Loading...
HomeMy WebLinkAboutR-392716N C 0 W Cn W Z n TW i A 93 BAR EACH CORNEF 93 BAR EACH 81DE 93 BAR EACH ..... PRECAST BASE SECTION #3 BAR EACH CORNEF 18' MIN 93 BAR HOOP CLEAN SURFACE AND BOTTOM AREA. PROVIDE UNIFORM CONTACT. THE SURFACE AREA OF THE BASE SECTION MUST BE GROUTED TO THE BOTTOM AREA OF THE ADJUSTMENTSECTK)N. PIPE ALLOWANCES PIPE ALLOWANCES MAXIMUM PIPS MATERIAL INSIDE MINIMUM BASE REINFORCING STEEL DISTANCE In211L IN EACH DIRECTION BETWEEN KNOCKOUTS SEPARATE13ASE INTEGRALBASE DIAMETER REINFORCED OR IT PLAIN CONCRETE BE GROUTED TO FINAL GRATE UNTIL THE FINAL ALL METAL PIPE 15' CPSSP* 12• (STD. SPEC. 9-0520) SIDEWALK IN WHICH IT IS TO BE PLACED HAS BEEN' SOLID WALL PVC 15' (STD. SPEC.9-06.12(1)) 025 0.25 PROFILE WALL PVC 15• (STD. SPEC. 9-05.12(2)) 1r PIPE ALLOWANCES PIPE ALLOWANCES BASE SECTION PIPE MATERIAL NOTES MINIMUM BASE REINFORCING STEEL DISTANCE In211L IN EACH DIRECTION BETWEEN KNOCKOUTS SEPARATE13ASE INTEGRALBASE 1. THE COVER OR GRATING OF A CATCH BASIN SHALL NOT 18' PLAIN CONCRETE BE GROUTED TO FINAL GRATE UNTIL THE FINAL ALL METAL PIPE 21' ELEVATION OF THE PAVEMENT, GUTTER, DITCH, OR 18' (STD. SPEC. 9-05.20) SIDEWALK IN WHICH IT IS TO BE PLACED HAS BEEN' SOLID WALL PVC 2P ESTABLISHED, AND UNTIL PERMISSION THEREAFTER IS 025 0.25 PROFILE WALL PVC GIVEN BY THE ENGINEER TO GROUT OR GRATING IN (STD. SPEC. 9-05.12(2)) 1r PLACE IN ACCORDANCE WITH STANDARD SPECIFICATION 84• 8' 7-05.3. 12" 2. SHIMS SHALL NOT BE USED TO SET FRAME TO GRADE. 8' 12' - 84' THE USE OF SHIMS IS PROHIBITED. 0.39 029 3. MORTAR SHALL BE PLACED BETWEEN ADJUSTMENT 38" 48' RINGS AND BRICKS PRIOR TO PLACEMENT. 4. THE USE OF BRICKS IS PERMITTED WHERE THE BRICKS ARE STAGGERED TO CREATE A RUNNING BOND OR ig BOND. PUBLIC WORKS CATCH BASIN INSTALLATION STD. PLAN — 202.00 + DEPARTMENT MARCH 2008 PIPE ALLOWANCES PIPE ALLOWANCES MAXIMUM PIPE MATERIAL INSIDE MINIMUM BASE REINFORCING STEEL DISTANCE In211L IN EACH DIRECTION BETWEEN KNOCKOUTS SEPARATE13ASE INTEGRALBASE DIAMETER REINFORCEDOR 18' PLAIN CONCRETE 0.23 0.15 ALL METAL PIPE 21' CPSSP* 18' (STD. SPEC. 9-05.20) 6(p SOLID WALL PVC 2P (STD. SPEC. 9.05.12(1)) 025 0.25 PROFILE WALL PVC 2P (STD. SPEC. 9-05.12(2)) 1r J l� r1 Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) PIPE ALLOWANCES CATCH BASIN DIMENSIONS CATCH BASIN DIAMETER MAXIMUM WALL BASE KNOCKOUT THICKNESS THICKNESS SIZE MINIMUM BASE REINFORCING STEEL DISTANCE In211L IN EACH DIRECTION BETWEEN KNOCKOUTS SEPARATE13ASE INTEGRALBASE 48' 4" S' 38" S' 0.23 0.15 64' - 4.5' 8' 42' 8" 0.19 0.18 6(p 5" 8' 4V 8' 025 0.25 72" 6" 8' 60' 1r 0.35 0.24 84• 8' 17 72' 12" 0.38 - 0.29 98" 8' 12' - 84' 12' 0.39 029 J l� r1 Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) PIPE ALLOWANCES CATCH PIPE MATERIAL WITH MAXIMUM INSIDE DIAMETER BASIN DIAMETER ALL CONCRETE METAL CPSSP p SOLID WALL PVC p PROFILE WALL Pvcp 48' 24' 30' 24' 2r 30" 54' 30' 38' 30' 2r 38" 80' 38' 42' 36" 38' 42" 7T 42' 64' 42" 38' 48- W 54' 60' 64' 38" 48' 98' 80• 72' SW 38" 48' J l� r1 Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA)