Change Order No. 4
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contractor:
Gary Merlino Construction Co., Inc.
Contract No. CA "-1 -06-8-' - -----
--jA
Federal Aid No.: N
b--Ordered by -Engineer
Proposed by the Contractor (VECP)
O Unilateral
Original Contract Amount: 0(
3 9�' '6�
1' 100 244.69
0 'gi
$1,394,i6ioo
or
-Currjej�n�t Contract WAmo�uni�
t $1,100,
Estimated I�
Estimated Net Change This Order: $13,200.00
Co
10
[New Contract Amount: 0S
$1,087,044-69
Prepared By: Is By:
Ll
Resident
gte e r Al
- Is
I ,
Date ngineer (City of Re*ntTransportation Date'
Design Manager)
Reviewed By: Consent By:
Engineer of Record
Date Surety (Greater than 25% cost and/or 20% Date
time increase)
Review tarl By:
Endorsed By:
'W'/, -�� �4 14
City of nt in Project Manager ' �f - - --- ' —. -/ 'A94M4111
Da Contractor Z -J,8
Date
Reviewed By:
City Attorney �1�35.000,nd/., Date
change in scope)
Executed By:
City of #10 lub�ficftrks /o/a
/ ,,,,�o
te
Adminis rator /Mayor
Change Order No. 4
Contract Title: 2018---
street Patch and Overlay with Curb Ram
Contract No. CAG-18-068 , -,— I Ramps
Page 1 of 4
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
All work associated with Map Number 7 is eliminated from the contract.
Reason for Change:
Change is requested because of the existing utilities that are in the alley. Additional
utility coordination is required to complete this work.
Contract Provisions:
None.
Materials:
None.
Plans:
Map Number 7 — ELIMINATED
Summary of Quantities - UPDATED
Extension of Time:
The Time for Completion is extended 0 Working Days.
Equitable Adjustment:
This Change Order Does not include a significant change. See attached.
Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Change Order No, 4
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. (AG-1"68
Page 2 of 4
Estimate of Change Order Cost:
Change Order No. 4
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068
Page 3 of 4
Attachments:
® Map
Construction Change Directive (DOT Form 570-110 EF)
❑ Change Order Quotation (DOT Form 570-002)
El Materials — Project Documentation (DOT Form 550-004 EF)
❑ Project Labor List
El Applicant -Owned Equipment and Labor Project Documentation (DOT Form 550-003 EF)
❑ Force Account Equipment Rate Request (DOT Form 422-010 EF)
O Force Account Summary
❑ Equitable Adjustment Determination
Change Order No. 4
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068
Page 4 of 4
Map Number 7