Loading...
HomeMy WebLinkAboutC_ERC_Determination_Agency_Letter_180824.pdf Enclosure cc: King County Wastewater Treatment Division Ramin Pazooki, WSDOT, NW Region Boyd Powers, Department of Natural Resources Larry Fisher, WDFW Karen Walter, Fisheries, Muckleshoot Indian Tribe Duwamish Tribal Office Melissa Calvert, Muckleshoot Cultural Resources Program US Army Corp. of Engineers Gretchen Kaehler, Office of Archaeology & Historic Preservation Washington State Department of Ecology August 24, 2018 Washington State Department of Ecology Environmental Review Section PO Box 47703 Olympia, WA 98504-7703 Subject: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION Transmitted herewith is a copy of the Environmental Determination for the following project reviewed by the Environmental Review Committee (ERC) on August 20, 2018: SEPA DETERMINATION: Determination of Non-Significance (DNS) PROJECT NAME: JC Mart Demolition of Canopy and Removal of Tanks PROJECT NUMBER: LUA18-000512, ECF Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on September 7, 2018, together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and information regarding the appeal process may be obtained from the City Clerk’s Office, (425) 430-6510. Please refer to the enclosed Notice of Environmental Determination for complete details. If you have questions, please call me at (425) 430-7312. For the Environmental Review Committee, Angelea Weihs Associate Planner DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SIGNATURES: Gregg Zimmerman, Administrator Public Works Department Date Rick M. Marshall, Administrator Renton Regional Fire Authority Date Kelly Beymer, Administrator Community Services Department Date C.E. Vincent, Administrator Date Department Of Community & Economic Development ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) PROJECT NUMBER: LUA18-000512 APPLICANT: Joey Hickey, Geosyntec Consultants / jhickey@geosyntec.com / 621 SW Morrison St, Ste. 600, Portland, OR 97205 PROJECT NAME: 2801 NE Sunset UST Removal PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the proposed removal of three underground storage tanks (USTs) located at 2801 NE Sunset Blvd (Parcel number 7227900090). The subject property is located within the Center Village (CV) Zone and Urban Design District D. The property is 20,219 square feet (0.46 acres) and contains an existing 20,219 square foot convenience store and a fueling canopy and fuel dispensers. The current fuel system consists of three steel USTs (two 12,000 gallon and one 10,000 gallon) and two dispensers. The applicant proposes to remove the USTs from their original UST cavity and the excavation will be backfilled to match the existing grade. The fueling canopy and all ancillary UST piping will also be removed. No new structures are proposed and no tree removal is proposed as part of this project. The project will take between one and two weeks to complete. PROJECT LOCATION: 2801 NE Sunset Blvd LEAD AGENCY: City of Renton Environmental Review Committee Department of Community & Economic Development The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. Because other agencies of jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on September 7, 2018. Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and more information may be obtained from the Renton City Clerk’s Office, (425) 430-6510. PUBLICATION DATE: August 24, 2018 DATE OF DECISION: August 20, 2018 DocuSign Envelope ID: 114DD4F3-8BBF-4B16-AD4F-AE7B2AF403F1 8/20/2018 | 4:43 PM PDT 8/20/2018 | 2:10 PM PDT 8/20/2018 | 3:44 PM PDT 8/20/2018 | 2:34 PM PDT DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 LUA18-000512 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Angelea Weihs, 425-430-7312, aweihs@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 4. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. Development Engineering: (Contact: Scott Warlick, 425-430-7216, swarlick@rentonwa.gov) 1. No Comments Fire Authority: (Contact: Cory Cappelletti, 425-430-7057, ccappelletti@RentonRFA.org 1. No Comments Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. No Comments Community Services: (Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov) 1. No Comments. Police: (Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov) 1. No Comments Building: (Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov) 1. No Comments EXHIBIT 7 DocuSign Envelope ID: 114DD4F3-8BBF-4B16-AD4F-AE7B2AF403F1 DETERMINATION OF NON-SIGNIFICANCE (DNS) ADVISORY NOTES PROJECT NUMBER: LUA18-000512, ECF APPLICANT: Joey Hickey, Geosyntec Consultants; 621 SW Morrison Street, Suite 600, Portland, OR 97205 PROJECT NAME: JC Mart Demolition of Canopy and Removal of Tanks PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the proposed removal of three underground storage tanks (USTs) located at 2801 NE Sunset Blvd (Parcel number 7227900090). The subject property is located within the Center Village (CV) Zone and Ur ban Design District D. The property is 20,219 square feet (0.46 acres) and contains an existing 4,250 square foot convenience store and a fueling canopy and fuel dispensers. The current fuel system consists of three steel USTs (two 12,000 gallon and one 10,000 gallon) and two dispensers. The applicant proposes to remove the USTs from their original UST cavity and the excavation will be backfilled to match the existing grade. The fueling canopy and all ancillary UST piping will also be removed. No new struct ures are proposed and no tree removal is proposed as part of this project. The project will take between one and two weeks to complete. PROJECT LOCATION: 2801 NE Sunset Blvd (Parcel No. 7227900090) LEAD AGENCY: The City of Renton Department of Community & Economic Development Planning Division MITIGATION MEASURES: This project has no proposed mitigation measures at this time. ADIVISORY NOTES: The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use actions. DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE (DNS) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNS: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: August 24, 2018 PROJECT NAME/NUMBER: LUA18-000512 PROJECT LOCATION: 2801 NE Sunset Blvd, Renton, WA 98056 LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://bit.ly/2AlsKP2 PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the proposed removal of three underground storage tanks (USTs) located at 2801 NE Sunset Blvd (Parcel number 7227900090). The subject property is located within the Center Village (CV) Zone and Urban Design District D. The property is 20,219 square feet (0.46 acres) and contains an existing 4,250 square foot convenience store and a fueling canopy and fuel dispensers. The current fuel system consists of three steel USTs (two 12,000 gallon and one 10,000 gallon) and two dispensers. The applicant proposes to remove the USTs from their original UST cavity and the excavation will be backfilled to match the existing grade. The fueling canopy and all ancillary UST piping will also be removed. No new structures are proposed and no tree removal is proposed as part of this project. The project will take between one and two weeks to complete. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on September 7, 2018, together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by City of RMC 4-8-110 and information regarding the appeal process may be obtained from the Renton City Clerk’s Office, (425) 430-6510. PUBLIC HEARING: If the Environmental Determination is appealed, a public hearing will be set and all parties notified. NOTICE