Change Order No. 3
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contractor: Gary Merlino Construction Co., Inc.
Contract No. EAG-18 068
Federal Aid No.:
0 Ordered by Engineer
EJ Proposed by the Contractor (VECP)
n Unilateral
Original Contract Amount:
Current Contract Amount:
Estimated Net Change This Order:
New Contract Amount:
$1,394,565.00
$1,100,244.69
-$-0-00--
$1,100,244.69
Prepared By: Issued By:
Rkesi �ntEngi eer Date 'Engineer (City of Renton Transportation Date
Reviewed By: Design Manager)
Consent By:
Engineer of Record Date Surety (Greater than 25% cost and/or 20% Date
time increase)
Reviewed By: Endorsed By:
ze Wy, AA
City &fR nton" Project Manager Date Contractor Date
Reviewed By: Executed By:
Pub is City Attorney (Greater than $35,000 Date City of e t Pu ic Works D *te
and/or change in scope) i M r
Adminis Arator /Mayor
Change Order No. 3
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068 Pagel of
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
Contractor has requested written concurrence from the Engineer to change the
beginning date for prohibition of placing wearing course HMA set by Special Provision 5-
04.3(1) of the contract from October 1, to November 1.
Reason for Change:
Change is requested because the project has been delayed due to an operators strike.
Contract Provisions:
Special Provision 5-04.3(1): Weather Limitations — REVISED
Materials:
None.
Plans:
None.
Extension of Time:
The Time for Completion is extended 0 working Days.
Equitable Adjustment:
This Change Order includes a significant change: None.
Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Change Order No. 3
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068 Page 2 of 3
Estimate of Change Order Cost:
Bid Item No.
Description
Quantity
Unit
Unit Price
Estimated Cost
Force Account
Item description
Labor
Estimate
-
Labor Markup#
`
29%
_
Equipment
Estimate
$
Equipment Markup
0.:: ':
21%
-
Materials
;=
Estimate
$ �•'
$ -
Materials Markup21%-
Services
Estimate
-
Services Markup
r.
21%.,u;
$ _
Mobilization
fl...".
Estimate
$
$ -
Subcontractor Work;
'0=
Estimate
";
$ -
Subcontractor Markup
`,.. Q !
12%, 10%, 7%-
Bid Item Change
0_
.,
$ -
0-
0$
$ -
Equitable Adjustment
"`'Per
attached determination
0
Estimate
$,'
$ -
Total Estimated Cost
$0.00
This Change Order will result in no change to the contract amount.
Change Order No. 3
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068 Page 3 of 3