HomeMy WebLinkAboutR-381804MONITOR OF SOILS. OF EX POWER N AVING EX VAULT TREE W/PROTECTION
.,CKFILL WITH CLEAN
COMM SERVICES
REMOVE I l
CONTOUR (INDEX)
MA IVA ♦REMCVE EX
SITE STORM SYSTEM IF♦♦♦CONTOUR
SALVAGE EX All 914-
CONCRETE
R �'M.j 11 — 1% WATER LINE
SIGN To OWNER REMOVE END OF TRENCH-N--'.4
DRAIN, COORD W1 NEW
IAN Fall
pe" , ON 01115"1 STORM DRAINAGE LINE SD,'
PAVING. RE -CONNECT TO W,
f CONCRETEEMOVE • 1 • 1 ►iti1►1 - - - - - - _--♦♦ii► #!E'i.�►!! �!+1►'.*�1►'�►wi►!�1►�! : r.'I'I �,�' ii y �- ; '� ♦ ♦'�` i♦ !i► ► ,. �, - • ♦�;♦ # ♦�t
►► ♦ ► ♦♦♦SANITARY SEWER LINE SS
` s♦.� �r
♦ ♦wit,► a '',1►1#*► ♦♦
POWER E
r TELEPHONE LINE
EX ASPHALT PAVING PROPOSED BUILDING
1110" MANOR
OUTLINE SHOWN GAS LI N E GAS,'
FOR REFERENCE
WATER METER/VALVE/FH
STORM CB/MH
COORDINATE DEMO 1 , A.r►_r �.�.��►�_►A'i� I 1 11 , al ;� ♦ '�SANITARY SEWERWALKS AND CURB WITH
LL_ SEQUENCING GAS VALVE/METER
WQ VAULTS (TYP) STREET LIGHT ASSEMBLY
r
1 aw
�►
VE
IVA
COORDINATE W/
IN PIP TION
ASPHALT FOR GAS
ENTRY IONIAiAT BUILDINGS TO REMAIN
EX SITE WATER (FIRE & DOMESTIC) SERVICES ALSO
PROVIDE WATER TO BUILDING L. COORDINATE SHUT
DOWNS OF WATER SERVICES WITH ALL CAMPUS USERS.
CHANGES TO WATER SYSTEM TO BE COORDINATED
WITH CLASS SCHEDULES AND OCCUR DURING
SUMMER BREAKS. SYSTEMS SHALL BE FUNCTIONAL
WHEN CLASSES ARE IN SESSION. "
to I RULILU UMU l — — _
\ 1 REMOVE / ABANDON EX REMOVE EX SAWCUT AND REMOVE err — SAWCUT AND REMOVE SEE DEMOLITION NOTES ON CO.01
I I\
OMOVDAL/ABANDON SANITARY SEWER. SEE j
RE2 C4.00 FOR REPLACEMENT I CONCRETE EX CURB AND WALK ,` EX ASPHALT PAVING AND SEQUENCING NOTES ON G I.01
I I Imo' �3 I COORDINATE WITH USE REMOVE NORTH _
SAWCUT AND REMOVE
OF EX GAS W/ PSE o'
t I OF K2 BUILDING END OF EX �a i CURB AND WALK
REMOVE EX OIL TANK REMOVE ExA" COORDINATE POWER AND COMMUNICATIONS DEMO
f TRENCH DRAIN f j I
WITH ELECTRICAL AND COMM DESIGN
REMOVE EX BIKE RACK '
SEE HAZARDOUS MATERIALS COORDINATE W FDCS &PINS f , (,� REMOVE EX WATER VAULT
REMOVE EX ASPHALT ; I REMOVE EX SKY BRIDGE / COORDINATE SALVAGE OR
rnnan W� Aoru'I e SPECS FOR DISPOSAL AND ,,,,,,r� ,., , ,, NEW PAVING _.__ _ _ / f , r rl AND RACK FI nW VAI VF
-_ REMOVAL WITH OTHEN 51iE PLANS r''. LANDING BEHIND CURB RAMP PROTECT EX REE ;�'� �f .� �5� UPERMIT# UI5000494
j ,,
3
! 4. r.+.•,�" `, t
�!' L 11���■. l Ir■ ■■■� ■lam mMlw� awwar 1? irl■I� �w �{� r■� � ? r �■ ■.■r `- — 1.11Y1Fi (,j
Approved
,MIT.►, LT �,.�., ,. ,... rr ..,• By
SALVAGE EX SIGN I «; 1 �. PROTECT Date:
FOR RE -INSTALLATION i LIMITS OF WORK �6 EX SIGNS r
' yam. roved
�-
y PPBy:
A Date:
t
r'
_ Approved Date
i.
, e
CONSTRUCTION RECORD DRAWING O A, Jq�
- _ -- Approved BY: Date:
This construction record drawingIs a co �� WASH SURVEYED: SCALE:
copy of a cad file prepared by �� r� vERr�rx wvo lase
DESIGNED: AS NOTED HDRIZONUL: ""° ,a�,i,se, :; ,.� CITY OF AUTOMOTIVE TRAINING CENTER
COUGHLIN PORTER LUNDEEN and has been edited to reflect field �Q �' rf.
COUGHLINPORTERLUNDEEN
verified invert and rim elevations of the storm, sanitary sewer and water w I<Aw RENTON TECHNICAL COLLEGE
main systems. Field verified invert and rim elevations were obtained by "'� DRAWN: � RENTON
CE&C CONSTRUCTION IN MARCH OF 2017 ACONSULTINGSTRUCTURALANDCIVILENGINEERING CORPORATION Li RENTON WASHINGTON
ONE INCH DATU M
The on -site private storm drainage facilities and public roadway ,F 43667 ,� c�,� '� 801 SECOND AVENUE -SUITE 900 P: 206/343-0460 CHECKED:
F'C tt}I SEATTLE, WA 98104 F: 206/343-5691 d,qd AT FULL Sc�E Planning/Building/Public Works Deat.
improvements were installed in accordance with the approved plans and �,ss rs t �- aC+� I (j`� IF NOT ONE INCH
the documented field revisions and function as intended. f�VAL E' NO. REVISION BY DATE APPR
APPROVED: s ACCORDINGLY DEMOLITION PLAN
04/30/2015
FIELDOOOK.
PAGE:
DRAWING NO:
C 1.00
SHEET:
OF:
4
13