Loading...
HomeMy WebLinkAboutAdden 2 CAG-18-027,Adden#2-18 G��Y Cif ii , AMENDMENT NO. 2 TO AGREEMENT FOR FAMILY FIRST CENTER CAG-18-027 THIS AMENDMENT, dated 9/VZ0I ., is by and between the City of Renton (the "City"), a Washington municipal corporation, and Baylis Architects, INC ("Consultant"), a Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. • Whereas, the City engaged the services of the Consultant under Agreement CAG-18-027, dated February 14, 2018, to provide Architectural Design Services necessary for the Family First Community Center (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to increase the compensation amount, in order to initiate the early phases of design until such time that a full-service agreement has been executed. NOW THEREFORE, It is mutually agreed upon that CAG-18-027 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add as specified in Exhibit "A- 2", which is attached and incorporated herein. 2. Compensation: Section 4, Total compensation, is amended noting the fees here will be included in the full-service agreement and will not be considered additional services as specified in Exhibit "A-2". The maximum amount of compensation payable to Consultant is increased from $136,000 by $91,786.00 to an amount not to exceed $ 227,786.00 plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actual performed according to the rate(s) or amounts specified in Exhibit "A-2", which is attached and incorporated herein. 3. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF TON CONSULTANT By: By: Denis Law, Mayor Meredith Everist, Principal City of Renton Baylis Architects, INC 67/y/g7 8/30/2018 Date Date Approved as to Legal Form Attest Shane Moloney r Renton City Attorney • / /.5' CLB 8/02/18 177 Ja n A. Se C' y Clerk "r.�unrrrrrr,i O F 1�F�,,, asta 40.0 iiiiu11111 a0\‘‘ ,�o,�\�.�_ FDrSEP.C.C3 PAGE 2 OF 2 Ent rl A -a ARCHITECTS ,,:;,n; Brian Brand,AIA Kevin J.Cleary,AIA 110 Meredith Everist,AIA Richard Wagner, FAIA August 29, 2018 Kelly Beymer City of Renton, Community Services Department 1055 S Grady Way Renton, WA 98057 Re: Family First Community Center - Proposed Fee Extension 002 Continuation of Schematic Design Dear Ms. Beymer, Please find summarized below a request to adjust the contract amount for the Schematic Design fees for Family First Community Center. Note that this adjustment is requested only as our authorization to continue to prosecute the early phases of design until such time that a full-service agreement has been executed. The fees noted here will be included in the full-service agreement and will not be considered additional services. The fee adjustment is proposed to allow continuation of Schematic Design for select design team members. Efforts by these team members will help keep the project schedule from additional delay and will support approximately one month of design work. Schematic Design 591.786.00 • Structural $14,025.00 • MEPF $13,200.00 • Architectural $46,000.00 • Sustainability $ 4,301.00 • Civil Engineer(including Utility Services) $ 9,560.00 • Landscape Architect $ 4,700.00 We appreciate your consideration of this fee adjustment. Please let us know if we can provide any additional information. Sincerely, BAYLIS ARCHITECTS, INC. Meredith Everist, AIA, LEED AP BD+C President Authorization: Signature Dated 10801 Main Street, Suite 110 I Bellevue,WA 98004 I www.BaylisArchitects.com I (42 )454 0566