Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_HouserWay_Banner_180907_v1.pdfConstruction Mitigation Description – Southport / Houser Way Fence Banner Proposed construction dates for the project are between September 14, 2018 till the end of September. Construction duration will be one day. Work hour window to be 9am to 5pm. There will be no adverse effects from noise, dust, or traffic. Access to the site will be adjacent to the right of way at the corner of Houser Way N and Lake Washington Boulevard N.