September 5, 2018
Phyllis Chandler
8207 S 132nd St
Seattle, WA 98178
Subject: EARLINGTON TOWNHOMES SCHEDULE AND TRAFFIC CONTROL PLANS
C17004096
Dear Ms. Chandler:
Thank you for your continued interest in this project. Please find enclosed baseline construction
schedule and latest set of construction traffic control plans for Earlington Townhomes. Please provide
the City or Renton with any comments or concerns to the construction traffic control plans within ten
(10) calendar days of mailing.
If you have any further questions, please feel free to contact me at 425-430-7289 or
cclose@rentonwa.gov.
Sincerely,
Clark H. Close
Senior Planner
Enclosures Earlington Townhomes Baseline Schedule, dated September 4, 2018
Traffic Control Plan, approved date June 21, 2018
Traffic Control Plan, approved date July, 16, 2018
Traffic Control Plan, approved date August 8, 2018
cc: David Avenell / Applicant
FormResetFormCITYOFRENTONTRAFFICCONTROLPLANPROJECTNAME:Ej:Toea,.øsLSCONSTRUCTIONCOMPANY:?l%4I&bWLULL(...CONTACTNAME:1),;(ADDRESS:l!1’4SW.‘¶4S;k.laoi..lls..i11A‘oOSPERMIT#LI100LB?%PHONE#:PHONEt:-7100CELL#:E-MAILADDRESS:cvjFAX#:PROJECTLOCATION:,4ç4sWORKTIME:_________________(o/(/1—?/(o/tPermitHolderagreestoallthefollowing:N/E/S/WOF:APPROVEDBY:APPROVALDATE:0(/-t1,8•ComplywithalltrafficregulationsoftheCityofRentonandtheStateofWashington.•PrepareatrafficcontrolplanandobtainCityapprovalofthatplan.Thatplanshallbeimplementedforallstreetandlaneclosures,andtheplanshallbeperformedincompliancewiththeManualonUniformTrafficControlDevices.•Notifyemergencyservices(253-852-2121)twenty-four(24)hoursbeforeanystreetorlaneclosures.-Anylaneorstreetclosuresnotinconformancewiththeapprovedtrafficcontrolplanand/orwithoutnotificationofemergencyservicesmayresultinreceivingacitationforviolationofR.C.W.47.36.200through47.36.220,9A.36.050RecklessEndangerment,andotherapplicableStateandCitycodes.•IndemnifyandholdharmlesstheCityofRentonfromanyandallclaims,actions,andjudgments,includingallcostsofdefenseandattorney’sfeesincurredindefendingagainstsame,arisingfromandrelatedtoimplementationoftheapprovedtrafficcontrolplansincludingclaimsarisingfromtowingofprivatevehiclesandtheactsofthePermitHolder’sagentsandemployees.•TheCityofRentonshallbeentitled,initsreasonablediscretion,tosettleclaimspriortosuitorjudgment,andinsucheventshallindemnifyandholdharmlesstheCityforanysuchclaimspaid,includingtheCity’sreasonableattorney’sfeesandlitigationcostsincurredresultingfromsuchclaim.•IntheeventanyclaimorsuitisbroughtagainstCitywithinthescopeofthisAgreement,PermitHolderwillpayforlegalcounselchosenbytheCitytodefendagainstsame.•FlaggerandsignplacementaresubjecttorevisionbytheCityInspectoronsite,ifneededtoaddresstrafficorpedestriansafetyortravel.•Bymysignatureherein,Iacknowledgealltheaboverequirements.PRINTNAME:SIGNATURE:A\ttUDATE:N)iXOFFICECOPYT-U.’lCONTRACTOR0EV.SERVICE,INSPECTIONP.MILLER0EV.SERVICE,PLANREVIEWB.BANNWARTHPOUCECHARLESKARLEWICZFIREFIREMARSHALLFS#13
NOTES:•WorkZoneTrafficControlshallbeinaccordancewiththeManualonUniformTrafficControlDevices(MUTCD)andshownbysketchorreferencetoWSDOT.•TheplanmustbesubmittedtotheCity’sPW/TransportationDivisionforreviewand/orapprovalatleastthreeworkingdayspriortowork.•ApprovedTemporaryTrafficControlPlanmustbeattheworksiteduringworkhours.•ContractororentitymustcallRentonSchoolDistrict(425-204-4455)oranypublic/privateagencytobeaffectedbyatemporarylaneorroadclosure.•Completeassistanceandaccommodationshallbeprovidedtoallkindsofpedestriantrafficwhensidewalkorwalkwayisimpeded.•Totalroadclosurelastingmorethan24hoursissubjecttotheapprovalbytheCityCouncil.•Anyvehicle,equipment,barricade,orportabletow-awaysignusedwithintheworkareamustdisplayacompanylogooranylegallyacceptablesignshowingthecompanyname,address,andtelephonenumberataconspicuousplaceonthevehicleorequipment.InthecaseofTemporaryNoParkingZones,allthefollowingapplyinadditiontoprevious:•ContractormustcompleteformtoshowlimitsofTemporaryNoParkingZoneidentifyingbarricadelocationsforvacateparkingorcurblaneusage.•ContractormustpostnoticeofdatesandtimeofTemporaryNoParkingZonewithatleasttwosignsperblock72hoursinadvanceofeffectivedateandtime.•ThecoversheetofthisTrafficControlPlanformmustbeattachedtoeachTemporaryNoParkingSignontheprojectsite.•Temporarytrafficcontroldevicesmustberemovedimmediatelywhenworkisdoneornoconstructionactivitiesaregoingon.Ifdeemedabandoned,CitycrewswillremoveandstorethemattheCity’smaintenanceshop(3555NE2’Street).SKETCH--NORTH--‘SPeLV(,a.Ck1.L4O#1.1+sjcG’oNz.aSwp7S-ArTt‘tc.°‘cN2
JR HAYES
Co R P0 RATION
Description:Lane Shift
Job Contact:206423.6619
i CRANNEUZING 3EVES SPACiNG (FEET
MPH TAPER
50/70 40 80
35/45 30 60
25/30 20 40
Job Notes
*All signs and spacing shall conform to MUTCD
*NOT TO SCALE
*Notify all local emergency services of closure times
and dates
*Sign spacing may be reduced to fit roadway conditions
*Alert Metro Impact 5 days in advance of any Bus stop
changes 206-477-1140
*No Parking must be placed 72 hours in advance of work
*No Parking signs spaced out at 40’
N
W20-1
W20-5
W4-AP W20-1
P#
TRAFFIC CONTROL PLAN
R3-2W201W20-7b W20-7a
fgger with slow paddle up at all times,may
stop Renton Ave traffic to relieve S 130th St
Location:132nd Lane &Renton Ave Renton
Job Hours:8:30 AM .3:30 PM
Legend
28”cone
4 Arrow
%Arrowboard (Chevron)
RS-031 Bus Stop
*Sign
W20-1
W20-5
W20-7a
•
Work Area
R3-2
MINIMUM TAPER LENGTH (L)IN FEET
Date:4/13/2018 Author:Adam Taylor
LANE
WIDTH POSTED SPEED (MPH)
(FEET)25 30 35 40 45 50 55 60 65 70
10 105 150 205 265 450 500 550 ---
11 115 165 25 95 95 50 05 60 --
12 125 180 245 320 540 600 660 720 780 840
Comments:
TCS#008801
PHONE #(425)658-3655
_________
FAX #(425)658-3658
CELL#(206)492-9364
E-MAIL adarwffltta#lccontrolservrcesnet
SUGGESTEDADVANCE WARNING 564 PLACEMENT
OADTYPE DISTANCE BEPAEEN SIGNS
I SPEED
A B C DF——
AWI&I 25/30 2OcV 20Y 201Y X
35/40 350’350’350 X
RURAL 45/5(3 500’500’500 500’
60/65 8OCE 80CY 801Y [800’
j 55(70 1500’1500’i50O’[’
W20-1
-2
W2D-5,/
\W20-1
D
0)
C
D
n0
Location:Renton Ave S &S 132nd St Renton
Description:One Lane Two Way Taper
W20-7b
ZcacIZe’o.
W20-1
W20-7b
W20-7a
Job Notes
*All signs and spacing shall conform to MUTCD
*NOT TO SCALE
*Notify all local emergency services of closure times
and dates
*Sign spacing may be reduced to fit roadway conditions
*Alert Metro Impact 5 days in advance of any Bus stop
changes 206477-1 140
*No Parking must be placed 72 hours in advance of work
*No Parking signs spaced out at 40’
Legend
28”cone
RS-031 Bus Stop
4R Sign
•
-t’W20-7a
W20-7b
t>WorkArea
JR HAYES Job Hours:Barn -4pm
CORPORATION
Job Contact:206-423-6619
*tb cW
TRAFFIC CONTROL PLAN
P#
N
SUGGESTED/1Y/ANCE4RNINGSG1 PIfiCEMENI
P.QADIYPE DISTANCE BETWEEN SIGNS
SPEED
A B C D
n1tCLiF1 25/30 200’200’200’X
35/40 350’350’350’X
RURAL 45160 500 500 500’500’
60/65 800’800’800’800’
A’55110 1500’1500’1500’1500’
Downstream Taper 50-1O0’
ChannellzatiOfl Device Spacing 20’
D
0)
0
0
3
r,,HLtUtII1---4CITYOFRENTONTRAFFICCONTROLPLANitvof.1PermitHolderagreestoallthefollowing:CELL#:,23-377-t’71•ComplywithalltrafficregulationsoftheCityofRentonandtheStateofWashington.•PrepareatrafficcontrolplanandobtainCityapprovalofthatplan.Thatplanshallbeimplementedforallstreetandlaneclosures,andtheplanshallbeperformed,incompliancewiththeManualonUniformTrafficControlDevices.•Notifyemergencyservices(253-852-2121)twenty-four(24)hoursbeforeanystreetorlaneclosures.•Anylaneorstreetclosuresnotinconformancewiththeapprovedtrafficcontrolplanand/orwithoutnotificationofemergencyservicesmayresultinreceivingacitationforviolationofR.C.W.47.36.200through47.36.220,9A.36.050RecklessEndangerment,andotherapplicableStateandCitycodes.•IndemnifyandholdharmlesstheCityofRentonfromanyandallclaims,actions,andjudgments,includingallcostsofdefenseandattorney’sfeesincurredindefendingagainstsame,arisingfromandrelatedtoimplementationoftheapprovedtrafficcontrolplansincludingclaimsarisingfromtowingofprivatevehiclesandtheactsofthePermitHolder’sagentsandemployees.•TheCityofRentonshallbeentitled,initsreasonablediscretion,tosettleclaimspriortosuitorjudgment,andinsucheventshallindemnifyandholdharmlesstheCityforanysuchclaimspaid,includingtheCity’sreasonableattorney’sfeesandlitigationcostsincurredresultingfromsuchclaim.•IntheeventanyclaimorsuitisbroughtagainstCitywithinthescopeofthisAgreement,PermitHolderwillpayforlegalcounselchosenbytheCitytodefendagainstsame.•FlaggerandsignplacementaresubjecttorevisionbytheCityInspectoronsite,ifneededtoaddresstrafficorpedestriansafetyortravel.•Bymysignatureherein,Iacknowledgealltheaboverequirements.PRINTNAME:C=SIGNATURE:DATE:PROJECTNAME:r.±Sttbii-CONSTRUCTIONCOMPANY:CONTACTNAME:______________________________ADDRESS:t]ALLi9c3PERMIT#PHONE#:/-3-E-MAILADDRESS:-tPROJECTLOCATlON:PHONE#:?/1(,cWORKTIME:WORKDATE:-‘kt--c7/tb—3(3’________FAX#:N/E/S/WOF:APPROVEDBY:APPROVALDATE:01/jcot(OFFICECOPYT-\-i,L$CONTRACTOR0EV.SERVICE,INSPECTIONP.MILLER0EV.SERVICE,PLANREVIEWB.BANNWARTHPOLICECHARLESKARLEWICZFIREFIREMARSHALlFS#13
NOTES:•WorkZoneTrafficControlshallbeinaccordancewiththeManualonUniformTrafficControlDevicesfMUTCD)andshownbysketchorreferencetoWSDOT.•TheplanmustbesubmittedtotheCity’sPW/TransportationDivisionforreviewand/orapprovalatleastthreeworkingdayspriortowork.•ApprovedTemporaryTrafficControlPlanmustbeattheworksiteduringworkhours.•ContractororentitymustcallRentonSchoolDistrict(425-204-4455)oranypublic/privateagencytobeaffectedbyatemporarylaneorroadclosure.•Completeassistanceandaccommodationshallbeprovidedtoallkindsofpedestriantrafficwhensidewalkorwalkwayisimpeded.•Totalroadclosurelastingmorethan24hoursissubjecttotheapprovalbytheCityCouncil.•Anyvehicle,equipment,barricade,orportabletow-awaysignusedwithintheworkareamustdisplayacompanylogooranylegallyacceptablesignshowingthecompanyname,address,andtelephonenumberataconspicuousplaceonthevehicleorequipment.InthecaseofTemporaryNoParkingZones,allthefollowingapplyinadditiontoprevious:•ContractormustcompleteformtoshowlimitsofTemporaryNoParkingZoneidentifyingbarricadelocationsforvacateparkingorcurblaneusage.•ContractormustpostnoticeofdatesandtimeofTemporaryNoParkingZonewithatleasttwosignsperblock72hoursinadvanceofeffectivedateandtime.•ThecoversheetofthisTrafficControlPlanformmustbeattachedtoeachTemporaryNoParkingSignontheprojectsite.•Temporarytrafficcontroldevicesmustberemovedimmediatelywhenworkisdoneornoconstructionactivitiesaregoingon.Ifdeemedabandoned,CitycrewswillremoveandstorethemattheCity’smaintenanceshop(3555NE2Street).SKETCH--NORTH-fr7T4cHEOp.wPZ_1ZLOfwPt’4
W20-2
gertodirectdriVewaytraffiC”
S 132nt
FIELD LOCATE 1 MILE IN
ADVANCE OF LANE CLOSURE SIGNING
SUGGESTED 0VANCE WARMNG S GN PLACEMENT
“DTYPE 0’SIANCEBEWt’EEN SIGtS
SPEED
A B C 0
.4
o’*l 25/30 200’200 200’X
35/40 350’350’350’X
RURAL 45/60 500 500’500’500’
-i k.”hd 60/65 800 800’800’800’
55/70 1500’1500 1500 1500
AIPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
Job Notes
*All signs and spacing shall conform to MUTCD
*NOT TO SCALE
*Notify all local emergency services of closure times
and dates
*Sign spacing may be reduced to fit roadway conditions
*Alert Metro Impact 5 days in advance of any Bus stop
changes 206477-11 40
*No Parking must be placed 72 hours in advance of work
*No Parkinca sictns snarpd out at 4O
28”cone
t No Left Turn
Road Closed
RS-031 Bus Stop
4 Sign
Type 3 BarnCade
W20-1
W20-2
4 W20-3
Location:Renton Ave S &S 132nd St Renton
m HAYES
COIl P0 RATION
Description:One Lane Two Way Taper
Job Hours:8:30am -4pm
Job contact:206-423-6619
S 132nd Full Closure
TRAFFIC CONTROL PLAN
W20-1
R3-2
Arrow
I Date:4/12!20’8 Author:Adam Iaor
-Comments:
TCS #008801
PHONE 8 (425)658-3655_JI FAX 0(425)658-3658
______
CELL/f (206)492-9364
--
Ia et,iCeS nt
S 132rn
JR HAYES
CO R P0 R AltO N
Location:Renton Ave S &S 132nd St Renton
Description:One Lane Two Way Taper
Job Hours:8:30am -4pm
Job Contact:206-423-6619
J_
_c_
S 132nd Full Closure
W20-3 W20-2
PCMS
1 2
Sl32ndAve 8AM-4PM
To be Closed Work Date
from Use Detour
1.5SEC 1.5SEC
FIELD LOCATE 1 MILE IN
ADVANCE OF LANE CLOSURE SIGNING
ROWDPE DISTANCE BETWEEN SIGNS
SPEED
A B C 0
Li06t 25/30 200 200 200 X
°)35/40 350 350 350’X
RURAL 45/60 500 500 500’500’
RUWJ1S 60/65 800’800’800 800’
55/70 1500’1500,1500’1500’
Job Notes
*All signs and spacing shall conform to MUTCD
*NOTTO SCALE
*Notify all ‘ocal emergency services of closure times
W20-2
TRAFFIC CONTROL PLAN
Date:6127/2018 Author:Adam Ta4or
—Comments:
TCS#008801EZPHONE#(425)658-3655
—FAX 8(425)658-3668
CELL#(206)492.9364
E-MAIL:adam trafficcontOlSefVlces nd
and dates
*No Parking signs spaced out at 40
*Sign spacing may be reduced to fit roadway conditions
*Alert Metro Impact 5 days in advance of any Bus stop
changes 206-477-1140
*No Parking must be placed 72 hours in advance of work
D
0
C’
0
3
tion.com
‘JLZ::iTRAFFICCONTROLPLANPROJECTNAME:_______________________________________PERMIT____________CONSTRUCTIONCOMPANY:__________________________________PHONE#:/5-3c7.CONTACTNAME:PHONE#:2o-%23-tCi’jADDRESS:___________E-MAILADDRESS:Dc€FAX#:PROJECTLOCATION:ç-ç-wcS.Sta--WORKTIME:-3O-3O_çN/E/S/WOF:APPROVEDBY:WORKDATE:-APPROVALDATE:Q/e/iePermitHolderagreestoallthefollowing:•ComplywithalltrafficregulationsoftheCityofRentonandtheStateofWashington.•PrepareatrafficcontrolplanandobtainCityapprovalofthatplan.Thatplanshallbeimplementedforallstreetandlaneclosures,andtheplanshallbeperformedincompliancewiththeManualonUniformTrafficControlDevices.•Notifyemergencyservices(253-852-2121)twenty-four(24)hoursbeforeanystreetorlaneclosures.•Anylaneorstreetclosuresnotinconformancewiththeapprovedtrafficcontrolplanand/orwithoutnotificationofemergencyservicesmayresultinreceivingacitationforviolationofR.C.W.47.36.200through47.36.220,9A.36.050RecklessEndangerment,andotherapplicableStateandCitycodes.•IndemnifyandholdharmlesstheCityofRentonfromanyandallclaims,actions,andjudgments,includingallcostsofdefenseandattorney’sfeesincurredindefendingagainstsame,arisingfromandrelatedtoimplementationoftheapprovedtrafficcontrolplansincludingclaimsarisingfromtowingofprivatevehiclesandtheactsofthePermitHolder’sagentsandemployees.•TheCityofRentonshallbeentitled,initsreasonablediscretion,tosettleclaimspriortosuitorjudgment,andinsucheventshallindemnifyandholdharmlesstheCityforanysuchclaimspaid,includingtheCity’sreasonableattorney’sfeesandlitigationcostsincurredresultingfromsuchclaim.•IntheeventanyclaimorsuitisbroughtagainstCitywithinthescopeofthisAgreement,PermitHolderwillpayforlegalcounselchosenbytheCitytodefendagainstsame.•FlaggerandsignplacementaresubjecttorevisionbytheCityInspectoronsite,ifneededtoaddresstrafficorpedestriansafetyortravel.•Bymysignatureherein,Iacknowledgealltheaboverequirements.DATE:8
/t/
i&_________________SIGNATURE:_____f-{jL\J4U6iftL)Irgo38CELL#:337;’-I7OFFICECOPYTCONTRACTORDEV.SERVICE,INSPECTIONP.MILLERDEV.SERVICE,PLANREVIEWB.BANNWARTHPOLICECHARLESKARLEWICZFIREFIREMARSHALLFS#13I
NOTES:•WorkZoneTrafficControlshallbeinaccordancewiththeManualonUniformTrafficControlDevices(MUTCD)andshownbysketchorreferencetoWSDOT.•TheplanmustbesubmittedtotheCity’sPW/TransportationDivisionforreviewand/orapprovalatleastthreeworkingdayspriortowork.•ApprovedTemporaryTrafficControlPlanmustbeattheworksiteduringworkhours.•ContractororentitymustcallRentonSchoolDistrict(425-204-4455)oranypublic/privateagencytobeaffectedbyatemporarylaneorroadclosure.•Completeassistanceandaccommodationshallbeprovidedtoallkindsofpedestriantrafficwhensidewalkorwalkwayisimpeded.•Totalroadclosurelastingmorethan24hoursissubjecttotheapprovalbytheCityCouncil.•Anyvehicle,equipment,barricade,orportabletow-awaysignusedwithintheworkareamustdisplayacompanylogooranylegallyacceptablesignshowingthecompanyname,address,andtelephonenumberataconspicuousplaceonthevehicleorequipment.InthecaseofTemporaryNoParkingZones,allthefollowingapplyinadditiontoprevious:•ContractormustcompleteformtoshowlimitsofTemporaryNoParkingZoneidentifyingbarricadelocationsforvacateparkingorcurblaneusage.•ContractormustpostnoticeofdatesandtimeofTemporaryNoParkingZonewithatleasttwosignsperblock72hoursinadvanceofeffectivedateandtime.•ThecoversheetofthisTrafficControlPlanformmustbeattachedtoeachTemporaryNoParkingSignontheprojectsite.•Temporarytrafficcontroldevicesmustberemovedimmediatelywhenworkisdoneornoconstructionactivitiesaregoingon.Ifdeemedabandoned,CitycrewswillremoveandstorethemattheCity’smaintenanceshop(3555NE2Street).SKETCH--NORTH-5e
SUGGESTEDADVANCE WARNtIG S/G PlACEMENT
RONITYPE DISTANCE BETWEEN SIGNS
SPEED
q4flRA)25/30 200’200’200’X
‘45I 35/40 350’350’350’X
RURAL 45/60 500 500’500 500’
8M361 60/65 800 800’800’800
EWITG 55/70 1500’1500 1500’1500’
Dat.:4)1212018 Author:Adam Taylor
Comments:I TCS8008801
PHONE #(425)658-3855
_FAX 1(425)658-3658
CELL#(206)492-9364
nirotsarvlces net
CHANNEL2INGV1CESSGNG El
MPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
Job Notes
*All signs and spacing shall conform to MUTCD
*NOT TO SCALE
*Notify all local emergency services of closure times
and dates
*Sign spacing may be reduced to fit roadway conditions
*Alert Metro Impact 5 days in advance of any Bus stop
changes 206477.1140
*No Parking must be placed 72 hours in advance of work
*No Parking signs spaced out at 40’
Legend
28”cone
%Arrowboatd (Chevron)
RS-031 Bus Stop
4 Sign
Wi 4
W20-1
W20-7a
W4-2
W5-5
or1c Area
Location:Renton Ave S &S 1 32nd St Renton
R HAYES
CORPORATION
Description:One Lane Two Way Taper
Job Hours:8:30am -3:30 PM
Job Contact:2064234619
w5-5
TRAFFIC CONTROL PLAN
Phase I
N
ROAD
WORE
W20-1
PCMS12RentonAveClosedfrom830.3301.5SEC1.5SECFIELDLOCATE1MILEINADVANCEOFlANECLOSURESIGNINGFollowDetourANmtuLim3U5VCMPHTAPERTANGENT)50170408035/453060]25/302049JQllIRURAL1MJ185-.-35/4045/6060/6555170<350350’500’500’800’800’350’500’800’1500’x500’800’1500[Dm14/1212018AuthorAdamTaylor——Comments:TCS#008801PHONE#(425)658-3655IFAX#(425)658-3658CELL#(206)492-9364E-MAIL:adamtrafficconIrolsetvices.netLocation:RentonAveS&S132ndStDescription:ROADCLOSUREJobHours:8:30am.3:30PMJobContact:2064234619W20-W20-7b•JRHAYESCORP0RATIONW20-7aTRAFFICCONTROLPLAN[iaggertostoptraffictorelieveRentonAveNtrafficifneededPhase2NSROADWORKW20-1MINIMUMTAPERLENGThfL)INFEETROADTYPESUGGESTEDADVANCEWARMNGSIGNPUCEMENTDISTANCESEWVEENSIGNSLANEWiDTH(FEET)101112SPEED25/30ABPOSTEDSPEED(MPH)2530354045505560657010515020526550500550--115165259595500560--1251802453205400060208040C200’D200200xLegendj\,28”cone4Arrowboard(Chevron)RS-031BusStopSignW20-1cW20-2W20-3W20-7a€W20-7bWorkAreaJobNotes*AllsignsandspacingshallconformtoMUTCD*NOTTOSCALEANotifyalllocalemergencyservicesofclosuretimesanddates*Signspacingmaybereducedtofitroadwayconditions*AlertMetroimpact5daysinadvanceofanyBusstopchanges206-477-1140*NoParkingmustbeplaced72hoursinadvanceofwork*NoParkingsignsspacedoutat40
Renton Ave Sewer Work N
Detour Plan Close up view
JR HAYES Phase 2
CORPORATION
Location:Renton Ave S &S 132nd St Renton
/101—Description:Offlceri Detour
W20-7b
€1’W20-7a
I
W20-7a W20-7b W204
SUGGESIEDAD’IINCEWARNING SIGN ftACEMENT
ROAD TIRE DISTANCE BETWEEN SIGNS
SPEED
A B C 0
eI4I!fl 25130 200 200 200 X
35140 350 350 350 X
RURAL 45(60 500’500 500’500
8Wt(mrs 60l65 800 800’800’800’
55170 1500’1500’1500’1500
Job Notes
*All signs and spacing shall conform to MUTCD
*NOT TO SCALE
*Notify all local emergency services of closure times
and dates
*Sign spacing may be reduced to fit roadway condltiOflS
*Alert Metro Impact 5 days in advance of any Bus stop
changes 206-477-1140
*No Parking must be placed 72 hours In advance of wo
*No Parking signs spaced out at 40’
0)
0
0
C
W20-1
W20-7b
W20-7a
Job Hours:8:30am -4pm
Job Contact:206-423-6619
ROAD
WORA
W20-1 W204b W20-7a
z
to Direct Intersection
W20-7a
Date:6l27I2018AUthOC Mam Taylor
Comminb
TCS#O088Ol
PHONE #(425)658-3655
____________
FAX #(425)658-3658
CELL#(206)492-9364
E-MAI OflITOlSeVICe5.flRt
W20-1
oou,01T1
ID Task Name Duration Start Finish Actual Start
0 18009 Earlington - Baseline Schedule 9-4-2018 202 days Tue 12/12/17 Fri 10/19/18 Tue 12/12/17
1 Project Startup 104 days Tue 12/12/17 Wed 5/16/18 Tue 12/12/17
2 Bid Date 1 day Tue 12/12/17 Tue 12/12/17 Tue 12/12/17
3 Award and Contract 1 day Wed 5/16/18 Wed 5/16/18 Wed 5/16/18
4 Submittals and Compliance 5 days Mon 4/2/18 Fri 4/6/18 Mon 4/2/18
5 City of Renton Preconstruction Conference 1 day Mon 4/2/18 Mon 4/2/18 Mon 4/2/18
6 Project Startup 5 days Mon 4/9/18 Fri 4/13/18 Mon 4/9/18
7 Initial Site & Equipment Mobilization 2 days Mon 4/9/18 Tue 4/10/18 Mon 4/9/18
8 Initial TESC Measures 5 days Mon 4/9/18 Fri 4/13/18 Mon 4/9/18
9 Site Safety & Security 2 days Wed 4/11/18 Thu 4/12/18 Wed 4/11/18
10 Demolition & TESC 27 days Mon 4/9/18 Tue 5/15/18 Mon 4/9/18
11 Building Demolition 10 days Mon 4/16/18 Fri 4/27/18 Mon 4/16/18
12 Clearing & Grubbing 25 days Mon 4/9/18 Fri 5/11/18 Mon 4/9/18
13 Surface Removals 0 days Mon 4/16/18 Mon 4/16/18 Mon 4/16/18
14 Temp Sediment Ponds 2 days Mon 5/14/18 Tue 5/15/18 Mon 5/14/18
15 Earthwork 35 days Wed 5/9/18 Wed 6/27/18 Wed 5/9/18
16 Strip to Stockpile Vault 1 day Wed 5/9/18 Mon 5/14/18 Wed 5/9/18
17 Strip to Stockpile Site 5 days Mon 5/21/18 Fri 5/25/18 Mon 5/21/18
18 Cut to Fill 18 days Mon 6/4/18 Wed 6/27/18 Mon 6/4/18
19 Lot Grading Cut to Stockpile 14 days Wed 5/30/18 Wed 6/27/18 Wed 5/30/18
20 SG Road, Alleys, Sidewalk Cut to Stockpile 13 days Tue 6/5/18 Wed 6/27/18 Tue 6/5/18
21 Export Surplus Material 18 days Mon 5/14/18 Fri 6/22/18 Mon 5/14/18
22 Retaining Walls 9 days Mon 8/6/18 Thu 8/16/18 NA
23 Ex/Prep for Walls 2 days Mon 8/6/18 Tue 8/7/18 NA
24 Construct Pile Lag Retaining Wall 7 days Wed 8/8/18 Thu 8/16/18 NA
25 Utilities 100 days Mon 5/14/18 Thu 10/18/18 Mon 5/14/18
26 Stormwater Detention Vault 68 days Mon 5/14/18 Tue 9/4/18 Mon 5/14/18
27 Permit to ARH for NTP 1 day Thu 5/17/18 Thu 5/17/18 Thu 5/17/18
28 Hollow Core Procurement 0 days Thu 7/19/18 Thu 7/19/18 Thu 7/19/18
29 Structural Vault Excavation & Prep 14 days Mon 5/14/18 Fri 6/1/18 Mon 5/14/18
30 Construct Vault 25 days Mon 6/11/18 Wed 7/18/18 Mon 6/11/18
31 Vault Cure Time 3 days Wed 7/18/18 Mon 7/23/18 Wed 7/18/18
32 Backfill Vault Walls 0 days Sat 8/18/18 Sat 8/18/18 Sat 8/18/18
33 Set & Grout Hollow Core Lid 0 days Thu 7/19/18 Thu 7/19/18 Thu 7/19/18
34 Cap Vault Earthwork 2 days Mon 8/20/18 Tue 9/4/18 NA
35 Clean Vault 2 days Thu 7/19/18 Fri 7/20/18 NA
36 Sanitary Sewer System 34 days Tue 6/26/18 Wed 8/15/18 Tue 6/26/18
37 Connect To Existing Sewer 1 day Tue 6/26/18 Thu 6/28/18 Tue 6/26/18
38 Install Pipe& MH's 28 days Wed 6/27/18 Mon 8/13/18 Wed 6/27/18
39 Install Laterals 4.23 days Tue 7/10/18 Tue 8/14/18 Tue 7/10/18
40 Flush/Test/TV 1 day Wed 8/15/18 Wed 8/15/18 NA
18009 Earlington - Baseline Schedule 9-4-2018
Project Startup
Award and Contract
Submittals and Compliance
City of Renton Preconstruction Conference
Initial Site & Equipment Mobilization
Initial TESC Measures
Site Safety & Security
Demolition & TESC
Building Demolition
Clearing & Grubbing
Surface Removals
Temp Sediment Ponds
Strip to Stockpile Vault
Strip to Stockpile Site
Cut to Fill
Lot Grading Cut to Stockpile
SG Road, Alleys, Sidewalk Cut to Stockpile
Export Surplus Material
Retaining Walls
Ex/Prep for Walls
Construct Pile Lag Retaining Wall
Utilities
Stormwater Detention Vault
Permit to ARH for NTP
Hollow Core Procurement
Structural Vault Excavation & Prep
Construct Vault
Vault Cure Time
Backfill Vault Walls
Set & Grout Hollow Core Lid
Cap Vault Earthwork
Clean Vault
Sanitary Sewer System
Connect To Existing Sewer
Install Pipe& MH's
Install Laterals
Flush/Test/TV
28 2 7 12 17 22 27 2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24 29 4 9 14 19 24 29 3 8 13 18 23 28
April 2018 May 2018 June 2018 July 2018 August 2018 September 2018 October 2018 November 2018 December 2018
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Critical
Critical Split
Progress
Manual Progress
Slack
Page 1
Project: 18009 Earlington - Base
Date: Wed 9/5/18
ID Task Name Duration Start Finish Actual Start
41 Storm Drainage 14 days Tue 7/31/18 Fri 8/17/18 Tue 7/31/18
42 Install Storm Pipe& Structures 13 days Tue 7/31/18 Thu 8/16/18 Tue 7/31/18
43 Connect to Vault 2 days Tue 8/14/18 Wed 8/15/18 Tue 8/14/18
44 Flush/Test 1 day Fri 8/17/18 Fri 8/17/18 NA
45 Water 11 days Tue 9/4/18 Tue 9/18/18 Tue 9/4/18
46 Install Water Main & Valves 10 days Tue 9/4/18 Mon 9/17/18 Tue 9/4/18
47 Install Water Services 6 days Fri 9/7/18 Fri 9/14/18 NA
48 Install Hydrants 4 days Tue 9/4/18 Fri 9/7/18 NA
49 Boxes & Setters 6 days Mon 9/10/18 Mon 9/17/18 NA
50 Connect to Existing 1 day Tue 9/18/18 Tue 9/18/18 NA
51 Surface Improvements 23 days Tue 9/18/18 Thu 10/18/18 NA
52 Sugrade Roadway 5 days Tue 9/18/18 Mon 9/24/18 NA
53 Aggregte for Roadway/Curbs 4 days Tue 9/25/18 Fri 9/28/18 NA
54 Prep/Place Curb 5 days Mon 10/1/18 Fri 10/5/18 NA
55 Prep/Place Sidewalk 5 days Mon 10/8/18 Fri 10/12/18 NA
56 Fine Grade for Paving 3 days Mon 10/8/18 Wed 10/10/18 NA
57 Pave - Base Lift 2 days Thu 10/11/18 Fri 10/12/18 NA
58 Jack& Raise Utilities 4 days Mon 10/15/18 Thu 10/18/18 NA
59 Union Strike Shutdown 9 days Tue 8/21/18 Mon 9/3/18 Tue 8/21/18
60 Offsite Improvements 38 days Tue 7/24/18 Thu 9/27/18 Tue 7/24/18
61 Storm Drainage 14 days Mon 9/10/18 Thu 9/27/18 NA
62 Install Storm Pipe and Structures 12 days Mon 9/10/18 Tue 9/25/18 NA
63 Test& Flush 1 day Wed 9/26/18 Wed 9/26/18 NA
64 Roadway Patch 2 days Wed 9/26/18 Thu 9/27/18 NA
65 Sewer 7 days Mon 8/20/18 Tue 9/11/18 NA
66 Install Sanitary Pipe and Structures 5 days Mon 8/20/18 Fri 9/7/18 NA
67 Roadway Patch 2 days Mon 9/10/18 Tue 9/11/18 NA
68 Testing 1 day Mon 9/10/18 Mon 9/10/18 NA
69 Water 9 days Tue 7/24/18 Fri 8/3/18 Tue 7/24/18
70 Install Pipe, Fittings, and Connect 7 days Tue 7/24/18 Fri 8/3/18 Tue 7/24/18
71 Roadway Patch 0 days Fri 8/3/18 Fri 8/3/18 Fri 8/3/18
72 Surface Improvements 14 days Mon 9/10/18 Thu 9/27/18 NA
73 Prep/Place Curb & Sidewalks 5 days Mon 9/10/18 Fri 9/14/18 NA
74 Sawcut/Trim Edge 2 days Mon 9/17/18 Tue 9/18/18 NA
75 Shoulder Roadway Paving 3 days Wed 9/19/18 Fri 9/21/18 NA
76 Jack& Raise Utilities 4 days Mon 9/24/18 Thu 9/27/18 NA
77 Project Closeout 5 days Fri 10/12/18 Fri 10/19/18 NA
78 Substantial Completion 0 days Fri 10/12/18 Fri 10/12/18 NA
79 Punchlist, Cleanup, and Demobe 5 days Mon 10/15/18 Fri 10/19/18 NA
80 Final Completion 0 days Fri 10/19/18 Fri 10/19/18 NA
Storm Drainage
Install Storm Pipe& Structures
Connect to Vault
Flush/Test
Water
Install Water Services
Install Hydrants
Boxes & Setters
Connect to Existing
Surface Improvements
Sugrade Roadway
Aggregte for Roadway/Curbs
Prep/Place Curb
Prep/Place Sidewalk
Fine Grade for Paving
Pave - Base Lift
Jack& Raise Utilities
Offsite Improvements
Storm Drainage
Install Storm Pipe and Structures
Test& Flush
Roadway Patch
Sewer
Install Sanitary Pipe and Structures
Roadway Patch
Testing
Water
Install Pipe, Fittings, and Connect
Roadway Patch
Surface Improvements
Prep/Place Curb & Sidewalks
Sawcut/Trim Edge
Shoulder Roadway Paving
Jack& Raise Utilities
Project Closeout
Substantial Completion
Punchlist, Cleanup, and Demobe
Final Completion
28 2 7 12 17 22 27 2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24 29 4 9 14 19 24 29 3 8 13 18 23 28
April 2018 May 2018 June 2018 July 2018 August 2018 September 2018 October 2018 November 2018 December 2018
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Critical
Critical Split
Progress
Manual Progress
Slack
Page 2
Project: 18009 Earlington - Base
Date: Wed 9/5/18