HomeMy WebLinkAboutCO 2CAG-18-068, CO #2-18 • Change Order No. 2 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contractor: Gary Merlino Construction Co., Inc. Contract No.: CAG 18-068 Federal Aid No.: N%A Ordered by Engineer ❑ Proposed by the Contractor (VECP) ❑ Unilateral Original Contract Amount: $1,394,565.00 Current Contract Amount: _ $1,098,034,69 Estimated Net Change This Order: $2,210.00 New Contract Amount: $1,100,244.69 Prepared By: Issued B esid Enineer g Date n ineer(cityof entanTransportation Date Rtt Design Manager) Reviewed By: Consent By: Engineer of Record Date Reviewed By: __fir_ _ .�_ City - R nton Project Manager Date Reviewed By: City Attorney (Greater than $35,000 Date and/orchangeinscope) Surety (Greater than 25% cost and/or 20% Date time increase) Endorsed By: At, JL- Contractor Date Executed By: q� CityWist o ublic Works Da e Aator / Mayor Change Order No. 2 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contract No. CAG-18-068 Pagel of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The current City Standard for concrete curb and gutter calls for 18" from back of curb to roadway edge. In the Maple Ridge Estates neighborhood, or Map Number 1 of the contract, the Contractor is requesting a change from City Standard to use 24" rolled curb. Reason for Change: To replace the existing curb in kind, the Contractor has notified the City that a deviation from the City Standard will be needed, and 24" rolled curb should be used. Materials: Plans: This change will result in a reduction of 221 linear feet of bid item 27 (Cement Conc. Traffic Curb & Gutter), and the addition of 221 linear feet of Rolled Cement Concrete Traffic Curb and Gutter as new bid item 41, resulting in a net increase of $2,210. Appendix A - Map Number 1 Extension of Time: The Time for Completion is extended 0 Working Days. Equitable Adjustment: This Change Order includes a significant change 0 . See attached. Contract Provisions: Schedule of prices: Bid Item #27, Cement Conc. Traffic Curb and Gutter — REDUCED Schedule of prices: Bid Item #41, Rolled Cement Conc. Traffic Curb and Gutter - ADDED Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Change Order No. 2 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contract No. CAG-18-068 Page 2 of 3 Estimate of Change Order Cost: Bid Item No.1 Description I Quantity Unit Unit Price Estimated Cost Force Account Item description Labor D , Estimate - LaborMarku 0" 29% _ Equipment D : Estimate - Equipment Markup 0 21%':: $ _ Materials?' Estimate r, $ - Materials Markup {?,`� 21% $-. $ _ Services .0 Estimate $ - Services Markup 21% $ - Mobilization ?. ,._: Estimate $, ': , - $ - Subcontractor Work Estimate $ $ - Subcontractor Markup 0 . 12%, 10%, 7% $ $ - Bid Item Change 27 ICEMENT CONC. TRAFFIC CURB AND GUTTER -221 LF $ 75.00 $ (16,575.00) 41(NEW) I ROLLED CONC. TRAFFIC CURB AND GUTTER 1 221 f LF $ 85.00 $ 18,785.00 Equitable Adjustment Per attached determination Estimate $ - Total Cost $ 2.210.00 *Adjustment in unit bid price for bid item increase/decrease of 25% or more. Change Order No. 2 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contract No. CAG-18-068 Page 3 of 3