Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CO 3
CAG-11-149, CO #3-18 . , . . „.....- Reconciliation Change Order No. 3 Contract Title: 2011 Citywide Walkway Improvements/Sidewalk Rehab & Replacement Project Contractor: Tri-State Construction, Inc. Contract No. : CAG-11-149 Federal Aid No. : N/A X Ordered by Engineer Proposed by the Contractor(VECP) Unilateral Original Contract Amount: $243,421.75 Current Contract Amount: $ 305,665.49 Estimated Net Change This Order: $ 36.007.09 New Contract Amount: $ 341,672.58 PreparedBy: Date: "' Restdtitttmeneer--- Co. .17-70k4... PAICI &"5 Reviewed By: / Date: Engineer of Record Reviewed Ew: /5C" Date: City of Renton Project Manager Reviewed By: t`g Date: City , • ey(G ea ha 35,000 and/or change in scope) Issued By: ' 44,404.400,1_ Date: 7A.G.fr, ‘ tiniiiir . Engineer(City of Renton Transportation Design Manager) _..,k` ‘‘ "Ii, %%•.1..% OF pe ,,,, . ... ... .45, 0w,, 4/r.).•/'''./ Consent By A. I". ,,,t of e..04 Date: ci ,o " GI's, Surety(Ate:, 25%cost increase, and/or 20%time increase' ,,,i- Endorsed By: ,------ - .. , Dat-: -7/24-1kii SEA L f-: * 2 Co All P .:.. ,.-.. 0 .,„ . a; -, Zig: ;:. ,p.c, /1,, Executed Bk,: AWL% • sr L..., ATTEST: AG t a , 0•. ,-: Mayor Denis aw J /son- ; 7 h, Cit ",, i c'ittASO`‘- Change Order No, 3 Contract Title: 2011 Citywide Walkway lmprovements/Sidewalk Rehab St Replacement Project Contract No,CAG-11-149 Page 1 of 4 1 THE CONTRACT IS MODIFIED AS FOLLOWS: Reason for Change: To reconcile the original contract amount with the final totals to account for changes in quantities Description of Change: The change amounts in the original contract and the change orders are summed as shown on the attached spreadsheet, and the amount of the contract is adjusted accordingly by this Change Order No. 3. Materials: There are no new materials involved in this change order. Plans: There are no plan changes. Extension of Time: The Time for Completion is extended 0 Working Days. Equitable Adjustment: This Change Order does not include a significant change. Sections 1-04.4 and 1-04.5 of the 2010 WSDOT/APWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Change Order No.3 Contract Title: 2011 Citywide Walkway Improvements/Sidewalk Rehab&Replacement Project Contract No.CAG-11-149 Page 2 of 4 Measurement and Payment: Change Order No.3,Contract Reconciliation Original Contract Final Totals Change Order No.3 Bid Item No. (Contract Bid Item Quantity I Unit I Unit Price Bid Amount Quantity Final Amount Change Schedule A-Maplewood 1 Minor Change 1.00 ES $ 5,000.00 $5,000.00 3.5343 $17,671.50 $12,671.50 2 Spill Prevention Plan,Control and Countermeasures 1.00 LS $ 240.00 $240.00 1 $240.00 $0.00 3 Mobilization 1.00 L5 $14,000.00 $14,000.00 1 $14,000.00 $0.00 4 Project Temporary Traffic Control 1.00 LS $ 5,977.00 $5,977.00 1 $5,977.00 $0.00 5 Sawcut Concrete 100.00 LF $ 3.20 $320.00 17 $54.40 -$265.60 6 Saw Cut Existing Asphalt Concrete Pavement 1,663.0 LF $ 1.65 $2,743.95 1,764 $2,910.60 $166.65 7 Remove Cement Concrete Sidewalk 733.00 SY $ 7.75 $5,680.75 759.77 $5,888.22 $207.47 8 Remove Cement Concrete Curb and Gutter 1,623.0 LF $ 5.15 $8,358.45 1699 $8,749.85 $391.40 9 Remove Cement Concrete Driveway 209.00 SY $ 8.55 $1,786.95 207.68 $1,775.66 -$11.29 10 Asphalt Concrete Pavement Removal 370.00 SY $ 7.40 $2,738.00 486.88 $3,602.91 $864.91 11 Roadway Excavation Incl.Haul 100.00 CY $ 24.00 $2,400.00 572.9 $13,749.60 $11,349.60 12 Finish And Cleanup 1.00 LS $ 1,596.00 $1,596.00 1.00 $1,596.00 $0.00 15 Catch Basin Type 1 4.00 EA $ 1,102.00 $4,408.00 2 $2,204.00 -$2,204.00 17 Open Curb Face Frame and Grate 4.00 EA $ 660.00 $2,640.00 6 $3,960.00 $1,320.00 18 Storm Drain Pipe,12 In.Dia 435.00 LF $ 30.65 $13,332.75 73.00 $2,237.45 -$11,095.30 19 Connection To Existing Catch Basin 1.00 EA $ 173.00 $173.00 2 $346.00 $173.00 22 Cement Concrete Driveway-6" 400.00 SY $ 41.75 $16,700.00 487.09 $20,336.01 $3,636.01 23 CementConc.Sidewalk 929.00 SY $ 26.95 $25,036.55 819.6 $22,088.22 -$2,948.33 24 Cement Conc.Traffic Curb and Gutter 1,623.0 LF $ 12.00 $19,476.00 1648.5 $19,782.00 $306.00 25 Seeded lawn Installation 763.00 SY $ 3.00 $2,289.00 1079 $3,237.00 $948.00 26 Crushed Surfacing Base Course 300.00 TON $ 35.50 $10,650.00 859.99 $30,529.65 $19,879.65 27 Erosion/Water Pollution Control 1.00 EST $ 2,835.00 $2,835.00 1 $2,835.00 $0.00 28 Topsoil Type A 252.00 CV $ 50.75 $12,789.00 221 $11,215.75 -$1,573.25 29 Remove Unsuitable Material-Sod 252.00 CY $ 40.40 $10,180.80 226 $9,110.20 -$1,070.60 30 Remove and Reset Existing Mailbox 2.00 EA $ 415.00 $830.00 1 $415.00 -$415.00 33 Cement Sidewalk Ramp Type 3 3.00 EA $ 893.00 $2,679.00 3 $2,679.00 $0.00 Schedule C-S.4th Place 1 Minor Change 1.00 ES 5,000.00 $5,000.00 1.3807 $6,903.50 $1,903.50 2 Spill Prevention Plan,Control and Countermeasures 1.00 L5 240.00 $240.00 1 $240.00 $0.00 3 Mobilization 1.00 L5 3,685.00, $3,685.00 1 $3,685.00 $0.00 4 Project Temporary Traffic Control 1.00 LS 6,205.00 $6,205.00 1 $6,205.00 $0.00 5 Sawcut Concrete 50.00 LF 3.20 $160.00 4 $12.80 -$147.20 6 Saw Cut Existing Asphalt Concrete Pavement 833.00 LF 1.65 $1,374.45 769 $1,268.85 -$105.60 7 Remove Cement Concrete Sidewalk 182.00 SY 8.75 $1,592.50 196.67 $1,720.86 $128.36 8 Remove Cement Concrete Curb and Gutter 390.00 LF 8.75 $3,412.50 352 $3,080.00 -$332.50 9 Remove Cement Concrete Driveway 126.00 SY 8.75 $1,102.50 81.66 $714.53 -$387.98 10 Asphalt Concrete Pavement Removal 266.00 SY 6.45 $1,715.70 299 $1,929.71 $214.01 11 Roadway Excavation Incl.Haul 100.00 CY 24.00 $2,400.00 54.27 $1,302.48 -$1,097.52 12 Finish And Cleanup 1.00 LS 1,596.00 $1,596.00 0.9 $1,436.40 -$159.60 14 HMA Cl. 1/2 In.PG64-22 60.00, TON 162.00 $9,720.00 101.58 $16,455.96 $6,735.96 21 Adjust Existing Valve Box To Grade 15.00 EA 63.00 $945.00 15 $945.00 $0.00 22 Cement Concrete Driveway-6" 148.00 SY 41.75 $6,179.00 101.8 $4,250.15 -$1,928.85 23 Cement Conc.Sidewalk 182.00 5Y ' 26.95 $4,904.90 175.84 $4,738.89 -$166.01 24 Cement Conc.Traffic Curb and Gutter 240.00 IF 12.00 $2,880.00 353 $4,236.00 $1,356.00 26 Crushed Surfacing Base Course 300.00 TON 35.50 $10,650.00 45.95 $1,631.23 -$9,018.78 27 Erosion/Water Pollution Control 1.00 EST 1,519.00 $1,519.00 1 $1,519.00 $0.00 31 Relocate Existing Sign 4.00 EA 120.00 $480.00 3 $360.00 -$120.00 32 Install Tree Well Frame&Grate 4.00 EA 700.00 $2,800.00 6 $4,200.00 $1,400.00 Sub-Totals $243,421.75 $274,026.37 $30,604.62 Change Order 1 $0.00 $44,472.51 $49,874.98 $5,402.47 Change Order 2 $0.00 $17,771.23 $17,771.23 $0.00 (Totals $305,665.49 $341,672.58 $36,007.09 Change Order No. 3 Contract Title: 2011 Citywide Walkway Improvements/Sidewalk Rehab &Replacement Project Contract No. CAG-11-149 Page 3 of 4 Attachments: 1. Plans 2. _ Construction Change Directive (DOT Form 570-110 EF) 3. _ Change Order Quotation (DOT Form 570-002) 4. _ Materials—Project Documentation (DOT Form 550-004 EF) 5. _ Project Labor List 6. _ Applicant-Owned Equipment and Labor Project Documentation (DOT Form 550-003 EF) 7. _ Force Account Equipment Rate Request (DOT Form 422-010 EF) 8. _ Equitable Adjustment Determination Change Order No. 3 Contract Title: 2011 Citywide Walkway Improvements/Sidewalk Rehab&Replacement Project Contract No.CAG-11-149 Page 4 of 4