Loading...
HomeMy WebLinkAboutR-397003UTILITY CONFLICT NOTE '� �. I- - - o 6"THK PERMEABLE CON C. O l� THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND , EXG BUILDING I \ \ \ STORAGE RESERVOIR (CLEAN ROCK, MIN 40%° VOIDS) DOWNSPOUT TIGHTLINE CONNECTION 0') DEPTH OF ALL EXISTING UTILITIES, WHETHER SHOWN ON THESE PLANS OR NOT, BY o CU DEPTH AS NECESSARY TO REPLACE EXG C'C POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR I I d' I \ COMPACTED SOILS 18" MIN, (TO BE EVALUATED BY WEARING COURSE SLOPE PER PLAN O TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800-424-5555 AND I r'- GEOTECHNICAL ENGINEER) d- THEN POTHOLING ALL EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO L1__I \ DOWNSLOPE END OF PERMEABLE PAVEMENT s PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS I - CONIC BAND BETWEEN PAVEMENTS PER COR + SUBSURFACE WATER STORAGE AREA ADJACENT HARDSCAPE 0 SHOWN ON THESE PLANS ARE NOT GUARANTEED AND ARE SUBJECT TO VARIATION. IF I c `. STD PLAN 261.00 \ 1" LJJ CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT AP CONSULTING ENGINEERS ( r-- I - L PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. PLLC TO RESOLVE AL 0 � 1 q \ 434.4 MATCH EXG GRADE O z \ YARD DRAIN #4 STA 10+75.62,114.01 L \ Q \ PVC UNDER PAVEMENT RIM = 435.00 \ 1 TO BE SOLID WALL, PERFORATED, & WRAPPED IE(SE) = 432.25 MATCH E(N) (I I III I I - SUBGRADE SLOPE TO 3 a" IN GEOTEXTILE FABRIC (TYP) IE(N) = FIELD VERIFY MATCH SURFACE SLOPE ' I I I' I-' LC) \ 10 LF 12" 0 PVC PVC pe @ 4.49% \ IMPERMEABLE CHECK DAM ' 6" 0 SOLID PVC rr M � CONS BAND AT US PER (CONC OR EQUIVALENT) 6" SAND FOR TREATMENT DAM SLOTTED UNDERDRAIN O _ 00 � -\ \ COR STD PLAN 261.00 USE SPLASHBLOCKS TO o \ 6" MIN COMPACTED DEPTH SAND (30% POROSITY) PER NON -WOVEN GEOTEXTILE ON BOTTOM & (GONG) (f) I TRACT \ DIRECT FLOWS FROM DS TO o N \ ( PERMEABLE PAVEMENT SIDES OF FREE -DRAINING BASE. SPECIFIC THE SPECIFICATIONS THAT GEOTEXTILE PER GEOTECHNICAL ENGINEERS O 2117.16 SQ FT--- O \ ��� 1 XG B ARE PART OF THIS DETAIL. RECOMMENDATION. OVERLAP ADJACENT U) 0.05 ACRES 00 -- STRIPS OF FABRIC AT LEAST 24" OU � DESIGN SPECIFICATIONS: \ ,� _-0 DS-------------------- ---{' ------------- -f -� YARD DRAIN #3 1. A MINIMUM OF 6 INCHES OF FREE -DRAINING SAND OR GRAVEL BASE IS REQUIRED UNDER THE POROUS \ ) I STA 10+80.52,105.02L CONCRETE SURFACE. f 51 LF 4 0 PVC PIPE I " RIM = 434.31 2. THE FREE -DRAINING BASE SHALL HAVE LESS THAN 5% FINES (MATERIAL PASSING THE #200 SIEVE) ERVIOUS PAVEMENT ) I - ' - _ ; IE(NW) = 431.7912" 0 BASED ON THE FRACTION PASSING THE #4 SIEVE. PER DTL 1/C3 - - ^ __ i IE(S) = 431.7912" 0 3. THE POROUS PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 10 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONIC BAND AT CONNECT DS ON REAR OF I ; 59 LF 12" 0 PVC PVC Pipe @ 2.15% CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE I US PER COR STD I ' BUILDING TO CONVEY BUCKET TEST IN WHICH 5 GALLONS OF WATER ARE POURED ONTO THE PAVEMENT SURFACE ALL AT ( PLAN 261.00 �`af) STORMWATER TO ' ONCE FROM A 5-GALLON BUCKET. IF NOTHING BUT A SCANT AMOUNT OF WATER PUDDLES OR RUNS TABLE 1 SAND MEDIUM SPECIFICATION US SIEVE NUMBER PERCENT PASSING 4 95-100 8 70-100 16 40-90 30 25-75 50 2-25 100 <4 200 <2 LOT 2 PERMEABLE PAVEMENT I \ OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF W 433.32 5090.08 SQ FT I ABSORPTION. IF THIS TEST IS NOT CONCLUSIVE, THEN A 6-INCH RING SEALED AT THE BASE TO THE m 33.I l 00 0.12 ACRES 5 I .2' PRIVATE STORM PAVEMENT SURFACE SHALL BE USED TO MEASURE THE ACTUAL RATE OF ABSORPTION. ` � EASEMENT `\PERMEABLE 0 433.50 L 0 T 2 83, 1 PAVEMENT Z ' NEW 15 LF 4"0 PVC SDR 35 , ` , NTS UNDER SEPARATE PERMIT FF = 433.50 `\ ~ 1 W/SODS CREEK SWD I1 W W J RECONNECT/EXG I HOUSETO/NEW \ CROSSING TABLE _ WATER SERVI LINE I I 1 433.50 o \ j USE SPLASHBLOCKS TO ' C B NOTES. CHECK DAMS PER PERVIOUS PAVEMENT DTL 11C3 32.75 6.4 FT SPACI G BETWEEN DI i DIRECT FLOWS FROM DS T4DAMSDIRECT PERMEABLE PAVEMENT 51 LF 4" 0 PVC PIPE ; \ 1. CB PER COR STD DTL 200 UNLESS OTHERWISE INDICATED ON 1 ' EXG 8 LF 4"0 PVC . ADS________________ THESE PLANS. _--- ---__ __-0 ---- ------ 2. CB INSTALLATION PER COR STD DTL 202 UNLESS OTHERWISE SIDE SEWER STUB INDICATED ON THESE PLANS. � o,`'\ HOUSE TO NEW -� o-b � ° j CONIC BAND BETWEEN PAVEMENTS A9 15 LF 12 PVC Pipe 2.70% PER COR STD PLAN'261.00 ) WATER SERVICE LINE °� o I 1 CB#3 �' TYPE 1 CB, FRAME &GRATE - - - - - -� / YARD DRAIN #2 NEW DOMESTIC WATER SERVICE YARD DRAIN #1 \� STA 10+80.73, 46.34L; STA 10+05.83, 30.92L . STA 10+72.59, 33.78L RIM = 431.10 CONNECTIONS AND METERS UNDER / RIM = 433.25 _ IE(S,12.0) = 428.82 � SEPARATE PERMIT W/ SOOS CREEK SWD RIM 1433.09 IE(N) = 430.5312" 0 � - �- '- - IE(NE) = 430.1212" 0 IE(SW) = 430.5312" 0 TEL - ` = _� �L _ ..__ NEW FH IE(SE) = 430.1212" 0 C - ® g 00 1. EXCAVATE TO THE ELEVATION OF THE FREE -DRAINING SAND OR GRAVEL BASE. 2. PREVENT SEDIMENT AND RUNOFF FROM ENTERING BED DURING CONSTRUCTION. 3. COMPACT UPPER 12" OF EXISTING SUBGRADE SOIL TO ENSURE 90-92% STANDARD PROCTOR 4. AVOID OVER -COMPACTION BY RESTRICTING ACCESS TO THE AREA FOR MATERIAL STOCKPILING & HEAVY CONSTRUCTION VEHICLES 5. FINAL GRADING SHOULD BE COMPLETED BY MACHINERY OPERATING ON A PRELIMINARY SUBGRADE THAT IS AT �-- LEAST 12 INCHES HIGHER THAN FINAL GRADE OR (fl STRUCTURES TO DISTRIBUTE EQUIPMENT LOAD (E.G., STEEL PLATES OR AGGREGATE BASE MATERIAL). FINAL co EXCAVATION THEN PROCEEDS AS MACHINERY IS PULLING 0 BACK AND TRAVELING ON PRELIMINARY GRADE AS FINAL 0 GRADE IS EXCAVATED. 6. TO PREVENT COMPACTION WHEN INSTALLING THE T AGGREGATE BASE, THE FOLLOWING STEPS {_) (BACK -DUMPING) SHOULD BE FOLLOWED: 1) THE AGGREGATE BASE IS DUMPED ONTO THE SUBGRADE FROM THE EDGE OF THE INSTALLATION AND AGGREGATE IS THEN PUSHED OUT ONTO THE SUBGRADE; 2) TRUCKS THEN DUMP SUBSEQUENT LOADS FROM ON TOP OF THE AGGREGATE BASE AS THE INSTALLATION PROGRESSES. 7. AVOID SUBGRADE PREPARATION DURING WET PERIODS (SOIL COMPACTION INCREASES SIGNIFICANTLY IF SOIL IS WET). 8. IF MACHINERY MUST ACCESS THE FINAL GRADE, LIMIT THE ACCESS TO A SPECIFIC TRAVEL WAY THAT CAN BE TILLED BEFORE APPLICATION OF THE BASE AGGREGATE OR PLACE HEAVY STEEL PLATES ON SUBGRADE AND LIMIT C0 TRAFFIC TO THE PROTECTIVE COVER. (0 NOTE: ALLOWING HEAVY MACHINERY ON PERMEABLE In PAVING SUBGRADES DURING WET OR SATURATED O CONDITIONS WILL RESULT IN DEEP COMPACTION (OFTEN 3 O FEET) AND CANNOT BE COMPENSATED FOR BY SHALLOW CD TILLING OR RIPPING SOIL (BALOUSEK, 2003). C9 r- SAND SPECIFICATION: THE SAND MUST CONSIST OF A MEDIUM SAND MEETING THE 0 SIZE GRADATION (BY WEIGHT) GIVEN IN TABLE 1. THE CONTRACTOR MUST OBTAIN A GRAIN SIZE ANALYSIS FROM THE SUPPLIER TO CERTIFY THAT THE SAND MEETS THE NO. 100 AND NO. 200 SIEVE REQUIREMENTS. (NOTE: STANDARD BACKFILL FOR SAND DRAINS, WA. STD. SPEC. 9-03.13, DOES NOT MEET THIS SPECIFICATION AND DO NOT USE SPEC 9-03.13 FOR SAND FILTERS.) Crossing Pipe ID Pipe Material Size Outside Invert Pipe ID Pipe Material Size Outside Invert Separation Number Diameter (in.) Elevation (ft.) Diameter (in.) Elevation (ft.) (in) (in) (ft ) PVC SDR-35 PVC SDR-35 S1 STORM (4"-36") 12.0000 12.5000 427.55 SEWER (4"-36") 6.0000 6.2750 420.41 6.61 PVC SDR-35 PVC SDR-35 S2 STORM (4"-36") 8.0000 8.4000 428.14 SEWER (4"-36") 6.0000 6.2750 418.77 8.84 PVC SDR-35 DI Class 52 W1 STORM (4"-36") 12.0000 12.5000 426.43 WATER (C-54") 6.0000 6.9000 424.36 1.52 PVC SDR-35 Concrete W2 ISTORM (4"-36") 1 12.0000 1 12.5000 1 426.69 1 WATER (6"-72") 1 12.0000 1 17.0000 1 423.25 1 2.21 ® - - d 431.59 S88 �4 46 E 85.00 12" AC (REF) 1 _ - _ - .75 ° a. ° 431,35 � � -, - ( EXG CORRUGATE1D HDPE PIPE ,� ° --- d e _ OHP .1--_ - 24 LF - ° d � . < , -a - � - a-... d 12" PVC Pipe @ 2.55% � T�L �-- -0"[W _= 3t�P .�..�.,.�_ 19 L 12" SDR-35 8.60 2---� UGP ° p _ d ° TEl_ - - _ _W a - ° 1- ° UGP------- IE - 431.92 \ - - W- - OH - -- - 6" (REF) ° a L 4 ° d \\` �- -W-\��\lj /W - - OHPOHP p OHP - --- - OHP OHP 78 LF 12" SDR-35 @ 2.95/°gu 28 LF 16" DIP @ 1.32°k oil 0 - - - /- - - - CONTRACTOR T E - / . 15VERTICAL SEPARATION j CONTRACTOR 74 ENSURE 14 LF 12"SDR 35 16.74% / I BETWEEN STORM & WATER / 15VERTICAL SEPARATION / @ BETWEEN STORM & WATER 10+00 04 46SE*1 6.4THw- E 260.ST' -0. 11+19 S - _S- _ -s - S - EXG CB - S - - S - - S,- - - S - __ - S EXG SSMH STA 10+0120;1 G B CB # 1 - S - S - - - -- S - - STA 9+63.26; 6:97R RIM = 430.41 TYPE 1 CB, FRAME &GRATE \ - S __ _ - S - S - - S _ _ _ S -- --- S - - - S - RIM = 428.75 � IE(N) = 425.56 6" 0 PVC STA 10+05.89,12.09L I \ CTB E21 CB,4RAME & GRATE \ -S - INV(E) = 415.1210".PVC IE(W) = 426.17 CORRUGATED HDPE PIPE RIM =3Q,29 �. STA 10+83.77,12:08L I \ RAISE RIM TO MATCH NEW GRADE) IE(W,16 0) =427.20 RIM = 433.33 ( = 427. IE(W,12"0) = 429.50 \ \ IE(E,12 0) = 427.20 \ I IN - - KW,12"0 = 429.50 -D - IE(NE,12"0) = 429.50 CY) U O 00 a CF) CU m Z N W x 0 W L1J a �W Z H� h W Cl) Z J M U v UW v a> a> c LLI Cn 0 a w U D_ -� - -p - - - - ____f_ - R-397003 -p- -D -D �D - !N COMPLIANCE WITH CITY OF RENTON STANDARDS l -- N -- W E GRADING, DRAINAGE, & UTILITIES PLAN 1 "•=10' S C� --i SURVEYED: SCALE:VERTI_ DESIGNED: SCALE HORIZONTAL: NAD 1983/1N1 CITY OF KL R DRAWN: ENTON KL ' ONE INCH DATUM CHECKED: AT FULL SCALE Planning/Building/Public Works Dept. AEP IF NOT ONE INCH NO. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY DEVELOPMENT ENGINEERING SURFACE WATER UTILITY � ~ < Ann Fowler 08/01 /2018 rstraka 08/03/2018 --I n I -- Cc TO DATE: �+� 08/03/2017 U) LALLY'S SHORT PLAT FIEWWOK: BOOK (n PAGE: PAGE DRAWING N GRADING, DRAINAGE & C3 J UTILITIES PLAN �F�° 3 °F R-397003