Loading...
HomeMy WebLinkAboutPages from P_1703MOCF.002_ROW_REN_0026 Site Plan_180427_v1CAPITAL PROJECT #: 072443-00111500 PUGET DR (ROYAL HILL) PHASE IIMCI PERMIT NUMBER: 1703MOCF.002_ROW_REN_0026PROJECT STATUS: PERMITTINGSTATUS DATE: 04/27/2018OUTSIDE PLANT CONSTRUCTIONUNDERGROUND CONDUIT INSTALLATIONSITE CODE: 1703MOCF.002ENGINEERING SERVICESRENTON, WASHINGTONRIGHT-OF-WAY CONSTRUCTION PERMIT SHEET INDEXPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:OUTSIDE PLANT CONSTRUCTION PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024A-0104/27/2018ABMA11500 PUGET DR (ROYAL HILL) PHASE II UNDERGROUND CONDUIT INSTALLATIONDATE DESCRIPTION INITIAL1703MOCF.002_ROW_REN_0026CITY OF RENTON11500 PUGET DRRENTON, WAGENERAL PROJECT INFORMATION (A-SERIES)COVER SHEETSHEET INDEXPROJECT OVERVIEWSYMBOL KEYCONTACT INFORMATION (B-SERIES)CONTACT INFORMATION SHEETCONSTRUCTION PLANS (C-SERIES)KEY MAP SHEETSITE PLAN SHEETSSTANDARD NOTES & DETAILS (D-SERIES)GENERAL NOTESCONSTRUCTION DETAIL DRAWINGSSPECIFIC NOTES & DETAILS (E-SERIES)GENERAL NOTESCONSTRUCTION DETAIL DRAWINGSADDITIONAL INFORMATION (F-SERIES)NOT USEDA-00A-01A-02A-03B-01C-00 C-01 - C-23D-01 - D-02 D-03 - D-10E-01E-02 - E-04N/A PROJECT OVERVIEWPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:OUTSIDE PLANT CONSTRUCTION PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024A-0204/27/2018ABMA11500 PUGET DR (ROYAL HILL) PHASE II UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MOCF.002_ROW_REN_0026CITY OF RENTON11500 PUGET DRRENTON, WAPROJECT SCOPEADDRESS RANGE TABLEPRIMARY STREETADDRESSESCROSS STREET(S)S PUGET DR116TH AVE SE1315 - 240116561 - 16840ROLLING HILLS AVE SE, S PUGET DRE 168TH, 116TH AVE SEPROJECT QUANTITIESINSTALLQNTY2"D PVC COND. (MISSILE BORE)2"D PVC COND. (TRENCH)17"X30"X24" VAULT(S)132 LF24 LF530"X48"X36" VAULT(S)124"X36"X24" VAULT(S)42"D PVC COND. (DIRECT. BORE)4512 LF PROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:OUTSIDE PLANT CONSTRUCTION PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024A-0304/27/2018ABMA11500 PUGET DR (ROYAL HILL) PHASE II UNDERGROUND CONDUIT INSTALLATIONDATEDESCRIPTIONINITIAL 1703MOCF.002_ROW_REN_0026CITY OF RENTON11500 PUGET DRRENTON, WASYMBOL KEYMCI PROPOSED CONSTRUCTIONLMPEDSXLDIRECTIONAL BOREOPEN TRENCH17"X30"X24" VAULT24"X36"X24" VAULT24"X36"X36" VAULT30"X48"X36" VAULT36"X76"X42" VAULTBORE PITMCI EXISTING/FUTURE CONSTRUCTIONEXISTING MCI METRO CONDUITEXISTING MCI METRO VAULTFUTURE 17"X30"X24" VAULTFUTURE 24"X36"X24" VAULTFUTURE 24"X36"X36" VAULTFUTURE 30"X48"X36" VAULTFUTURE 36"X76"X42" VAULTLXLMSPEDVFUTURE MCI METRO CONDUITOTHER UTILITIESWATER LINEFIRE HYDRANTSDSTORMWATER LINESTORMWATER ACCESSWASTEWATER LINEWWWASTEWATER MANHOLEWATER VALVEOVERHEAD POWER LINEUNDERGROUND POWER LINETFPOWER TRANSFORMEREPOWER MANHOLEJPOWER JUNCTION BOXEPOWER CABINETEVPOWER VAULTPOLESTREET LIGHTTRAFFIC LIGHTWATER METERGAS LINEGAS METERTELECOM MANHOLETELECOM CABINETTELECOM VAULTUNKNOWN MANHOLEGAS VALVEUNKNOWN VAULTTELECOM LINEGMTTCTMHUVMHPROPOSED MANHOLEWVSTORMWATER CATCH BASINCB CONTACT INFORMATIONONE CALL SYSTEM (UTILITY LOCATES)MCI METRO INC.UTILITIESMCI UTILITY LOCATE RAILROADSFEDERAL GOVERNMENTOTHERCOUNTY GOVERNMENTSTATE GOVERNMENT1-800-624-9675CITY GOVERNMENTPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:OUTSIDE PLANT CONSTRUCTION PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024B-0104/27/201811500 PUGET DR (ROYAL HILL) PHASE II UNDERGROUND CONDUIT INSTALLATION 1703MOCF.002_ROW_REN_0026CITY OF RENTON11500 PUGET DRRENTON, WAOUTSIDE PLANT ENGINEERING:OUTSIDE PLANT CONSTRUCTION:RIGHT-OF-WAY:CONTRACTS:OTHERS:ENGINEERING CONTRACTOR:CONSTRUCTION CONTRACTOR:SENIOR PROJECT ENGINEER:LOUISE POPELKAPROJECT ENGINEER:ALAN BARPROJECT SUPERVISOR:FIELD CONSTRUCTION SUPERINTENDENT:MANAGER:AGENT:MANAGER:NAME OF FIRM:MASTECPROJECT MANAGER:ERIKA YOUNGPROJECT SUPERVISOR:CASEY CHRISTLIEBNAME OF FIRM:FORESITE GROUPPROJECT MANAGER:LUKE RICKELPROJECT ENGINEER:ARNALDO BLANCO(210)722-6429(787)349-2960(267)969-0345(509)823-0965(425)240-0238(425)599-9244AT&T LONG DISTANCE: DANIEL MCGEOUGHAT&T METRO: CLIFF ROBERTS(425)896-9830(425)896-9851AT&T MOBILITY/SINGULAR (SOUTH OF I-90): GARY TOPORKEAT&T MOBILITY/CINGULAR: BILL LACOUNT(253)680-2403(360)395-5425CENTURY LINK: IVAN ESMERALCOMCAST: JILL LOOK(425)427-9903(206)396-6032COAL CREEK UTILITY DISTRICT: PATRICK MARTINELI/INTEGRA: ERIC LAYTON(206)255-1961(425)970-7763FRONTIER COMMUNICATIONS NW: JAY SCHWAB(425)263-4019LEVEL 3 COMMUNICATIONS: KRISHNA MITCHELLONEFIBER COMMUNICATIONS: BILL BODIN(720)387-3342(916)765-2074OLYMPIC PIPELINE CO.: TIMOTHY FEHRPUDGET SOUND ENERGY: ANDY SWAYNE(425)427-9903(425)462-3852PUDGET SOUND ENERGY EMERGENCY DISPATCHPSE/INFRASOURCE: AURELIE JOHANNSON(888)225-5773(425)466-4771PSE/POTELCO: BOB CARLSENSEATTLE PUBLIC UTILITIES: RICHARD COX(425)864-0496(206)900-4434T-MOBILE USA: NOTICE ADDRESSVERIZON WIRELESS NW: LELAH VAGA1-877-373-0093(425)603-8275XO COMMUNICATIONS/VERIZON WIRELESS: CHRISTOPHER MAPESZAYO FIBER SOLUTIONS: JOSEPH MORTON(206)315-5014(253)255-1917PROJECT MANAGER:CIARA MCDONNELL-RAY(425)606-7704CITY OF RENTONDEVELOPMENT SERVICES REPRESENTATIVE:HOLLY POWER(425)430-7266CITY OF RENTONTRANSPORTATION SYSTEMS DIVISION:CCHRIS BARNES(425)430-7200 C-01C-02C-03C-04C-05C-06C-07C-08C-09C-10C-11C-12C-13C-14C-15C-16C-17C-18C-19C-20C-21C-22C-23S PUGET DR116TH AVE SESE 168TH STS PUGET DRNORTHPROJECT:REVISIONSSCALEEXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATIONS SERVICES, INC.. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEET:OUTSIDE PLANT CONSTRUCTION PROJECT ID NUMBER:PERMITTING ENTITY:PROJECT LOCATION:Foresite Group, Inc.3000 E Cesar Chavez St.Suite 400Austin, TX 78702w | www.fg-inc.neto | 334.887.6064f | 334.887.6024C-0004/27/2018ANY CURB, GUTTER OR SIDEWALK REPAIR TO BE DONE INACCORDANCE WITH CITY OF RENTON STANDARDS. SEESECTION E FOR SPECIFICATIONSSIDEWALKE.O.PR.O.W.EDGE OF PAVEMENTRIGHT OF WAYBORE/MISSILE BOREOPEN TRENCHLEGEND:STREET CENTERLINEC.L.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ONDOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT ISTHE CONTRACTOR'S RESPONSABILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIESWITHIN CONSTRUCTION PATH.ALL INSTALLATIONS MUST COMPLY WITH MINIMUMHORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.CAUTION!!ANY DISTURBANCE TO INFRASTRUCTURE WITHIN 15 FEET OFADA RAMP WILL REQUIRE ENTIRE RAMP TO BE REPAIRED INACCORDANCE WITH ALL REQUIRED ADA STANDARDS ANDSPECIFICATIONS.NOTE TO CONTRACTOR:ANY BOREPITS DUG NEXT TO DRIPLINE OF AN EXISTING TREETO BE DUGGED USING HYDRO VACCUUM EXCAVATION.ALL TELECOM UTILITY LOCATIONS ON PRINT ARE BASED ONFIELD SURVEY AND OBSERVATIONS. LOCATIONS MAY NOT BEACCURATE OR COMPLETE.CITY OF RENTONN/AABMADATE DESCRIPTION INITIAL 11500 PUGET DR (ROYAL HILL) PHASE II UNDERGROUND CONDUIT INSTALLATION 11500 PUGET DRRENTON, WA1703MOCF.002_ROW_REN_0026N/A