AMENDMENT NO. 1 TO AGREEMENT FOR SAILING CENTER
STRUCTURAL ASSESSMENT AT COULON BEACH PARK.
THIS AMENDMENT, dated November ��2018, is by and between the City of Renton (the
"City"), a Washington municipal corporation, and PND Engineers, Inc. ("Consultant"),
Washington Corporation. The City and the Consultant are referred to collectively in this
Amendment as the "Parties." Once fully executed by the Parties,this Amendment is effective as
of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-18-177, dated
September 7, 2018, to provide necessary services for the Coulon Beach Park Sailing Center Float
Assessment (referred to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the scope of work, change the
time for performance, and change the compensation in order to provide engineering design
documents for the structural repairs to the Sailing Center Float at Coulon Beach Park.
NOW THEREFORE, It is mutually agreed upon that CAG-18-177 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-1.
2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit A-1. All Work shall be performed by no later than
December 31, 2081.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased from $ 18,500.00 to $ 21,000.00 ,
plus any applicable state and local sales taxes. The additional compensation shall be
paid based upon Work actual performed according to the rate(s) or amounts specified
in Exhibit A-1, which is attached and incorporated herein.
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT
By: By:
Iti-- �
Kell Beymer J�.��� W�,��,sv� Jim C mpbell, .E.
unity Services Ad�inistrator President
(� ��1 �, November 6, 2018
Date Date
Approved as to Legal Form
.�SG'��n� ��Q�''"''�
Shane Moloney
Renton City Attorney
clb(518)
��
PAGE 2 OF Z
EXHIBIT A -�
� � �
ENGINEERS, INC.
Engineering Services: OCtObel'25� 2018
c;�.;l PND No. 184077
Planninv
5in.�y,;,,� Alan Wyatt, Capital Project Coordinator
stru�t�rai Parks Planning& Natural Resources
rer�«in� City of Renton
F;y��r����� 1055 South Grady Way
�ieOT�`h°`°� Renton,WA 98057-3232
�:nviro�mental
1�`a°sp°"�`;°° Subject: Gene Coulon Park Sailing Center Float Repairs —Amendment#01
Marine Facilities
Coastal Engineering
Dear Alan:
Contrac[Adminis[rauon
Constmction�;ngr.Sapport
Additional design services have been requested to provide structural design
ot��e5: documents for repair to the Sailing Center Float adjacent to the North turnaround
s�atti� at Gene Coulon Memorial Beach Park in Renton.The Sailing Center Float is a launch
i�sr r��urth;��-�n��s facility supporting sailing in the local community.
Scattic,Washington 98134
I�n�n�:2��.�24.�3s� The sailing float consists of four timber beams supporting approximately 21 timber
stringers, equally spaced. The stringers support both the timber decking and the
P�rtiana Styrofoam flotation billets. Based on the comprehensive structural inspection PND
zzo Nvv a�h���nUe completed in September 2018, a variety of minor to moderate repairs were
i��raa�a,or������zo� identified to bring the float back to a sound functional condition. The repairs will
rh�,n�:sos.�is.�3s� include the following:
�n�h<,ra�e • Replace all fender attachment, fascia, and trim boards with new PT boards
]50G Wcst 3Gth Ac-enue sized to match existing.
`�°`"°ra�e,,�ia`�;a��s°3 . Install new securement boards at the two blocks along Grid A where they are
l�h°°`:`'°�.s�'.'°'1 missing. It is recommended to add a plastic drum or other sealed flotation
device at the southeast corner to raise the freeboard so it is uniform with the
Juneau rest of the float.
93G0 Glacicr Hw}�,Suitc 100
�uneau,�i�5ka��soi • Replace all thru-bolt connections between stringers and beams. Replace all
rh��t:�o�ssr�.zo�s fascia board nails when fascia boards are replaced (corner brackets and thru-
bolts may be reused).
[Io�ston
• Reattach or replace plastic rub strips where noted.
19500 State I Iigh�vay 249
s��«��ss . Replace missing hardware at D20 pile hoop.
Ilouston,'fetias 77070
Phonc:832.930.4837 Deliverables
Two (2) drawings will be generated for the above noted repairs. Repair locations
will be noted on plan with associated details, as applicable, provided on a second
"�""'.�°a`"�;'net`�.`°m sheet. The drawings will reference the contract documents under CAG 18-062 for
general notes and specifications.
October 25, 2018 � Page 2
Assumptions
• Repair and replacement work will follow recommendations noted in the October 2018
inspection.
• Only repair/replacement of the damaged connection and structural elements in immediate
contact with the connection are included in this scope of work.
• No design of elements is included. Elements will be replaced to match original
damaged/decayed elements.
• City will provide compiled review comments within three weeks of the only submittal, 100%.
• Schedule for submittal of the 100%design package will be dictated by receipt of comments
pertaining to the October 2018 inspection report.
• Repair or replacement to structural elements not specifically identified in this scope of work are
excluded.
• Analysis of the existing float for vertical,wind or seismic loading unless the member has been
identified for repair or replacement is excluded.
Schedule
Following approval of this proposal by the City of Renton, PND agrees to perform the above-described
services and to diligently pursue the project and make every reasonable effort to finish all items in a timely
manner. The following is the proposed schedule for the project. PND will refine this schedule based on
further discussion with the City
General Schedule
Notice to Proceed Week of October 29, 2018
100% Design Drawings November 9, 2018
Fee
The total compensation for the work on this project shall be adjusted with this amendment. Note that
work associated with this amendment will be completed on a time and expenses basis.
Total Base Contract Amount (Hourly, NTE) $18,500
Amendment No. 01-Sailing Center Repair Desi�n (Hourly, NTE) $2,500
Total Fee $21,000
We look forward to performing this work for the City. If there are any questions regarding this
Amendment proposal, please call anytime.
Sincerely,
PND Engineers, Inc. � Seattle Office
tM- �,/
� C
Jo Ru P.E. Ji Campbell, P.E.
Senior Engineer President
� � � � m
Exhibit B
PROJECT TITLE-Renton SaiGng Center-Repairs 10/25/IS
CLIEM�.Ciry of Renton
PHASE
JOB NUMBER�.
LABOR:
Task Item Total Labor
No. Task(Scope of Services) 190.00 0.00 150A0 0.00 0.00 130.00 0.00 OAO 1 I5.00 0.00 0.00 Hours Cost
Repair Drawings 1 4 6 8 19 2,490.00
Labor Subtotal 1 0 4 0 0 6 0 0 8 0 0 19 2,490.00
TOTAL LABOR 2,490.00
EXPENSES:
Cost Expenses
Item Quantity Unit per Unit Markup Cost
Mileage 0 Mile OS40 I.l 0.00
Per Diem 0 Day 135.000 I.1 0.00
Miscellaneous All Req'd. L 1 0.00
Courier Service 0 Unrts 25.00 1.1 0.00
Plotting/PrintingM�crofiche 0 All 200.00 1.1 0.00
TOTAL EXPENSES 0.00
SUBCONSULTANTS:
Subcontract Subcon.
Amount Markup Cost
� 1_1 OAO
TOTALSOBCONSULTANTS 0•�
Total-Labor 2,490A0
Total-Expenses 0.00
To[al-Subconsultants 0.00
TOTAL- 2,490.00
Notes:
1
2
3
4
PND ENGINEERS, INC.
STANDARD RATE SCHEDULE
EFFECTIVE MAY 2015
Regular Rate
Professional: Senior Engineer VII $190.00
Senior Engineer VI $175.00
Senior Engineer V $160.00
Senior Engineer IV $150.00
Senior Engineer III $140.00
Senior Engineer II $130.00
Senior Engineer I $120.00
- $0.00
Staff Engineer V $115.00
Staff Engineer N $110.00
Staff Engineer III $105.00
Staff Engineer II $95.00
Staff Engineer I $90.00
- $0.00
Environmental Scientist VI $170.00
Environmental Scientist V $155.00
Environmental Scientist IV $140.00
Environmental Scientist III $125.00
Environmental Scientist II $110.00
Environmental Scientist I $95.00
GIS Specialist $95.00
- $0.00
Surveyors: Senior Land Surveyor III $125.00
Senior Land Surveyor II $115.00
Senior Land Surveyor I $105.00
- $0.00
Technicians: Technician VI $130.00
Technician V $115.00
Technician IV $95.00
Technician III $85.00
Technician II $75.00
Technician I $50.00
- $0.00
CAD Designer VI $115.00
CAD Designer V $105.00
CAD Designer N $90.00
CAD Designer III $75.00
Lookup Table
Senior Eng VII $190.00
Senior Eng VI $175.00
Senior Eng V $160.00
Senior Eng IV $150.00
Senior Eng III $140.00
Senior Eng II $130.00
Senior Eng I $120.00
- $0.00
Staff Eng V $115.00
Staff Eng IV $110.00
Staff Eng III $105.00
Staff Eng II $95.00
Staff Eng I $90.00
- $0.00
Envir Scientist VI $170.00
Envir Scientist V $155.00
Envir Scientist IV $140.00
Envir Scientist III $125.00
Envir Scientist II $110.00
Envir Scientist I $95.00
GIS Specialist $95.00
- $0.00
Sr Land Surveyor III $125.00
Sr Land Surveyor II $115.00
Sr Land Surveyor I $105.00
- $0.00
Tech VI $130.00
Tech V $115.00
Tech IV $95.00
Tech III $85.00
Tech II $75.00
Tech I $50.00
- $0.00
CAD Designer VI $l 15.00
CAD Designer V $105.00
CAD Designer IV $90.00
CAD Designer III $75.00