Loading...
HomeMy WebLinkAboutAdden 1 CAG-18-177,Adden #1-18 '�J AMENDMENT NO. 1 TO AGREEMENT FOR SAILING CENTER STRUCTURAL ASSESSMENT AT COULON BEACH PARK. THIS AMENDMENT, dated November ��2018, is by and between the City of Renton (the "City"), a Washington municipal corporation, and PND Engineers, Inc. ("Consultant"), Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties,this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-18-177, dated September 7, 2018, to provide necessary services for the Coulon Beach Park Sailing Center Float Assessment (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the scope of work, change the time for performance, and change the compensation in order to provide engineering design documents for the structural repairs to the Sailing Center Float at Coulon Beach Park. NOW THEREFORE, It is mutually agreed upon that CAG-18-177 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-1. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-1. All Work shall be performed by no later than December 31, 2081. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased from $ 18,500.00 to $ 21,000.00 , plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actual performed according to the rate(s) or amounts specified in Exhibit A-1, which is attached and incorporated herein. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT By: By: Iti-- � Kell Beymer J�.��� W�,��,sv� Jim C mpbell, .E. unity Services Ad�inistrator President (� ��1 �, November 6, 2018 Date Date Approved as to Legal Form .�SG'��n� ��Q�''"''� Shane Moloney Renton City Attorney clb(518) �� PAGE 2 OF Z EXHIBIT A -� � � � ENGINEERS, INC. Engineering Services: OCtObel'25� 2018 c;�.;l PND No. 184077 Planninv 5in.�y,;,,� Alan Wyatt, Capital Project Coordinator stru�t�rai Parks Planning& Natural Resources rer�«in� City of Renton F;y��r����� 1055 South Grady Way �ieOT�`h°`°� Renton,WA 98057-3232 �:nviro�mental 1�`a°sp°"�`;°° Subject: Gene Coulon Park Sailing Center Float Repairs —Amendment#01 Marine Facilities Coastal Engineering Dear Alan: Contrac[Adminis[rauon Constmction�;ngr.Sapport Additional design services have been requested to provide structural design ot��e5: documents for repair to the Sailing Center Float adjacent to the North turnaround s�atti� at Gene Coulon Memorial Beach Park in Renton.The Sailing Center Float is a launch i�sr r��urth;��-�n��s facility supporting sailing in the local community. Scattic,Washington 98134 I�n�n�:2��.�24.�3s� The sailing float consists of four timber beams supporting approximately 21 timber stringers, equally spaced. The stringers support both the timber decking and the P�rtiana Styrofoam flotation billets. Based on the comprehensive structural inspection PND zzo Nvv a�h���nUe completed in September 2018, a variety of minor to moderate repairs were i��raa�a,or������zo� identified to bring the float back to a sound functional condition. The repairs will rh�,n�:sos.�is.�3s� include the following: �n�h<,ra�e • Replace all fender attachment, fascia, and trim boards with new PT boards ]50G Wcst 3Gth Ac-enue sized to match existing. `�°`"°ra�e,,�ia`�;a��s°3 . Install new securement boards at the two blocks along Grid A where they are l�h°°`:`'°�.s�'.'°'1 missing. It is recommended to add a plastic drum or other sealed flotation device at the southeast corner to raise the freeboard so it is uniform with the Juneau rest of the float. 93G0 Glacicr Hw}�,Suitc 100 �uneau,�i�5ka��soi • Replace all thru-bolt connections between stringers and beams. Replace all rh��t:�o�ssr�.zo�s fascia board nails when fascia boards are replaced (corner brackets and thru- bolts may be reused). [Io�ston • Reattach or replace plastic rub strips where noted. 19500 State I Iigh�vay 249 s��«��ss . Replace missing hardware at D20 pile hoop. Ilouston,'fetias 77070 Phonc:832.930.4837 Deliverables Two (2) drawings will be generated for the above noted repairs. Repair locations will be noted on plan with associated details, as applicable, provided on a second "�""'.�°a`"�;'net`�.`°m sheet. The drawings will reference the contract documents under CAG 18-062 for general notes and specifications. October 25, 2018 � Page 2 Assumptions • Repair and replacement work will follow recommendations noted in the October 2018 inspection. • Only repair/replacement of the damaged connection and structural elements in immediate contact with the connection are included in this scope of work. • No design of elements is included. Elements will be replaced to match original damaged/decayed elements. • City will provide compiled review comments within three weeks of the only submittal, 100%. • Schedule for submittal of the 100%design package will be dictated by receipt of comments pertaining to the October 2018 inspection report. • Repair or replacement to structural elements not specifically identified in this scope of work are excluded. • Analysis of the existing float for vertical,wind or seismic loading unless the member has been identified for repair or replacement is excluded. Schedule Following approval of this proposal by the City of Renton, PND agrees to perform the above-described services and to diligently pursue the project and make every reasonable effort to finish all items in a timely manner. The following is the proposed schedule for the project. PND will refine this schedule based on further discussion with the City General Schedule Notice to Proceed Week of October 29, 2018 100% Design Drawings November 9, 2018 Fee The total compensation for the work on this project shall be adjusted with this amendment. Note that work associated with this amendment will be completed on a time and expenses basis. Total Base Contract Amount (Hourly, NTE) $18,500 Amendment No. 01-Sailing Center Repair Desi�n (Hourly, NTE) $2,500 Total Fee $21,000 We look forward to performing this work for the City. If there are any questions regarding this Amendment proposal, please call anytime. Sincerely, PND Engineers, Inc. � Seattle Office tM- �,/ � C Jo Ru P.E. Ji Campbell, P.E. Senior Engineer President � � � � m Exhibit B PROJECT TITLE-Renton SaiGng Center-Repairs 10/25/IS CLIEM�.Ciry of Renton PHASE JOB NUMBER�. LABOR: Task Item Total Labor No. Task(Scope of Services) 190.00 0.00 150A0 0.00 0.00 130.00 0.00 OAO 1 I5.00 0.00 0.00 Hours Cost Repair Drawings 1 4 6 8 19 2,490.00 Labor Subtotal 1 0 4 0 0 6 0 0 8 0 0 19 2,490.00 TOTAL LABOR 2,490.00 EXPENSES: Cost Expenses Item Quantity Unit per Unit Markup Cost Mileage 0 Mile OS40 I.l 0.00 Per Diem 0 Day 135.000 I.1 0.00 Miscellaneous All Req'd. L 1 0.00 Courier Service 0 Unrts 25.00 1.1 0.00 Plotting/PrintingM�crofiche 0 All 200.00 1.1 0.00 TOTAL EXPENSES 0.00 SUBCONSULTANTS: Subcontract Subcon. Amount Markup Cost � 1_1 OAO TOTALSOBCONSULTANTS 0•� Total-Labor 2,490A0 Total-Expenses 0.00 To[al-Subconsultants 0.00 TOTAL- 2,490.00 Notes: 1 2 3 4 PND ENGINEERS, INC. STANDARD RATE SCHEDULE EFFECTIVE MAY 2015 Regular Rate Professional: Senior Engineer VII $190.00 Senior Engineer VI $175.00 Senior Engineer V $160.00 Senior Engineer IV $150.00 Senior Engineer III $140.00 Senior Engineer II $130.00 Senior Engineer I $120.00 - $0.00 Staff Engineer V $115.00 Staff Engineer N $110.00 Staff Engineer III $105.00 Staff Engineer II $95.00 Staff Engineer I $90.00 - $0.00 Environmental Scientist VI $170.00 Environmental Scientist V $155.00 Environmental Scientist IV $140.00 Environmental Scientist III $125.00 Environmental Scientist II $110.00 Environmental Scientist I $95.00 GIS Specialist $95.00 - $0.00 Surveyors: Senior Land Surveyor III $125.00 Senior Land Surveyor II $115.00 Senior Land Surveyor I $105.00 - $0.00 Technicians: Technician VI $130.00 Technician V $115.00 Technician IV $95.00 Technician III $85.00 Technician II $75.00 Technician I $50.00 - $0.00 CAD Designer VI $115.00 CAD Designer V $105.00 CAD Designer N $90.00 CAD Designer III $75.00 Lookup Table Senior Eng VII $190.00 Senior Eng VI $175.00 Senior Eng V $160.00 Senior Eng IV $150.00 Senior Eng III $140.00 Senior Eng II $130.00 Senior Eng I $120.00 - $0.00 Staff Eng V $115.00 Staff Eng IV $110.00 Staff Eng III $105.00 Staff Eng II $95.00 Staff Eng I $90.00 - $0.00 Envir Scientist VI $170.00 Envir Scientist V $155.00 Envir Scientist IV $140.00 Envir Scientist III $125.00 Envir Scientist II $110.00 Envir Scientist I $95.00 GIS Specialist $95.00 - $0.00 Sr Land Surveyor III $125.00 Sr Land Surveyor II $115.00 Sr Land Surveyor I $105.00 - $0.00 Tech VI $130.00 Tech V $115.00 Tech IV $95.00 Tech III $85.00 Tech II $75.00 Tech I $50.00 - $0.00 CAD Designer VI $l 15.00 CAD Designer V $105.00 CAD Designer IV $90.00 CAD Designer III $75.00