Contract Title: 2018 Street Patch and Overlay with Curb Ram Change Order NO. S
P
Contractor: Gary Merlino Construction Co., Inc.
Contract No.: CAG-18-068
Federal Aid No.: N/A
9 Ordered by Engineer
D Proposed by the Contractor {VECP)
O Unilateral
7a'
Current Contract Amount:
Estimated Net Change This Order:-$12,000.0o T
New Contract Amount:,
Prepared By; Iss
Y�
Resident gineer Date Enginee ny Ren;on Transportation Date
Reviewed By: Design Manager)
Consent By:
Engineer of Record Date Surety (Greater than 25% cost and/or 20% Date
Reviewed By: time increase)
qC110 Renton Project Manager
Reviewed By:
City Attorney (Great�thn�000
and/or change in scope)
Endorsed By:
=4=� /DV /8
Date Contractor Date
Execu ed By:
/ J Date City of t ublic Works 4Dt
Adminis ator j Mayor
Change Order No. 5
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068
Page 1 of 4
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
The roadways shown on Map Number 3, Bronson Way S, Mill Avenue S and S 2"d Street,
will receive a full lane width edge grind.
Reason for Change:
In order to re-establish the 2% crown in the road, the City has determined that it is not
necessary to plan the entire area on Map Number 3 and an edge grind will be sufficient.
Materials:
Planing Bituminous Pavement — Edge Grind
Plans:
Map Number 3.
Extension of Time:
The Time for Completion is extended 0 Working Days.
Equitable Adjustment:
This Change Order includes a significant change: None.
Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Change Order No. 5
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068 Page 2 of 4
Estimate of Change Order Cost:
Change Order No. 5
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068 Page 3 of 4
Attachments:
Plans
Construction Change Directive (DOT Form 570-110 EF)
❑ Change Order Quotation (DOT Form 570-002)
❑ Materials — Project Documentation (DOT Form 550-004 EF)
❑ Project Labor List
Applicant -Owned Equipment and Labor Project Documentation (DOT Form 550-003 EF)
Force Account Equipment Rate Request (DOT Form 422-010 EF)
Force Account Summary
❑ Equitable Adjustment Determination
Change Order No. 5
Contract Title: 2018 Street Patch and Overlay with Curb Ramps
Contract No. CAG-18-068 Page 4 of 4