Loading...
HomeMy WebLinkAboutAdden 3 CAG-15-209 , Adden #3-18 Washington State r; Department of Transportation Supplemental Agreement Organization and Address Number 3 DGK.Inc.(dba Widener&Associates) Original Agreement Number 1902 120th Place SE,Suite 202 Everett,WA 98208 CAG-15-209 Phone: 425-418-7162 Project Number Execution Date Completion Date TED4003844 10/28/2015 12/31/2018 Project Title New Maximum Amount Payable N 27th Place Bridge Scour Repair $36,294.80 Description of Work Construction support to assist in ensuring compliance with environmental requirements for the project. The Local Agency of City of Renton desires to supplement the agreement entered in to with DGK,Inc.(dba Widener&Associates) and executed on 10/28/2015 and identified as Agreement No. CAG-15-209 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: The Scope of Work of the Original Agreement,Supplemental Agreement No. 1 and Supplement Agreement No. 2 is supplemented to include the attached Exhibit A-3. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: The completion date remains 12/31/2018. III Section V, PAYMENT, shall be amended as follows: See attached Exhibit"A"and Exhibit D-3.The maximum amount payable is increased by$16,109.60 from$20,185.20 to $36,294.80. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By:DGK In (dba W. e r&Associates) By:Gregg Zimmerman,Public Works Administrator Consultant Signature / ppIs6rfty Sig ature d / 2-t1 /0 Dat DOT Form 140-063 Revised 09/2005 Exhibit "A" Summary of Payments Basic Supplement Supplement Supplement Total Agreement No. 1 No. 2 No.3 Direct Salary Cost $8,098.00 $0.00 $0.00 $6,504.00 $14,602.00 Overhead (Including Payroll Additives) $8,907.80 $0.00 $0.00 $7,154.40 $16,062.20 Direct Non-Salary Costs $750.00 $0.00 $0.00 $500.00 $1,250.00 Fixed Fee $2,429.40 $0.00 $0.00 $1,951.20 $4,380.60 Total $20,185.20 $0.00 $0.00 $16,109.60 $36,294.80 Exhibit A-3 Modifies Exhibit A of the Original Agreement Scope of Work Supplemental Agreement No. 3 Agency: City of Renton Consultant: DGK,Inc. Contract: CAG-15-209 Project: N 27th Place Bridge Scour Repair PROJECT UNDERSTANDING Currently the City of Renton has undertaken the construction of the N. 27th Place Bridge Scour Repair project. The project will repair the scour damage that has occurred to the open bottom concrete arch culvert. High stream flows have undermined the foundation and thus created the potential for permanent damage to the structure. The scope of this work provides for the construction support to assist in ensuring compliance with the environmental requirements for the project. Task 2—Construction Support: • Complete onsite inspections. • Attend weekly construction meetings. • Making recommendations for environmental compliance. • Assist with the planting plan. Deliverables • Notes and email recommendations. Exhibit D-3 Project: N 27th Place Bridge Scour Repair(CAG-15-209) Client: City of Renton Public Works/Derek Akesson Location: Renton, WA Project Project Task Description Manager Biologist Hours Hours 2 Construction Support 24 96 Total hours 24 96 Summary Hours Rate Cost Project Manager 24 $71.00 $1,704.00 Project Biologist 96 $50.00 $4,800.00 Total Labor $6,504.00 Overhead 110% $7,154.40 Profit 30% $1,951.20 Expenses Mileage $500.00 Total Estimated Cost= $16,109.60