Loading...
HomeMy WebLinkAboutS-0371212N T rl_ t'MM J O N C) Z 0 50 100 Scale in Feet FOR MANHOLE AND PAVEMENT RESTORATION, SEE DETAIL 11- - aw BNSF PREMISES: WORK SHALL COMPLY WITH THE PROJECT'S BNSF TEMPORARY OCCUPANCY PERMIT AND THE REQUIREMENTS NOTED ON THESE PLANS AND IN THE SPECIFICATIONS, SEE NOTE 4. MH' 2019''.� i SMH 1968 NOTES: 1. CONTRACTOR SHALL PREPARE AND SUBMIT FOR REVIEW AND APPROVAL A TRAFFIC CONTROL PLAN SEE DWG C-1 FOR FOR WORK IN N 4TH ST. THE TRAFFIC CONTROL PLAN REPLACEMENT SHALL BE APPROVED BE THE ENGINEER PRIOR TO REQUIREMENTS BEGINNING ANY WORK IN N 4TH ST AND BE IN OACCORDANCE 1 WITH THE CITY APPROVED ROW PERMIT TO BE OBTAINED BY THE CONTRACTOR. 2. SEE SPECIAL PROVISIONS SECTION 7-27 FOR TEMPORARY SEWER BYPASS PUMPING/SYSTEMS REQUIREMENTS. 3. EROSION CONTROL MEASURES SHALL BE PROVIDED/IMPLIMENTED AS REQD AND APPROPRIATE IN ACCORDANCE WITH THE EROSION CONTROL NOTES ON DWG G-2 AND APPLICABLE CITY OF RENTON STD PLANS. • 4. SEE GENERAL BNSF NOTES AND REQUIREMENTS ON DWG G-2. 5. SEE SPECIAL PROVISIONS SECTION 1-08.13 FOR SPECIFIC WORK CONSTRAINTS. SCHEDULE - CURED IN PLACE PIPE FOR SANITARY SEWER STREET UPSTREAM MANHOLE APPROX DEPTH TO PIPE INVERT DOWNSTREAM MANHOLE APPROX DEPTH TO PIPE INVERT EXISTING PIPE MATERIAL PIPE SIZE APPROX RUN LENGTH APPROX # LATERALS TO REINSTATE N 4TH ST 1968 11.3 FT 1967 4.8 FT VITRIFIED CLAY 2411 456 FT 3 N 4TH ST 1967 4.8 FT 2019 5.6 FT VITRIFIED CLAY 2411 203 FT 0 TOTAL 2411 659 FT 3 BHC Consultants, LLC 1601 Fifth Avenue, Suite 500 . Seattle, Washington 98101 206.505.3400 C O N S U LTA N T S 206.505.3406 (fax) SEATTLE TACOMA www.bhcconsultants.com CIPP PLAN AND SCHEDULE PLAN SCALE: 1" = 50'-0" SURVEYED: KPG DESIGNED: T. WHITEHOUSE, P.E. DRAWN: P. SIMON ISSUED FOR BID TJW 05/2015 JSK CHECKED: J. KRESHEL, P.E. N0. REVISION BY DATE APPR APPROVED: R. DORN, P.E. SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M REPLACE TYPE C TRAFFIC CURB TO MATCH EX PER RENTON STD PLAN H007 CONSTRUCTION NOTES: 10 NEW SMH 1968 SHALL BE INSTALLED PRIOR TO BEGINNING CIPP WORK. SEE GENERAL CONSTRUCTION SEQUENCE NOTES ON DWG G-2. OQUANTITY, LOCATION AND DEPTH OF EXISTING SIDE SEWERS ARE UNKNOWN. SIDE SEWERS SHOWN FOR ILLUSTRATION PURPOSES ONLY. CONTRACTOR SHALL FIELD LOCATE EXISTING SIDE SEWERS AND RESTORE SERVICE CONNECTION AFTER INSTALLATION OF CIPP AS SPECIFIED. REMOVE 72" DIA MANHOLE TOP FOR INSTALLATION OF CIPP, REINSTALL AND ROTATE APPROX 1350 CCW AS APPROVED BY THE CITY IN THE FIELD PROTECT EX UTILITY COVER, REINSTALL TO MATCH EX AS REQD REPLACE YELLOW PAVEMENT MARKING TO MATCH EX REPLACE CHANNELIZATION MARKERS PER RENTON STD PLANS H007 AND 109.1 CITY OF RENTON Public Works Dept. REMOVE AND REPLACE 4 CONC PANELS PER RENTON STD PLAN 111, APPROX SIZE=10'x10'x12" THICK EACH PANEL MANHOLE AND PAVEMENT RESTORATION (LOOKING WEST) DETAIL 1 NTS - S-0371212 Call 48 Hours Before You Dig 1-800-424-5555 UNDERGROUND SERVICE DATE: CENTRAL RENTON SEWER INTERCEPTOR MAY 2015 RELINE & UPSIZE PROJECT FIELDBOOK: PAGE: DRAWING NO: SEWER RELINE PLAN & DETAILS C — 3 SHEET: OF: 6 6