100-Year Floodplain FEMA 500-Yr Floodplain / 0 500 Feet Sheet 1 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Flood Hazard Areas and Shorelines FEMA Floodway RECEIVED 11/28/2017 cclose PLANNING DIVISION DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! ! ! ! ! ! ! ! ! ! !§¨¦405 UV167 SW 19th St Lake Ave S S 15th St Benson Rd S S Grady Wa yRainierAveS S 6th St S Puge t D r S 19th StShattuckAveS TalbotRdSBensonDrSEagleRidgeDrSUV515 I-405 MainlineConstruct one new lane inboth the southboundand northbound directions MP 2.2 MP 2.3 MP 2.4 MP 2.5 MP 2.6 MP 2.7 MP 2.8 MP 2.9 MP 3.0 MP 3.1 MP 3.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3/ 0 500 Feet Sheet 2 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Flood Hazard Areas and Shorelines Legend !Mile Post (MP) Existing Right of Way Muncipality Shoreline FEMA 100-Year Floodplain FEMA 500-Yr Floodplain FEMA Floodway DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! ! ! ! ! ! ! ! ! ! ! ! §¨¦405 UV169 I-405 SouthboundWiden bridge structureover Cedar River Renton AveReconstruct bridge structure Cedar AveReconstruct bridge structure NorthernProjectLimit William Ave SWells Ave SN 2nd St M aple Valley H w y NE3rdSt Main Ave SS 7th St Beacon W ay S I-405 MainlineConstruct one new lanein both the southboundand northbound directions I-40Construct one new lane inboth the southboundand northbound directions Brons o n W a y N MP 3.2 MP 3.3 MP 3.4 MP 3.5 MP 3.6 MP 3.7 MP 3.8 MP 3.9 MP 4.0 MP 4.1 MP 4.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3/ 0 500 Feet Sheet 3 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Flood Hazard Areas and Shorelines Legend !Mile Post (MP) Existing Right of Way Muncipality Shoreline FEMA 100-Year Floodplain FEMA 500-Yr Floodplain FEMA Floodway DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! !! ! ! §¨¦405 §¨¦5 UV518 WesternProjectLimit Sout h c e n t e r B l v d Klic k i t a t D r Southcenter Parkway Tukwila Parkway S 152nd St51st Ave S51st Ave SS 1 6 0 t h S t 62nd Ave ST U K W I L A S E A T A C Sl adeWayI-405 SouthboundExtend southboundHOV to west MP 0.1 MP 0.2 MP 0.3 MP 0.4 MP 0.5 MP 0.6 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3 Legend !Mile Post (MP) Existing Right of Way Muncipality Erosion Hazard Area Seismic Hazard Area Moderate HazardHigh HazardVery High Hazard Moderate HazardHigh Hazard / 0 500 Feet Sheet 1 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Geologic Hazard Areas Landslide Hazard Areas Coal Mine Hazard Areas RECEIVED 11/28/2017 cclose PLANNING DIVISION DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! ! ! ! ! ! ! ! ! ! !§¨¦405 UV167 SW 19th St Lake Ave S S 15th St Benson Rd S S Grady Wa yRainierAveS S 6th St S Puge t D r S 19th StShattuckAveS TalbotRdSBensonDrSEagleRidgeDrSUV515 I-405 MainlineConstruct one new lane inboth the southboundand northbound directions MP 2.2 MP 2.3 MP 2.4 MP 2.5 MP 2.6 MP 2.7 MP 2.8 MP 2.9 MP 3.0 MP 3.1 MP 3.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3/ 0 500 Feet Sheet 2 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Geologic Hazard Areas Legend !Mile Post (MP) Existing Right of Way Muncipality Erosion Hazard Area Seismic Hazard Area Moderate HazardHigh HazardVery High Hazard Moderate HazardHigh Hazard Landslide Hazard Areas Coal Mine Hazard Areas DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! ! ! ! ! ! ! ! ! ! ! ! §¨¦405 UV169 I-405 SouthboundWiden bridge structureover Cedar River Renton AveReconstruct bridge structure Cedar AveReconstruct bridge structure NorthernProjectLimit William Ave SWells Ave SN 2nd St M aple Valley H w y NE3rdSt Main Ave SS 7th St Beacon W ay S I-405 MainlineConstruct one new lanein both the southboundand northbound directions I-40Construct one new lane inboth the southboundand northbound directions Brons o n W a y N MP 3.2 MP 3.3 MP 3.4 MP 3.5 MP 3.6 MP 3.7 MP 3.8 MP 3.9 MP 4.0 MP 4.1 MP 4.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3/ 0 500 Feet Sheet 3 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Geologic Hazard Areas Legend !Mile Post (MP) Existing Right of Way Muncipality Erosion Hazard Area Seismic Hazard Area Moderate HazardHigh HazardVery High Hazard Moderate HazardHigh Hazard Landslide Hazard Areas Coal Mine Hazard Areas DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! !! ! ! §¨¦405 §¨¦5 UV518 WesternProjectLimit Sout h c e n t e r B l v d Klic k i t a t D r Southcenter Parkway Tukwila Parkway S 152nd St51st Ave S51st Ave SS 1 6 0 t h S t 62nd Ave ST U K W I L A S E A T A C Sl adeWayI-405 SouthboundExtend southboundHOV to west MP 0.1 MP 0.2 MP 0.3 MP 0.4 MP 0.5 MP 0.6 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3 Legend !Mile Post (MP) Existing Right of Way Muncipality >90% / 0 500 Feet Sheet 1 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Steep Slopes Steep Slopes >15% & <=25%>25% & <=40%>40% & <=90% RECEIVED 11/28/2017 cclose PLANNING DIVISION DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! ! ! ! ! ! ! ! ! ! !§¨¦405 UV167 SW 19th St Lake Ave S S 15th St Benson Rd S S Grady Wa yRainierAveS S 6th St S Puge t D r S 19th StShattuckAveS TalbotRdSBensonDrSEagleRidgeDrSUV515 I-405 MainlineConstruct one new lane inboth the southboundand northbound directions MP 2.2 MP 2.3 MP 2.4 MP 2.5 MP 2.6 MP 2.7 MP 2.8 MP 2.9 MP 3.0 MP 3.1 MP 3.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3/ 0 500 Feet Sheet 2 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Steep Slopes Legend !Mile Post (MP) Existing Right of Way Muncipality >90% Steep Slopes >15% & <=25%>25% & <=40%>40% & <=90% DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ! ! ! ! ! ! ! ! ! ! ! ! ! §¨¦405 UV169 I-405 SouthboundWiden bridge structureover Cedar River Renton AveReconstruct bridge structure Cedar AveReconstruct bridge structure NorthernProjectLimit William Ave SWells Ave SN 2nd St M aple Valley H w y NE3rdSt Main Ave SS 7th St Beacon W ay S I-405 MainlineConstruct one new lanein both the southboundand northbound directions I-40Construct one new lane inboth the southboundand northbound directions Brons o n W a y N MP 3.2 MP 3.3 MP 3.4 MP 3.5 MP 3.6 MP 3.7 MP 3.8 MP 3.9 MP 4.0 MP 4.1 MP 4.2 TUKWILA RENTON§¨¦405 UV169§¨¦5 SEATAC 1 2 UV167 3/ 0 500 Feet Sheet 3 of 3 I-405, Tukwila to Renton Improvement Project, Stage 3Steep Slopes Legend !Mile Post (MP) Existing Right of Way Muncipality >90% Steep Slopes >15% & <=25%>25% & <=40%>40% & <=90% DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 1 Clark Close From:Karen Walter <KWalter@muckleshoot.nsn.us> Sent:Friday, December 22, 2017 9:35 AM To:Clark Close Subject:WSDOT I-405 Renton to Bellevue -405, Tukwila to Renton Improvement Project, Stage 3 / LUA17-000810, Notice of Application for Shoreline Substantial Development Permit and Critical Areas Permit Attachments:Tabor-etal-Artif-lighting-Oct14-2010.pdf; Tabor et al Light Intensity on predation of sockeye fry by cottids in Cedar River 2001.pdf Clark, We have reviewed WSDOT’s Notice of Application for the Stage 3, I-405 Tukwila to Renton project referenced above. We have initial comments and questions as noted below: 1. Lighting on I-405 Bridge over Cedar River With the expansion of the existing bridge crossing on the Cedar River, the applicant needs to develop a plan to reduce artificial lighting from the bridge structure that negatively impacts juvenile salmon outmigrating from the Cedar River (see attached). We raised this concern in our comments to the 2008 NEPA EA. 2. Tree removal along Cedar River Additional details are needed regarding the proposed tree removal within the regulated shoreline. Specifically, how many trees; their diameters/heights; and tree species to be removed and the functions they provide. The proposed mitigation details that discuss how these removed trees will be mitigated, particularly for future wood recruitment needs to be provided. 3. Stormwater improvements Please clarify if this project will be providing further treatment of stormwater. The stormwater concepts indicate that there will be no improvements with Stage 3; however, the project is adding pollutant generating impervious surfaces by 0.35 acres. This increase should be fully treated as part of this project to reduce impacts to salmon in the Cedar River. 4. Houser and BNSF bridges The NOA mentions the Houser and BNSF bridges in the project area. It was our understanding that these bridges may also need to be modified or replaced to implement the complete Tukwila to Renton project. Is this still the case? If yes, when will the work occur for these bridges? We appreciate the opportunity to comment on this proposal and look forward to the City/applicants’ responses. Karen Walter Watersheds and Land Use Team Leader Muckleshoot Indian Tribe Fisheries Division Habitat Program Phillip Starr Building 39015-A 172nd Ave SE Auburn, WA 98092 253-876-3116 EXHIBIT 12 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 1 Clark Close From:Clark Close Sent:Tuesday, March 06, 2018 9:56 AM To:'Karen Walter' Subject:RE: WSDOT I-405 Renton to Bellevue -405, Tukwila to Renton Improvement Project, Stage 3 / LUA17-000810, Notice of Application for Shoreline Substantial Development Permit and Critical Areas Permit Attachments:C_On_Hold_Letter_180118_v1.pdf; TRIP Response to Comments_signed.pdf Karen, Please find attached response comments from WSDOT regarding your initial comments and questions. A hard copy of the response comments are in the mail. Thank you for reviewing this project. Regards, Clark H. Close Senior Planner City of Renton 425-430-7289 From: Karen Walter [mailto:KWalter@muckleshoot.nsn.us] Sent: Friday, December 22, 2017 9:35 AM To: Clark Close <CClose@Rentonwa.gov> Subject: WSDOT I-405 Renton to Bellevue -405, Tukwila to Renton Improvement Project, Stage 3 / LUA17-000810, Notice of Application for Shoreline Substantial Development Permit and Critical Areas Permit Clark, We have reviewed WSDOT’s Notice of Application for the Stage 3, I-405 Tukwila to Renton project referenced above. We have initial comments and questions as noted below: 1. Lighting on I-405 Bridge over Cedar River With the expansion of the existing bridge crossing on the Cedar River, the applicant needs to develop a plan to reduce artificial lighting from the bridge structure that negatively impacts juvenile salmon outmigrating from the Cedar River (see attached). We raised this concern in our comments to the 2008 NEPA EA. 2. Tree removal along Cedar River Additional details are needed regarding the proposed tree removal within the regulated shoreline. Specifically, how many trees; their diameters/heights; and tree species to be removed and the functions they provide. The proposed mitigation details that discuss how these removed trees will be mitigated, particularly for future wood recruitment needs to be provided. 3. Stormwater improvements Please clarify if this project will be providing further treatment of stormwater. The stormwater concepts indicate that there will be no improvements with Stage 3; however, the project is adding pollutant generating impervious surfaces by 0.35 acres. This increase should be fully treated as part of this project to reduce impacts to salmon in the Cedar River. 4. Houser and BNSF bridges EXHIBIT 13 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 2 The NOA mentions the Houser and BNSF bridges in the project area. It was our understanding that these bridges may also need to be modified or replaced to implement the complete Tukwila to Renton project. Is this still the case? If yes, when will the work occur for these bridges? We appreciate the opportunity to comment on this proposal and look forward to the City/applicants’ responses. Karen Walter Watersheds and Land Use Team Leader Muckleshoot Indian Tribe Fisheries Division Habitat Program Phillip Starr Building 39015-A 172nd Ave SE Auburn, WA 98092 253-876-3116 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 RECEIVED 03/01/2018 cclose PLANNING DIVISION DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 Department of Natural Resources and Parks Wastewater Treatment Division King Street Center, KSC-NR-0505 201 South Jackson Street Seattle, WA 98104-3855 December 20, 2017 sent via email: cclose@rentonwa.gov Clark Close – Senior Planner CED – Planning Division 1055 South Grady Way Renton, WA 98057 Dear Clark Close: The King County Wastewater Treatment Division (WTD) has received the Notice of Application for the I-405, Tukwila to Renton Improvement Project, Stage 3 (LUA17-000810). A King County facility, the Cedar River Trunk Section 1, is located near the project site (see enclosed one line map showing the location of the facility). King County has a permanent easement for this facility on the proposed development site, and must be assured the right to maintain and repair the facility. In the event that the facility must be relocated, a new permanent easement must be provided. In order to protect this wastewater facility during construction, WTD requests that the City submit construction drawings for the project, so that WTD can assess its potential impacts. Please send drawings to: Mark Lampard, Local Public Agency Coordinator King County WTD, Engineering and Technical Resources 201 South Jackson Street, KSC-NR-0503 Seattle, WA 98104-3855 (206) 477-5414 / mark.lampard@kingcounty.gov Thank you for the opportunity to review and comment on this proposal. Sincerely, Grace Smith Water Quality Planner cc: Mark Lampard, Local Public Agency Coordinator Enclosure EXHIBIT 14 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 !(!( !( !(!(!(!( !(!(!(!(!(!(!( !(!( !( !( !( !( !(!(!( !( !( !(!(!( !( !( !( !( !( !( !( !(!(!(!( !( !( !( !( !( !(!(!(!( !( !( !(!( !(!( !(!( !( !( !( !ª !ª !ª RO1-13 RO1-14 RO1-15 RO1-16 RO1-17 RO1-18 RO1-19 RO1-20 RO1-21 RO1-22 RO1-23 RO1-24 RO1-25 RO1-26 RO1-31 RO1-32 RO2-01 RO2-02 RO2-03 RO1-15A RO1-31A RO1-25A R10-27 R10-21 R10-20 R10-26 R10-25 R10-19R10-18 R10-17R10-16 R10-15 R10-14 R10-13 R10-11 R10-26A R10-12A R10-11A R10-10A RO1-33 RO1-34 R10-09A R10-07A R10-06A RO1-35 R10-05A R10-04A R10-03A R10-24A R10-08AR10-02A R10-01A RO1-56 RO1-57RO1-59 RO1-12A R10-22 R10-24 R10-23 R10-12 RO1-58 Cedar River Interceptor Section 2 Cedar River Interceptor Section 1 Cedar River Interceptor Section 1 Bryn Mawr Trunk ESI Section 2 ESI Section 1 Boeing Renton Trunk ESI Section 1 1 4 4 C e d a r R i v e r 8 1 8 667 630 6 1 3 605 550540515495470 4 1 1 313 31 0293290 241 283 1 8 2 235 16082 122 6013 432 5 42 42 42 4242 I-405 FRWYPARK AVE NN E 3 R D S T NE 7TH ST B E A C ON WA Y S N 4TH ST NE 4TH ST MAIN AVE SGARDEN AVE NN 6TH ST WELLS AVE NPELLY AVE NWILLIAMS AVE SS 2ND ST S 7TH ST N 8TH ST LOGAN AVE NN 1 S T S T WELLS AVE SCEDAR AVE STALBOT RD SS 4TH ST S 5TH ST HIGH AVE SN 5TH ST S E 8 T H P L S E 4 T H S T S G RAD Y W AYSUNSET BLVD NRENTON AVE SGRANT AVE SN E 1ST ST H O U S E R W A Y S MILL AVE SSUNSET BLVD NEBRONSON WAY NEKIRKLAND AVE NEBENSON RD SHOUSER WAY NEDMONDS AVE NENE 5TH PL S E 8T H DR INDEX AVE NEN 2ND ST NE 6TH PL JONES AVE SCEDAR RI DGE DR S EN RIV E R SI D E D R BLAINE AVE NEHARRINGTON AVE NEBURNETT AVE NSE 2ND CT FERNDALE AVE SENE 8TH PL SE 3RD ST NE 8TH ST SLATER ST SMONTEREY DR NECAPRI AVE NESE 8TH STS 3RD STSE 2ND PL NE 2ND ST JEFFERSON AVE NEGLENNWOOD PL SEINDEX PL NESMITHERS AVE SN MARION ST N E 2 N D P L S 6TH ST NE 4TH CT S 10TH ST INDEX AVE SENE 5TH CT S 6TH STMILL AVE SS 4TH ST RENTON AVE SGRANT AVE SHOUSER WAY NN E 8 T H S T I-405 FRWYSE 3RD ST EDMONDS AVE NESE 3RD STNE 5 T H P L S 3RD ST SE 8TH PL SE 2ND PL I -405 FRWYNE 4TH ST N 3RD ST MA P L E V A L L E Y HWY R OY A L HI L L S DR S E !( !( !( !( R10-12 R10-13 R10-14 R10-15 550 1 4 4 4 1 1 5 0 2 9 42 4 2 4 2 1 8 4 2 Cedar River Interceptor Sect. 1 RE*CEDAR1 - 600 0 600300 Feet 65 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 15 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 EXHIBIT 16 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 INTERSTATE 405 Project TeamDESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. FILE NAME TIME DATE 6/6/2018 c:\users\taylorsu\pw_wsdot\d0139111\XL4653_EB_Mitigation_Planting_08_RentonPark.dgn REVISION BY SHEET OF SHEETS P.E. STAMP BOX P.E. STAMP BOX LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH10 PLOTTED BY DATE . . . . . . . taylorsu 3:22:24 PM Washington State Department of Transportation 8 8 XL4653 L. ENG C. BARNETT R. THOMAS L. COOLEY S. TAYLOR SCIENTIFIC NAME SYMPHORICARPOS ALBUS SALIX SITCHENSIS RUBUS SPECTABILIS RUBUS PARVIFLORUS ROSA NUTKANA POLYSTICHUM MUNITUM PHYSOCARPUS CAPITATUS CORNUS SERICEA ACER MACROPHYLLUM FRAXINUS LATIFOLIA TSUGA HETEROPHYLLA THUJA PLICATA PSEUDOTSUGA MENZIESII COMMON NAME SNOWBERRY SITKA WILLOW SALMONBERRY THIMBLEBERRY NOOTKA ROSE SWORD FERN PACIFIC NINE BARK RED-OSIER DOGWOOD BIG LEAF MAPLE OREGON ASH WESTERN HEMLOCK WESTERN RED CEDAR DOUGLAS FIR SIZE SCALE IN FEET 0 25 50 CORRIDOR WIDENING & EXPRESS TOLL LANES RENTON TO BELLEVUE I-405 CEDAR RIVER STREAM BUFFER MITIGATION 11.2% 11.2% 11.2% 7.5% 11.2% 7.5% 7.5% 7.5% 5.0% 4.0% 5.0% 6.2% 5.0% % OF MIX NOTES: 1 GAL. 1 GAL. 1 GAL. 1 GAL. 1 GAL. 1 GAL. 1 GAL. 1 GAL. 2 GAL 2 GAL 2 GAL 2 GAL 2 GAL TO BE INSTALLED IN WETTER CONDITIONS. TO BE INSTALLED IN DRIER CONDITIONS. 1 2 1 2 2 2 2 1 1 2 TRAIL EXISTING RESTORATION AREA COR PREFFERED 30,600 SF AT 30% INFILL PLANTING AREA RESTORATION AREA COR EXPANDED STREAM BUFFER ENHANCEMENT EXHIBIT 17 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 GrahaCn c:\users\grahacn\pw_wsdot\d0136702\CedarRiverTrailReroute_With2018Survey.dgnPLOTTED BY: DATE:6/1/2018 TIME:2:50:41 PM Washington State Department of Transportation LINE 2: LINE 1: ??U U U C CCCCC CCPPPP SS SS CEDAR R IVER 9'19'TRAIL AND ROAD BUFFER BETWEEN EXISTING 2' STRIPED ROAD EXISTING SS MH CEDAR RIVER STREAM BUFFER WIDENING SB405 BRIDGE RAILROAD T R A IL STREAM BUFFERCEDAR RI VE RR O A D CONFLICTS WITH TRAIL PROPOSED BRIDGE PIER 2' 2' MIN 9' EX TRAIL EXISTING BRIDGE PIER VERTICAL CLEARANCE 8'-7" 1 0' 74R 6.3' EX TRAIL EX. PEDESTRIAN BRIDGE74R SHORELINE RENTON I-405, RENTON TO BELLEVUE EXPRESS TOLL LANES SCALE IN FEET 0 20 40 TRAIL REVISION - PURPLE OPTION PER 2018 SURVEYED PIER LOCATIONS; 74' MIN RADIUS EXHIBIT 18 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA18-000810 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Clark Close, 425-430-7289, cclose@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. 7. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit. Development Engineering: (Contact: Justin Johnson, 425-430-7291, JTJohnson@rentonwa.gov) 1. The installation of new piers in the Cedar River floodplain for the widening of the bridge over the Cedar River will require a zero-rise floodplain hydraulic analysis to demonstrate no increase in the 100-year floodplain. Compensatory storage would be required for any fill placed in the 100-year floodplain as required by the COR critical areas ordinance and the Renton Surface Water Design Manual. 2. According to WSDOT Environmental Manual M 31-11.17 Chapter 433 Groundwater, a full Discipline Report is required when one or more project alternatives may introduce enough stormwater or wastewater into an aquifer or its recharge zone to create a significant adverse environmental impact. EXHIBIT 19 DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA18-000810 The proposed improvements include the installation of stormwater facilities and of bridge support piles that are located within the one-year capture zone (Zone 1) of the City’s sole source aquifer. Therefore, the City requests WSDOT to submit the full Discipline Report for our review and comments. 3. See also attached Development Engineering Memo dated March 27, 2018. Fire Authority: (Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov) 1. Reviewed. Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. Reviewed. Community Services: (Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov) 1. See attached Community Services Department Memorandum with preferred planting location map dated March 8, 2018. 2. See attached Community Services Department Memorandum dated March 16, 2018. Police: (Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov) 1. Reviewed. Building: (Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov) 1. Recommendations of the geotechnical report must be followed. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE:March 27, 2018 TO:Clark Close, Senior Planner FROM:Justin Johnson, Civil Plan Reviewer SUBJECT:Utility and Transportation Comments for WSDOT LUA18-000810 I have completed a preliminary review of the application for the Tukwila to Renton Stage 3 project. WATER COMMENTS A portion of the project is within Zone 1 (1-year capture zone) and also in Zone 2 (5-year capture zone) of the City’s Sole Source Aquifer Protection Area. The project is subject to applicable City codes, development regulations and standards as described under RMC 4-3-050 Critical Areas Regulations that are related to Wellhead Protection Areas. 1. New bridge piers near Cedar River The installation of deep piling and piers adjacent to the Cedar River can adversely impact the water quality of the shallow drinking water aquifer. The applicant will need to install a shallow footing system that minimizes the impact and degradation of the ground water. 2. Groundwater monitoring plan The applicant shall develop and submit to the City a groundwater monitoring plan to monitor for the presence of contaminants resulting from construction activities near the City’s drinking water wells. 3. Water pollution, spill prevention and emergency response plan The applicant shall develop and submit to the City a water pollution control, spill prevention and emergency response plans and aquifer protection measures to be implemented during various stages of construction. Spill containment ponds shall be made of concrete and lined with a landfill liner material. A leak detection and monitoring system shall be provided. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 WSDOT Tukwila to Renton Stage 3 – LUA18-000810 Page 2 of 6 March 27, 2018 SEWER COMMENTS 1. Applicant will need to protect all Sewer utilities during construction. STORM DRAINAGE COMMENTS 1. Drainage plans and a drainage report complying with the adopted 2017 Renton Surface Water Design Manual will be required. 2. Outfalls into the Cedar River shall be designed and sized in accordance with standards found in Chapter 4 of the 2017 Renton Surface Water Design Manual and shall account for future runoff from the total upstream tributary area. Outfalls should be provided with adequate energy dissipation / erosion protection. 3. Within the floodway, encroachments including fill, new construction, substantial improvements, and other development are prohibited unless certification by a registered professional engineer demonstrates through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge, there are no adverse impacts to the subject property or abutting or adjacent properties, there are no higher flood elevations upstream, and the impact due to floodway encroachment shall be analyzed using future land use condition flows. 4. Future flow conditions should be considered for proposed bridge proposals crossing floodways. 5. WSDOT will need to provide a zero-rise hydraulic analysis of the existing and proposed site conditions within the floodplain of the Cedar River per section 4.4.2 of the 2017 City of Renton Surface Water Design Manual. The existing condition shall be based on the 2017 Preliminary FEMA DFIRM Floodplain/Floodway data. 6. If grading, filling, or other activity will reduce the effective storage volume of the floodplain, compensatory storage shall be created per section 4-3-050 of the Renton Municipal Code (RMC). 7. The project shall not result in any change to the floodplain or floodway. 8. The design and construction of the proposed storm drainage system within the City’s Wellhead Protection Areas shall meet the requirements of Sections 4-3-050, 4-4-030 and 4-9-015 of the Renton Municipal Code (RMC). Open facilities such as flow control and water quality treatment ponds, stormwater infiltration facilities, are prohibited in Zone 1 of the City’s Aquifer Protection Area (APA). DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 WSDOT Tukwila to Renton Stage 3 – LUA18-000810 Page 3 of 6 March 27, 2018 TRANSPORTATION/STREET COMMENTS 1. When installing the new column, the Applicant will need to ensure that access to the trail remains open at all times. GENERAL COMMENTS 1. The fees listed are for 2017. The fees that are current at the time of the respective permit issuance will be levied. Please see the City of Renton website for the current development fee schedule. 2. Retaining walls that are 4’ or taller from bottom of footing and stormwater detention vaults will require a separate building permit. Structural calculations and plans prepared by a licensed engineer will be required as part of the building permit review. 3. All civil plans shall conform to the current City of Renton survey and drafting standards. Current drafting standards can be found on the City of Renton website. 4. A separate plan submittal will be required for a construction permit for utility work and street improvements. All plans shall be prepared by a licensed Civil Engineer in the State of Washington. 5. Please see the City of Renton Development Engineering website for the Construction Permit Application and Construction Permit Process and Submittal Requirements. Please contact the City to schedule a construction permit intake meeting. 6. All plan review for the City is now paperless. Please see http://rentonwa.gov/paperless/ for more information. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 i:\2005\12\memos\ajs\standardmemo.doc COMMUNITY SERVICES DEPARTMENT M E M O R A N D U M DATE:March 8, 2018 TO:Clark Close, Senior Planner CC:Kelly Beymer, Administrator Leslie Betlach, Director of Parks Planning and Natural Resources Division FROM:Terry Flatley, Urban Forestry and Natural Resources Manager SUBJECT:Review of LUA17-000810 The site map submitted by WSDOT memorandum of February 28, 2018 regarding I-405, Tukwila to Renton Improvement Project, Shoreline Substantial Development Permit Application for LUA- 17-000810 should be deleted and the most recent version submitted (see the attached map). The old map provided in this review was used to designate a general area for consideration and does not show the City’s preferred location. This older map shows the general area in blue highlights and a more specific area in red highlights. The red highlighted area is not the preferred location but is further east of that red highlighted area. At this time, I have not seen a map from WSDOT of the specific planting area, however, they sent another generalized map of the area I forwarded to you on March 7, 2018. The attached map provides the specific planting location that is preferred by the City. That area is highlighted in a red boundary and is approximately 25,000 square feet in size. A purple highlighted area is also included in the case more area is needed for planting due to the request by the City for wider tree spacing than traditionally used when planting for a forest timber crop. Combined, the two areas are bounded on the west and east by soft surface trails. Both areas are delineated north of the 100-year flood survey. In relation to this information, the City requests WSDOT submit the following: Planting plan Maintenance plan Temporary irrigation plan An Inter-local Agreement for this mitigation planting project Attachment: COR Preferred Planting Location Map.pdf DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 4,514 376 COR Preferred Planting Location Map This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. None 3/8/2018 Legend 2560128 THIS MAP IS NOT TO BE USED FOR NAVIGATION Feet Notes 256 WGS_1984_Web_Mercator_Auxiliary_Sphere Information Technology - GIS RentonMapSupport@Rentonwa.gov City and County Boundary Addresses Parcels DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22 COMMUNITY SERVICES  DEPARTMENT    M   E   M   O   R   A   N   D   U   M       DATE: March 16, 2018    TO: Clark Close, Senior Planner, CED     CC: Kelly Beymer, Administrator  Leslie Betlach, Parks Planning and Natural Resources Director  Steve Brown, Parks Maintenance Manager     FROM: Cailín Hunsaker, Parks and Trails Director     SUBJECT: LUA17-000810, SM, CAR; Hunsaker Comments        I-405, Tukwila to Renton Improvement Project Page 1, Item 1: Response from Community Services Department, Parks and Trails Division: We are not sure that the sleeve-like attachments referenced are still in place as described. Those attachments (installed by others) showed signs of failure following their installation. For maintenance purposes we would suggest the installation of a completely different fixture that conforms to the lighting requirements referenced without the need of a non-factory produced attachment. Also the statement that “all lighting underneath the bridge is owned and operated by the City of Renton” is inaccurate. There are four (4) fixtures on the north end of the bridge that are not city owned or maintained. DocuSign Envelope ID: 31F77156-1DE0-4655-80C3-A1FC81D83C22